Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, 21-27 March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.

Slides:



Advertisements
Similar presentations
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
Advertisements

CHEP 2012 – New York City 1.  LHC Delivers bunch crossing at 40MHz  LHCb reduces the rate with a two level trigger system: ◦ First Level (L0) – Hardware.
1P. Vande Vyvre - CERN/PH ALICE DAQ Technical Design Report DAQ TDR Task Force Tome ANTICICFranco CARENA Wisla CARENA Ozgur COBANOGLU Ervin DENESRoberto.
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/27 A Control Software for the ALICE High Level Trigger Timm.
Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
Use of ROOT in the D0 Online Event Monitoring System Joel Snow, D0 Collaboration, February 2000.
ALICE Data Challenge V P. VANDE VYVRE – CERN/PH LCG PEB - CERN March 2004.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
The Application of DAQ-Middleware to the J-PARC E16 Experiment E Hamada 1, M Ikeno 1, D Kawama 2, Y Morino 1, W Nakai 3, 2, Y Obara 3, K Ozawa 1, H Sendai.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
System performance monitoring in the ALICE Data Acquisition System with Zabbix Adriana Telesca October 15 th, 2013 CHEP 2013, Amsterdam.
1 Status report on DAQ E. Dénes – Wigner RCF/NFI ALICE Bp meeting – March
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
Computing Infrastructure Status. LHCb Computing Status LHCb LHCC mini-review, February The LHCb Computing Model: a reminder m Simulation is using.
R. Divià, U. Fuchs, P. Vande Vyvre – CERN/PH 13 June 2012.
1 Alice DAQ Configuration DB
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
The ALICE DAQ: Current Status and Future Challenges P. VANDE VYVRE CERN-EP/AID.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
The ALICE Data-Acquisition Software Framework DATE V5 F. Carena, W. Carena, S. Chapeland, R. Divià, I. Makhlyueva, J-C. Marin, K. Schossmaier, C. Soós,
What is expected from ALICE during CCRC’08 in February.
Offline shifter training tutorial L. Betev February 19, 2009.
ALICE Computing Model The ALICE raw data flow P. VANDE VYVRE – CERN/PH Computing Model WS – 09 Dec CERN.
CERN Physics Database Services and Plans Maria Girone, CERN-IT
F.Carena, CERN/ALICE The ALICE Experiment Control System F. Carena / CERN-PH.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
News on GEM Readout with the SRS, DATE & AMORE
CERN Database Services for the LHC Computing Grid Maria Girone, CERN.
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
The CMS CERN Analysis Facility (CAF) Peter Kreuzer (RWTH Aachen) - Stephen Gowdy (CERN), Jose Afonso Sanches (UERJ Brazil) on behalf.
R.Divià, CERN/ALICE 1 Workshop on 12 March 2013 Data storage current status.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
P. Vande Vyvre – CERN/PH CERN – January Research Theme 2: DAQ ARCHITECT – Jan 2011 P. Vande Vyvre – CERN/PH2 Current DAQ status: Large computing.
Oracle for Physics Services and Support Levels Maria Girone, IT-ADC 24 January 2005.
Irina Makhlyueva ALICE DAQ group 28 February 2005 DATE multi-stream recorder.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
R.Divià, CERN/ALICE Challenging the challenge Handling data in the Gigabit/s range.
Filippo Costa ALICE DAQ ALICE DAQ future detector readout October 29, 2012 CERN.
ALICE Online Upgrade P. VANDE VYVRE – CERN/PH ALICE meeting in Budapest – March 2012.
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
Pierre VANDE VYVRE ALICE Online upgrade October 03, 2012 Offline Meeting, CERN.
ALICE RRB-T ALICE Computing – an update F.Carminati 23 October 2001.
Monitoring for the ALICE O 2 Project 11 February 2016.
R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.
11/01/20081 Data simulator status CCRC’08 Preparatory Meeting Radu Stoica, CERN* 11 th January 2007 * On leave from IFIN-HH.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
The ALICE data quality monitoring Barthélémy von Haller CERN PH/AID For the ALICE Collaboration.
COMPASS DAQ Upgrade I.Konorov, A.Mann, S.Paul TU Munich M.Finger, V.Jary, T.Liska Technical University Prague April PANDA DAQ/FEE WS Игорь.
P. Vande Vyvre – CERN/PH for the ALICE collaboration CHEP – October 2010.
ALICE Full Dress Rehearsal ALICE TF Meeting 02/08/07.
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
ALICE Computing Data Challenge VI
(Prague, March 2009) Andrey Y Shevel
ALICE moves into warp drive
IT-DB Physics Services Planning for LHC start-up
LHC experiments Requirements and Concepts ALICE
TPC Commissioning: DAQ, ECS aspects
IEEE NPSS Real Time Conference 2009
Offline shifter training tutorial
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
ALICE Data Challenges Fons Rademakers Click to add notes.
Offline framework for conditions data
Presentation transcript:

Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva (CERN), Pierre Vande Vyvre (CERN) Valerio Altini (CERN), Franco Carena (CERN), Wisla Carena (CERN), Sylvain Chapeland (CERN), Vasco Chibante Barroso (CERN), Filippo Costa (CERN), Filimon Roukoutakis (CERN), Klaus Schossmaier (CERN), Csaba Soòs (CERN), Barthelemy Von Haller (CERN) For the ALICE collaboration

Roberto Divià, CERN/ALICE 2 CHEP 2009, Prague, March 2009 PDSCASTOR 1.25 GB/s ALICEenvironment for the GRID AliEn GDC ALICE trigger, DAQ & HLT CTP LTU TTC FEROFERO LTU TTC FEROFERO LDC LDC Storage Network Transient Data Storage (TDS) D-RORC D-RORC LDC D-RORC D-RORC LDC D-RORC HLT Farm 25 GB/s Mover DAQ Network

