SLAC FEL R&D Test Facilities Test Facility Task Force R. Hettel May 4, 2011.

Slides:



Advertisements
Similar presentations
Slide 1 Light Source Research at Jefferson Lab George R. Neil and Gwyn P. Williams Associate Director, Jefferson Laboratory JSA Science Council January.
Advertisements

SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
James B. Murphy, Director BES Scientific User Facilities Division
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
UCLA 10/1/2010C. Pellegrini, Towards a 5th generation light source 1 What is a 5th Generation light source? C. Pellegrini UCLA Department of Physics and.
11/05/09 Slide 1 Workshop Summary: Accelerator Physics for Future Light Sources William A. Barletta Director, United States Particle Accelerator School.
Hard X-ray FELs (Overview) Zhirong Huang March 6, 2012 FLS2012 Workshop, Jefferson Lab.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
1 Enhancements to the Linac Coherent Light Source.
1 Daniel Ratner 1 Gain Length and Taper August, 2009 FEL Gain length and Taper Measurements at LCLS D. Ratner A. Brachmann, F.J.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
UCLA The X-ray Free-electron Laser: Exploring Matter at the angstrom- femtosecond Space and Time Scales C. Pellegrini UCLA/SLAC 2C. Pellegrini, August.
AARD June 17, 2011 This talk is: V:\ARDB\business\AARD_ pptx.
AS Diagnostic Collaboration Mark Boland
AAC May 6-8th, 2008 Accelerator Science at the A0 photoinjector and beyond P. Piot, APC/FNAL May 7 th, 2008.
Beam Dynamics Meeting Bolko Beutner, DESY Report from “Characterization of High Brightness Beams” Workshop in Zeuthen Bolko Beutner, DESY Beam.
I.V. Bazarov, Multivariate Optimization of High Brightness DC Gun Photoinjector, UCLA Workshop, 8-10 November CHESS / LEPP ERL DC Gun Injector.
Dielectric Wakefield Accelerator for an X-ray FEL User Facility
Low Emittance RF Gun Developments for PAL-XFEL
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ARD All-Hands Tor Raubenheimer November 22 nd, 2010.
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
SLAC ARD Test Facilities Tor Raubenheimer December 8 th, 2010.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
R&D opportunities for photoinjectors Renkai Li 10/12/2015 FACET-II Science Opportunities Workshops October, 2015 SLAC National Accelerator Laboratory.
FEL R&D Zhirong Huang May4, 2011 Pre-SPC Meeting for Accelerator R&D.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
LCLS-II Design and FEL R&D
Erik Adli CLIC Project Meeting, CERN, CH 1 Erik Adli Department of Physics, University of Oslo, Norway Input from: Steffen Doebert, Wilfried Farabolini,
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
UCLA Claudio Pellegrini UCLA Department of Physics and Astronomy X-ray Free-electron Lasers Ultra-fast Dynamic Imaging of Matter II Ischia, Italy, 4/30-5/3/
LCLS-II: Accelerator Systems LCLS SAC Meeting P. Emma et al. April 23, 2010.
Twin bunches at FACET-II Zhen Zhang, Zhirong Huang, Ago Marinelli … FACET-II accelerator physics workshop Oct. 12, 2015.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
NLCTA Facility Capabilities E. R. Colby 5/18/09. NLCTA Overview RF PhotoInjector Ti:Sapphire Laser System Next Linear Collider Test Accelerator Cl. 10,000.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Status and Interest of the X-ray FEL SINAP
Design of an ECHO-seeded FEL at nm wavelength
Tunable Electron Bunch Train Generation at Tsinghua University
SLAC ARD Test Facilities
Requests of Future HEP e+/e-Facilities
WBS 5.0 LCLS Strategic Projects Division
Z. Huang LCLS Lehman Review May 14, 2009
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
Design of an ECHO-seeded FEL at nm wavelength
EIC Collaborations EIC Collaboration Workshop, JLAB Oct 28-Nov 1st
A very brief introduction to beam manipulation
Project Management Issues John N. Galayda, SLAC April 24, 2002
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Presentation transcript:

