VRT Study Update José Conto ERCOT System Planning.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Sistan & Balouchestan Electric Power Distribution Company
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Power Grid Reinforcement Fall Presentation Team 9b: – Jon Brown – Kyle Reininger – Alan Myers – Karl Homburg – Dan Sinnott.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Strength Discussion
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Review of BPA Voltage Control Conference
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Current Contribution from Wind Plant for a System Fault Working Group C17 May 2010 Meeting.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Houston Area Dynamic Reactive Project March 11,
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Project WECC-0100 Update Reliability Subcommittee February 2014.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1. Introduction 2. E-On Guidelines 3. Modelling 4. Controller Design 5. Simulation Results 6. Conclusion Voltage Regulator for Reactive Power Control on.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
Voltage grid support of DFIG wind turbines during grid faults
2009 West-North Stability Limit Study Reliability Assessment Group ERCOT System Planning Phase II –Effects of Adding PSS on System Limits Regional Planning.
PRR835 – Reactive Power Capability Requirement
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
West to North CSC Location Scenario 3b WMS August 20, 2008.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
East Texas Export Limit ERCOT Operations Planning ERCOT Market Presentation
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
© Copyright 2013, First Solar, Inc. Establishing Accurate Power Generation Cost Assumptions for ERCOT Planning Colin Meehan – Director, Regulatory and.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity System Strength/Short Circuit Current Minimum Requirement June 5,
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
RTWG Report to TAC January 6, 2010 Henry Durrwachter.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
User Experience with New Solar PV Models California ISO
Excelsior Energy’s Mesaba Energy Project
Presentation transcript:

VRT Study Update José Conto ERCOT System Planning

2 Dynamic Studies System Planning May 2010 Voltage Ride-Through Boundaries For WTG Ref.: ERCOT Op. Guides, Section

3 Dynamic Studies System Planning May 2010 Type IType IIType IIIType IV NEG Micon NM MW Vestas V kW GE 1.5 MW Kennetech 33-MVS 400kW Mitsubishi MWT1000A 1 MW Vestas V MW Vestas V /3 MW Siemens 2.3 MW Bonus 1.3 MW Vestas V MW Gamesa G80, G83 & G MW Clipper C MW Vestas V MW Suzlon S MW Mitsubishi MWT-92/ MW Vestas NM MW Nordex N MW 1404 MW 16.5 % 463 MW 5.5 % 5042 MW 59.3 % 1598 MW 18.7 % Wind Turbine Generator Types * 2009 Fall case

4 Dynamic Studies System Planning May 2010 The VRT Study Identify system reliability risks associated with existing wind plants that do not have full VRT capabilities. –Phase I Dynamic simulations utilizing existing ERCOT model data set (PSS ® E ver. 30) –Phase II Verify wind plant modeling and develop model improvements as necessary Collect modeling data directly from wind plant owners –Phase III Dynamic simulations utilizing updated models based on model verification (PSS ® E ver. 31)

5 Dynamic Studies System Planning May 2010 Phase II Wind plant modeling outcome – –Collection of actual field data needed for plant modeling of all the wind plants in ERCOT –Methodology to develop a collector system equivalent and wind turbine aggregation Steady State test Active and Reactive Power Loss of wind plant Active and Reactive Power Exchange at POI Short-Circuit test Short-Circuit Current Levels at POI for 3-Phase Faults Dynamic Response test Electrical Power Output Response Terminal Voltage Response System Frequency and Voltage Response

6 Dynamic Studies System Planning May 2010 Phase III Dynamic simulations utilizing updated models. HWHL and HWLL cases rerun.  Scenarios: 1.HWLL case w/no conventional generation in West Texas 2.HWHL case w/dynamic motor load modeled in West Texas 3.HWLL case w/no conventional generation and w/dynamic motor load modeled in West Texas 4.Investigation of the impact of wind generator terminal and/or POI voltage set point on VRT response 5.Investigation of problematic contingencies to develop potential solutions that ensure an operational margin 6.Application of the updated wind models to an ERCOT 2010 base case

7 Dynamic Studies System Planning May 2010 Simulations for HWHL and HWLL cases completed. Simulations for scenarios 1,2 and 3 completed. Results are being finalized. Scenarios 4 and 5 are under investigation. Scenario 6 has not started. Final Report outline has been developed and certain sections are currently under documentation. Presentation scheduled for June ROS meeting. Phase III Status

8 Dynamic Studies System Planning May 2010 Currently, no small signal stability limit on West to North when no conventional generation is on-line in the West; thermal limits only Based on study with updated models, voltage stability limit has potential to bind before thermal limits with no conventional generation on-line The critical contingencies: double circuit with and without fault and line-to-ground fault with breaker failure. Reduction in output at any of the units west of the West-to-North interface eliminate the non-convergence problem. ERCOT Operations will implement this new conditional stability limit ASAP. No Conventional Generation in West Texas – Stability Limit?

9 Dynamic Studies System Planning May 2010 Far West interface composed of three 345 kV lines west of Morgan Creek substation. West-North interface flow kept at ~1976 MW. A stability limit is reached when the Far West interface flow is about 1300 MW (~ 1150 MW Far West wind output.) Thermal overload binding before reaching the stability limit. ERCOT PI data for the period 7/1/2009 to 5/1/2010 indicates that the highest flow on the interface into Morgan Creek was 1140 MW and that the W-N stability limit was constraining most of the time when high transfer into Morgan Creek was observed. A stability limit will not be implemented for the Far West. Far West Texas – Stability Limit?

10 Dynamic Studies System Planning May 2010 José Conto Supervisor, Dynamic Studies System Planning Electric Reliability of Texas, Inc