Roberto Divià, CERN/ALICE 3 CHEP 2009, Prague, March 2009 ALICE trigger, DAQ & HLT PDSCASTOR 1.25 GB/s ALICEenvironment for the GRID AliEn GDC Storage Network Transient Data Storage (TDS) Mover DAQ Network

Roberto Divià, CERN/ALICE 4 CHEP 2009, Prague, March 2009 Our objectives Ensure steady and reliable data flow up to the design specs Ensure steady and reliable data flow up to the design specs Avoid stalling the detectors with data flow slowdowns Avoid stalling the detectors with data flow slowdowns Give sufficient resources for online objectification in ROOT format via AliROOT Give sufficient resources for online objectification in ROOT format via AliROOT  very CPU-intensive procedure Satisfy needs from ALICE parallel runs and from multiple detectors commissioning Satisfy needs from ALICE parallel runs and from multiple detectors commissioning Allow a staged deployment of the DAQ/TDS hardware Allow a staged deployment of the DAQ/TDS hardware Provide sufficient storage for a complete LHC spill in case the transfer between the experiment and the CERN Computer Center does not progress Provide sufficient storage for a complete LHC spill in case the transfer between the experiment and the CERN Computer Center does not progress PDSCASTOR 1.25 GB/s ALICEenvironment for the GRID AliEn GDC Storage Network Transient Data Storage (TDS) Mover DAQ Network

Roberto Divià, CERN/ALICE 5 CHEP 2009, Prague, March 2009 Current TDS architecture CVFS over IP 5 switches Qlogic SANBox 5602: FC 4 Gb: equipment, PCs, storage FC 4 Gb: equipment, PCs, storage FC 10 Gb: inter-switches connections FC 10 Gb: inter-switches connections 5 * 5 Disk Arrays Infotrend A16F models G2422 & G * 5 Disk Arrays Infotrend A16F models G2422 & G * 15 disk volumes 5 * 15 disk volumes Total maximum space: 59 TB Total maximum space: 59 TB CVFS: StorNext CVFS: StorNext Handled by the Transient Data Storage Manager (TDSM) Handled by the Transient Data Storage Manager (TDSM) 5 * ( 6 * GDCs + 2 * Movers ) … … +

Roberto Divià, CERN/ALICE 6 CHEP 2009, Prague, March 2009 Future upgrades Two switches SANBox 9000, 8 blades maximum each: 9 * Blades with 16 ports FC 4 Gb: equipment, hosts, storage 9 * Blades with 16 ports FC 4 Gb: equipment, hosts, storage 2 * Blades with 4 ports FC 10 Gb: inter-switches connections 2 * Blades with 4 ports FC 10 Gb: inter-switches connections

Roberto Divià, CERN/ALICE 7 CHEP 2009, Prague, March 2009 emptying full filling CASTOR TDSM architecture TDS GDCGDCGDC Feedback to the CTP TDSMFileMover TDSMFileMover TDSMManager DAQ network CERNGPN MSSnetwork AliEnspooler TDSMconfiguration & control DB & control DB GDC TDSMFileMover TDSMFileMover free disabled AliEn DAQlogbook

Roberto Divià, CERN/ALICE 8 CHEP 2009, Prague, March 2009 Monitoring TDSM DB to get the status and history of the TDS/TDSM

Roberto Divià, CERN/ALICE 9 CHEP 2009, Prague, March 2009 Monitoring Logbook to monitor the status of the migration

Roberto Divià, CERN/ALICE 10 CHEP 2009, Prague, March 2009 Monitoring Lemon to monitor the system setup and metrics

Roberto Divià, CERN/ALICE 11 CHEP 2009, Prague, March 2009 Validation & testing u Small “lab style” test setups m Special running mode where:  a single LDC can inject several real events  the Event builder unpacks it as for the original event m Dedicated “write and forget” CASTOR pool m Ad-hoc “black hole” AliEn registration service u Profiling during detectors commissioning and cosmic runs u ALICE Data Challenges m Run between 1999 and 2006 m Periodic full-chain tests (ALICE DAQ/Offline + IT department)

Roberto Divià, CERN/ALICE 12 CHEP 2009, Prague, March 2009 ALICE Data Challenges u Define an architecture (HW and SW) m Re-use existing idling components (IT and ALICE) m If needed, add some glue here and there  Earlier ADCs: lots of glue! u Evaluate and profile the individual components u Put them together and check the result u Do short sustained tests (hours) u Run the final Challenge (7 days) with two targets: m Sustained overall data rate m Amount of data to PDS u Repeat the exercise year after year with more challenging objectives u Achieve quasi-ALICE results with minimum glue right before ALICE commissioning

Roberto Divià, CERN/ALICE 13 CHEP 2009, Prague, March 2009 The TDS in 2008 u 25 February to 9 March 2008: ALICE Cosmic runs m 1500 runs m 340 hours m 70 TB u 3+4Q08: m 6800 runs m 3300 hours m 108 TB

Roberto Divià, CERN/ALICE 14 CHEP 2009, Prague, March 2009 In conclusion… u Continuous evaluation of HW & SW components proved the feasibility of the TDS/TDSM architecture u All components validated and profiled u ADCs gave highly valuable information for the R&D process m Additional ADCs added to the ALICE DAQ planning for 2009 u Detector commissioning went smoothly & all objectives were met u No problems during cosmic and preparation runs u Staged commissioning on its way u Global tuning in progress We are ready for LHC startup