SLAC FEL R&D Test Facilities Test Facility Task Force R. Hettel May 4, 2011

X-ray FEL Parameters – Now and Future (C. Pellegrini et al., summary of FEL workshops.) † photons/s/mm 2 /mrad 2 /0.1% BW red = parameter space to be developed SLAC FEL R&D Test Facilities May 4, 2011

The Need for FEL Test Facilities Many facility-years of R&D required to expand and exploit the potential parameter space and performance capabilities of future X-ray FELs (and perhaps reduce their cost) Some R&D can be conducted at operational facilities like the LCLS, but availability highly limited and there is risk that R&D-related modifications may be a risk for user operations Accelerator test facilities, possibly more than one, are required to conduct the FEL R&D program. Facilities operating in parallel at different energies desirable, e.g.: low energy (order 5 MeV) for high brightness electron sources mid-energy (order 100 MeV) ) for R&D on microbunching, CSR, injector optimization, etc. high energy (order GeV) for R&D on nm-seeding, high-E manipulation, etc. Nationwide R&D and test facility collaboration strategy preferred SLAC FEL R&D Test Facilities May 4, 2011

Identify and prioritize candidate programs for FEL accelerator R&D at SLAC that 1) are relevant to SLAC, and 2) relevant to national and international FEL programs (e.g. NGLS) Identify FEL test facilities at SLAC (existing and future) that can accommodate candidate R&D programs; estimate related implementation and operational costs and schedule for each Determine what other labs could host various R&D programs besides SLAC Recommend SLAC FEL test facility and R&D program options, including schedule of availability and implementation for each, as a function of assumed funding (e.g. 5 M$, 10 M$, 20 M$, 40 M$, etc.) FEL R&D Test Facility Task Force - Charge SLAC FEL R&D Test Facilities May 4, 2011 Future goal: develop collaborations and establish nation-wide accelerator test facility strategy

Task force members: C. AdolphsenA. BrachmannE. ColbyP. Emma J. FrischA. Fry Z. HuangJ. Galayda R. HettelC. PellegriniT. Raubenheimer J. Schmerge J. SeemanS. TantawiJ. WelchU. Wienands B. White Task force milestones: Dec 2010: Facility overview, charter clarification, working group assignments, schedule Jan-Mar 2011:Working group reports; task and schedule iteration Mid-April:Draft recommendations for internal review End April:Final report FEL R&D Test Facility Task Force – Members and Schedule SLAC FEL R&D Test Facilities May 4, 2011

Test Facility Scenario Definition Process FEL R&D list was prioritized, time of need and stakeholders identified R&D tasks were mapped onto all facilities at SLAC and rough costs of modifying each facility to host the experiment Optimal facilities were selected based on –cost of implementation –synergy between new and existing programs (both HEP and BES) –value as a long-term investment in SLAC infrastructure Four funding scenarios were defined ranging from modest growth above current funding to a profile that matched the full FEL R&D program. –Types of funding (LDRD, BES R&D, WFO, etc.) were also prescribed and R&D tasks assigned by priority to the FEL program and appropriateness to the type of funding Illustrative year-by-year funding profiles were developed to understand the R&D synergies and interferences SLAC FEL R&D Test Facilities May 4, 2011

SLAC FEL R&D Program, including NGLS (Z. Huang, J. Hastings et al.) SLAC FEL R&D Test Facilities May 4, 2011

SLAC Test Facilities Cathode Research Laboratory (CRL) photocathode development Gun/RF Test Facility (G/RFTF, presently ASTA) high brightness electron source R&D diagnostics R&D Next Linear Collider Test Accelerator (NLCTA) and ESB low-E beam manipulation, compression and seeding (e.g. Echo-15) electron source R&D FEL technology test and measurement

SLAC FEL R&D Test Facilities May 4, 2011 Sector 10 Injector (LCLS-II injector, installed early) new LCLS operating regimes LCLS injector parameter optimization code benchmarking velocity bunching test LCLS-I and –II self-seeding (hard and soft) ultrafast techniques multiple bunches polarization control THz/X-rays SLAC Test Facilities – cont. LCLS-II S10 Injector (early installation) soft x-ray hard x-ray LCLS-I

SLAC FEL R&D Test Facilities May 4, 2011 Facility for Advanced Accelerator Experiment Tests (FACET, user facility) plasma wakefield acceleration is primary goal THz source development beam diagnostics development S0 Injector Test Facility - FUTURE high energy laser seeding and beam manipulation (e.g. Echo-100, ESASE) high energy bunch compression advanced undulator testing possible future FACET-II SLAC Test Facilities – cont.

