June 30, 2010 10th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Sha Bai, Philip Bambade, Glen White FJPPL – FKPPL ATF2 workshop LAL, 11~13 February, 2013 Orthogonality of beam waist corrections in the presence of IPBSM.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
BPM Orbit Data Analysis with Wakefields Glen White, SLAC January 2013.
ATF2 Tuning Updates Glen White, SLAC Sept
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Summary of Status Towards Goal1 and Future Plans Glen White, SLAC 15 th ATF2 Project Meeting, KEK January
Planning Ahead for Oct-Dec Operations Period Glen White, SLAC June 28, 2012 ATF2 14 th Collaboration Meeting, KEK.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Operational Experience with ATF2 Beam Diagnostics Glen White, SLAC On Behalf of ATF2 Collaboration TIPP, Chicago, June
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
Wakefield effect in ATF2 Kiyoshi Kubo
ATF2 Lattice v4.5 Matching and Tuning Performance with Lucretia Glen White, SLAC LCWS2011 Granada, Spain.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
On Multipole Measurements, Optics and Magnet Swapping To Swap, or not to Swap, that is the question: Whether 'tis Nobler in the mind to suffer The Slings.
Integrated ATF2 Dynamic Tuning Simulations Glen White, LAL/SLAC ATF2 Software Workshop June 2008 Simulation overview. Tuning for 37nm IP vertical beam.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
IP Tuning Task Updates Glen White, SLAC January
ATF2 Status N.Terunuma, KEK
Expected hardware status and Priority of the commissioning task
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
Emittance Dilution and Preservation in the ILC RTML
ATF2 IP Tuning Task Simulation Updates
Updates on IR and FF for super-B factory
Beam-Based Alignment Results
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Presentation transcript:

June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation

10 th ATF2 Proj. Mtg. Cont. Run.: 2 ATF2 Scaled ILC final focus ATF2: model of ILC beam delivery goals: ~37nm beam size; nm level beam stability Dec 2008: first pilot run; Jan 2009: hardware commissioning Feb-Apr 2009: large  ; BSM laser wire mode; tuning tools commissioning Oct-Dec 2009: commission interferometer mode of BSM & other hardware

10 th ATF2 Proj. Mtg. Cont. Run.: 3 ATF International organization is defined by MOU signed by 25 institutions: MOU: Mission of ATF/ATF2 is three-fold: ATF, to establish the technologies associated with producing the electron beams with the quality required for ILC and provide such beams to ATF2 in a stable and reliable manner. ATF2, to use the beams extracted from ATF at a test final focus beamline which is similar to what is envisaged at ILC. The goal is to demonstrate the beam focusing technologies that are consistent with ILC requirements. For this purpose, ATF2 aims to focus the beam down to a few tens of nm (rms) with a beam centroid stability within a few nm for a prolonged period of time. Both the ATF and ATF2, to serve the mission of providing the young scientists and engineers with training opportunities of participating in R&D programs for advanced accelerator technologies.

10 th ATF2 Proj. Mtg. Cont. Run.: 4

10 th ATF2 Proj. Mtg. Cont. Run.: 5 ATF2 proposed IP parameters compared with ILC ATF2 parameters & Goals A/B Scaled design of ILC local- chromaticity correction style optics. Same chromaticity as ILC optics. ATF2 goal for beam size is ~37nm ATF2 goal of 37nm, scaled to 250 GeV, would correspond to 2.7nm (~twice smaller than ILC design value of 5.7nm) The intermediate “ILC-scaled” milestone of ATF2 is ~80nm

10 th ATF2 Proj. Mtg. Cont. Run.: 6 ATF2 Facility Layout

10 th ATF2 Proj. Mtg. Cont. Run.: 7 ATF2 Facility Layout Extraction Line (EXT) Extract beam from DR Correct for coupling and dispersion errors Correctly match beam into final focus system. Final Focus System (FFS) Scale test of ILC FFS optics

10 th ATF2 Proj. Mtg. Cont. Run.: 8

10 th ATF2 Proj. Mtg. Cont. Run.: 9

10 th ATF2 Proj. Mtg. Cont. Run.: 10

10 th ATF2 Proj. Mtg. Cont. Run.: 11 ATF2 Operations & First Continuous Run Initial commissioning started Dec Operations based on “R&D” mode –~50% of shifts allocated to ATF2 commissioning tasks –2-3 weeks operations per month Jan-Jun Oct-Dec –Concentrate on isolated hardware and software commissioning items (e.g. cavity BPM system) –Test of individual tuning tasks (e.g. correction of EXT dispersion, coupling). First “continuous operations” run in May 2010 –May 17-21, one dedicated week just for ATF2 tuning –First merging of full EXT and FFS tuning procedures

10 th ATF2 Proj. Mtg. Cont. Run.: 12 For May run we used 10 x nominal IP beta functions –Min y-size for 12pm emittance is ~110nm.

