ECE 477 Design Review Team 7  Spring 2007 Joe Land Ben Fogle James O’Carroll Elizabeth Strehlow.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Advertisements

ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
Jason CrayJoseph Mundackal Michael WarscoRyan Sherlock.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
IDine A Camera based Multi-touch Dining table Tejas D Kulkarni Abhisheyk Gaur Himanshu Raghav Ankur Mishra.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
ECE 477 Design Review Group 1  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Shiv Yukeun Donghan Robert.  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 4  Fall 2010 (L to R) Andy Sydelko, Chris Cadawallader, Mike Wiliams, Craig Pilcher.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
Group 8: Video Game Console Team Members: Rich Capone Hong Jin Cho Dave Elliott Ryan Gates.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
FLAC Audio Player An ability to decode files stored in the FLAC format. An ability to select files stored on the device. An ability to display visualization.
ECE 477 DESIGN REVIEW FEST – FALL OUTLINE  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
The “Drink Mixer” Design Constraints. Project Success Criteria An ability to digitally mix audio and adjust individual levels An ability to digitally.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
Team 6. Guitar Audio Amplifier Audio Codec DSP Wireless Adapter Motor Array PC LCD Display LED Arrays Pushbutton or RPG Input Device
Digital Sound Projection ECE 477 Group 6 Design Constraint Analysis Steve Anderson Mike Goldfarb Shao-Fu Shih Josh Smith.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Design Review Team 12  Spring 2007
ECE 477 Design Review Team 8  Spring 2007
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Team 6 - Spring 2012
ECE 477 Design Review Group 6  Fall 2005
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Design Review Team ??  Fall 2012
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
Presentation transcript:

ECE 477 Design Review Team 7  Spring 2007 Joe Land Ben Fogle James O’Carroll Elizabeth Strehlow

Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation PCB layout Software design/development status Project completion timeline Questions / discussion

Project Overview Modern active loudspeaker system –Intended for consumers –Replaces audio receiver/passive loudspeaker combination Digital manipulation of sound field –User controlled direction –Allows for non-ideal placement in a room

Project-Specific Success Criteria 1. An ability to receive and act upon command from an IR remote. 2. An ability to delay-steer the wave-front of a loudspeaker array (up/down, left/right). 3. An ability to amplitude-shade the wave-front of a loudspeaker array (adjust effective array length). 4. An ability to perform (third-octave) amplitude equalization. 5. An ability to control loudspeaker settings thorough a user interface.

ADSP Analog Switch Parallel Port SPI AD1835A SRAM 4MB Audio Pre-A/D Analog Circuit JTEG Header L R x 2 Audio Inputs Audio Post D/A Analog Circuit 10W Class D Power Amplifier CODEC DSP 2” Speaker 55W Class AB Power Amplifier 8” Subwoofer x 8 FLASH 8MB 25 MHz Oscillator JTEG Port Reset PB Control/User Interface Header DAI Power Supply +12V 8A + A5V 2A Power Regulation +5V +3.3V +1.2V Parallel Port Active Loudspeaker Unit ID Switch Block Diagram

Control Box I/O ATmega16 Touch Button Controller 8 Touch Buttons 8 Program Header Infrared 36kHz Sensor Int. Serial to Video Converter SCI 5.5” LCD TV SPI Control/User Interface Header μCμC Power Regulation +12V +5V +3.3V

Component Selection Rationale Microcontroller –ATmega16 –Freescale 9S12 DSP –ADSP SHARC: Development Environment –TI Aureus™ TMS320DA708 Audio amplifier –TPA3001D1: Class D –TDA2006: Class AB

Packaging Design 40” 9”12” Active Loudspeaker Unit 2” Loudspeaker 8” Subwoofer Array of 8 Loudspeakers Enclosure (MDF) Small Sealed Chamber for each 2” Loudspeaker Sealed Chamber for each 8” Subwoofer Power Supply Subwoofer Amplifier DSP and 8 Channel Amplifier Board Dimensioned DrawingCut-away Drawing Front ViewSide ViewFront ViewSide View

Packaging Design Control/User Interface User Interface Volume + - Input CD TV 7.5” 5.0” 2.0 User Interface Volume + - Input CD TV Capacitance Touch Buttons 5.5” LCD TV Monitor Lexan® Cover Molded Fiberglass Case Standoff Prototype Board for User Interface Touch Button Sensor Video OUT (TV) IR Sensor

Schematic/Theory of Operation DSP/Reset Major Components: –DSP: ADSP –Wireless Transceiver: TRF-2.4G Other Components: –Supply Voltage Monitor: ADM708SARZ –25MHz Oscillator: SGR-8002DC-PCC-ND –SPI Header –JTEG Header

Schematic/Theory of Operation DSP/Reset

Schematic/Theory of Operation Memory Major Components: –SRAM: CYC1049CV33 –Flash: M29W800DB Other Components: –Decoder/Demultiplexer: 74LVC138AD –D-type Latch: 74LVC373APW

Schematic/Theory of Operation Memory

Schematic/Theory of Operation Audio Path Major Components: –Codec: AD1835AASZ –Class-D Audio Power Amplifier: TDA3001D1 Other Components: –Quad SPST Switch: ADG412BR –Low Noise Op-amps: AD8606ARZ –12.288MHz Oscillator: SGR-8002CA-PCC-ND

Schematic/Theory of Operation Audio Input

Schematic/Theory of Operation Analog Audio

Schematic/Theory of Operation Audio Out (1 of 8)

Schematic/Theory of Operation Power Major Components: –Voltage Regulator: ADP3336ARMZ –Step-down Regulator: LTC1877 –Step-down DC-to-DC Controller: ADP1864 –P-channel MOSFET: FDC658P –Power Supply: Commercial Switching Supply Other Components –Through holes

Schematic/Theory of Operation Power A5V ADP1864

Schematic/Theory of Operation Control Box Major Components: –Microcontroller: ATmega16 –Wireless Transceiver: TRF-2.4G –Touch Buttons: E240B –IR Receiver: Radio Shack –Serial to Video Module: ezVID

Schematic/Theory of Operation Control Box

PCB Layout

Power Supply

PCB Layout DSP/Reset/Memory

PCB Layout Audio In

PCB Layout Audio Out

Software Design/Development Status Reset / Power-on Software Initialization (Peripherals, Enable interrupts) Command/Butto n flag set? Reset flag. Update GUI. Transmit data to speakers. Shift in packet contents Process Packet RTI IRQ (Wifi) Yes No

Software Design/Development Status Determine bit received and store it. RTI IRQ interrupt (IR sensor) Set button flag RTI RTI interrupt Button pressed? No Yes Whole command recognized? Set command flag No Yes

Software Design/Development Status Hardware Boot (loads program from Flash) Software Initialization “New data” flag set? Reset “New data” flag. Load new delays, amplitudes, and equalizer coefficients. Load new sample into equalizer buffer. Equalize sample using FIR filter on buffer Put equalized result into delay line buffer Load elements with samples from delay line buffer. RTI Serial port received interrupt Yes No

Software Design/Development Status Begin SPI DMA transfer of received data into memory RTI IRQ interrupt Check received data for lost packet. Send retransmit request via SPI DMA transfer Set “New data” flag RTI SPI transfer complete Lost packet? Yes No

Project Completion Timeline Group Timeline Success Criteria (GTSC) GTSC #1: March 2—Final PCB complete GTSC #2: March 19—Enclosures built GTSC #3: March 30—Components soldered GTSC #4: April 9—Working board GTSC #5: April 27—Project completed

Questions / Discussion