10 th ATF2 Proj. Mtg. Cont. Run.: 13 Example of Tuning Tools Dispersion Correction Beam scans Orbit Feedback BB A

10 th ATF2 Proj. Mtg. Cont. Run.: 14 1 st ATF2 continuous tuning run May 17-21, 2010

10 th ATF2 Proj. Mtg. Cont. Run.: 15 Tuning Procedure (week May 17 – 21) DR tuning –COD, dispersion, coupling, E match … EXT + FFS steering, setup –Cav. BPM cal, BBA, steering, background reduction EXT tuning –Dispersion, coupling correction. –Matching into FFS FFS tuning –Check match conditions at IP –“Coarse” IP matching (beta, alpha, dispersion) e.g. “Irwin Knobs”, MAD/SAD rematching –Fine tuning of IP aberrations with “multiknobs” and IPBSM “Shintake Monitor”. Waist, dispersion, coupling, sensitive second-order terms. Sextupole mover-based multiknobs, FD roll scans, EXT skew-quad scans…

10 th ATF2 Proj. Mtg. Cont. Run.: 16

10 th ATF2 Proj. Mtg. Cont. Run.: 17 Extracted Emittance (DR emit_y = 10pm)

10 th ATF2 Proj. Mtg. Cont. Run.: 18 EXT Dispersion Correction Dispersion propogation to IP corrected <1mm x/y Residual vertical dispersion fine-tuned with FFS Sextupole multiknobs

10 th ATF2 Proj. Mtg. Cont. Run.: 19 EXT Dispersion Correction

10 th ATF2 Proj. Mtg. Cont. Run.: 20 IP Tuning with FFS Sextupole Multiknobs Iterative use of various knobs to bring down IP spot size by scanning with IPBSM.

10 th ATF2 Proj. Mtg. Cont. Run.: 21 IP Tuning Results During Continuous Operations Week Tuning from initial setup of 850nm down to 300nm during 2 consecutive shifts onThursday. Beam size cross-checked on IPBSM 8-degree & 30-degree mode. Trouble reducing beam size past 300nm in 30-degree mode as do not have the resolution to scan higher beam sizes.   k      k startup Laser tuning

10 th ATF2 Proj. Mtg. Cont. Run.: 22 Best result of continuous tune week: May 17-21, 2010 Yoshio Kamiya and Shintake monitor group. Modulation Depth = 8.0 deg. mode Beam Size is (stat.) (syst.) nm

10 th ATF2 Proj. Mtg. Cont. Run.: 23 [atf2-commissioning 380] ATF2 continuous operations week… We completed our first 1 week "continuous operations run" of ATF2 tuning, May 17 - May 21. During the run we reached a minimum IP vertical spot size of about 300nm. The run was a successful integration of tuning tasks tested in past shifts and has provided a lot of information on how to move forward from here. Below is a brief bullet-point summary of events during the week, more detail can be found on the wiki ( DR tuning (ey ~10pm) 10* IP beta_x/beta_y optics loaded for EXT+FFS (4cm/1mm) Magnets standardised EXT dispersion correction EXT ey measured at ~11pm, no coupling correction required Cavity BPM systems calibrated …

10 th ATF2 Proj. Mtg. Cont. Run.: 24 [atf2-commissioning 380] …ATF2 continuous operations week … Beam size brought to ~normal in x <2um in y at IP with W and C wirescanners (some wirescanners cut during scanning) –x and y waists brought to IP with alpha knobs –y beta function looks correct to within ~20% from PIP measurements with waist at IP vertical beam size acquired with IPBSM, starting size ~850nm Beam size reduced to 300nm with sextupole waist, coupling, dispersion multiknobs, qd0 current and roll scans. Beam size verified in 30-degree and 8-degree IPBSM modes. Could not scan with 30-degree mode as could not resolve larger size beam Attempted IP beta reduction to 0.5mm, but could not re-acquire beam Switch back to 8-degree mode, restore optics and tune back to ~350nm (reproducibility!) Glen White (SLAC), on behalf ATF2 commissioning team.

10 th ATF2 Proj. Mtg. Cont. Run.: 25 Beta-squeeze Attempted to squeeze beta from 1mm to 0.5mm to ease transition from 8deg to 30deg mode Positive: –Background did not noticeably increase To be taken into account in future: –The matching quads involved in  -squeeze (“Irwin knob”) were not BBA- ed. Large orbit, need to re-steer, in meantime beam size also drifted up. Could not observe beam in BSM in 30deg mode after the squeeze… – The  -squeeze will likely be required (to jump from 30 to 174deg). May attempt two-step squeeze (after proper BBA of the beamline): Within single BSM mode: Start with , tune beam size down, at 2/3-way-down increase to 2 , continue tuning down to the edge of BSM mode, then squeeze again to  and switch the BSM mode

10 th ATF2 Proj. Mtg. Cont. Run.: 26 Identified issues, ideas & prospects Need to ease “jumping” from 8deg to 30deg mode –Can we enlarge angle for 8ded mode to ~10deg? –Use beta-squeeze to jump between modes, but ensure in advance that beta- squeeze works within single BSM mode (BBA for quads done, etc) –Need to reduce drift (increase) of beam size (both e-beamline & laser lines issue) Final doublet mounting & alignment precision (rotation) Additional possibilities for tuning (not yet tried) –Minimize sigma_x from time to time –Measure & check chromaticity (& verify values of sextupoles) –Analysis and correction of critical R matrix elements Apparently need a more handy online tool –to quickly verify how various knobs, suggested to be tried, are expected to act –This may become a more comprehensive online model with guesstimated errors, which would be gradually reduced, based on measurements and analysis

10 th ATF2 Proj. Mtg. Cont. Run.: 27 Summary First dedicated attempt at tuning ATF2 beamline in the week of May was proven to be very useful 300nm vertical beam size at IP waist achieved –Factor of ~4 from the intermediate “ILC scaled” milestone of ~80nm The 300nm size measured by 8deg mode and reproduced by measurement with 30deg BSM mode –Increasing the overlap between 8deg & 30deg modes and/or better prepared  -squeeze would simplify tuning in the future Improvements discussed & some being implemented Need to plan and prepare for the next “continuous operation runs” for the Autumn-Winter of 2010