Sector 0 Injector Test Facility – Multi-GeV FEL R&D (J. Frisch et al.) 135 MeV: Gun brightness optimization at 1pc – 3nC Test other frequency RF guns (with new RF sources: X-band high gradient, low frequency (NGLS), possibly DC gun) Multi-bunch tests. Low charge diagnostics Emittance exchange (with added equipment) 250 MeV: Compression Studies Velocity bunching Nonlinear optics Micro-bunching and COTR CSR studies Laser Heater studies Other Applications Compact /efficient THz source Electron Diffraction source 2-10 GeV: High-E bunch compression tests Slotted spoiler tests Diagnostics Multi-bunch fast kickers Short (~1GL) undulator tests Seeding (NGLS) and ESASE Future LCLS-III injector SLAC FEL R&D Test Facilities May 4, 2011

Test Facilities at SLAC and Elsewhere Low energy, <25 MeV high brightness beam facilities: LBNL – APEXSLAC – ASTA*SPRING - 8 Gun Test LabUCLA – Pegasus Medium energy, 25 MeV to 500 MeV beam facilities: BNL-ATF BNL-SDL DESY Zeuthen -PITZ INFN – SPARC LLNL / SLAC – Megaray PSI-FEL-Injector Shanghai-SDUVSLAC-NCLTA SPring-8 - SCSS TA SLAC-Sector 10 Injector High energy, > 500-MeV facilities: FNAL – NML KEK-ATF2MIT Bates LINACSLAC-ESTB SLAC –FACETSLAC Sector 0 ITF High energy, >1 GeV FEL user machines (limited access time): DESY – FLASH SLAC - LCLS-I and -IITrieste - FERMISPring-8 FEL Other facilities, not well-suited for FEL R&D: ANL AWA CERN-CTF-III Cornell - CESR_TADaresbury-ALICE Daresbury-EMMA Duke- Storage Ring FNAL - A0 / NICADD LBNL-BELLA LLNL Pleiades SLAC - ESB TJNAF - JLab FELTJNAF – CEBAF UCLA-Neptune SLAC FEL R&D Test Facilities May 4, 2011

scenari o facilitiesprogramscostcollab 1 CRL, G/RFTF, NLCTA, LCLS, laser lab gun/cathode development, ultrafast diagnostics, multibunch, THz, low-E bunch manip, self-seeding on LCLS With LBNL/NGLS funds : low-E seeding (NLCTA) seeding laser development NGLS diagnostics, timing/sync 4.5 M$/yr (LCLS Ops, BES R&D) +~3M$/yr from NGLS (LBNL BES R&D/LDRD) NGLS 2 same as 1 + early LCLS-II injector same as mos LCLS-II injector R&D + optimization funds for polarization/taper undulators on LCLS ~10 M$/yr ( includes 3 M$ via NGLS) NGLS other? 3 same as 2 + S0 ITF same as 2 Echo-100 demo high-E bunch compression advanced undulator testing ESASE ~15 M$/yr + 40 M$ over 4 years for ITF/Echo-100 construction (32 M$ ITF construction + 3M$/yr via NGLS) NGLS national FEL FACET 4 same as 3 + full R&D program same as 3 bunch compressors for Echo-100 full FEL R&D program ~21 M$/yr + 40 M$ over 4 years for full ITF construction (~36 M$ ITF construction +3M$/yr via NGLS) NGLS national FEL FACET Funding-Dependent Test Facility Scenarios SLAC FEL R&D Test Facilities May 4, 2011 no nm laser seeding or high-E bunch compression hi-E laser seeding and compression

SLAC FEL R&D Test Facilities May 4, 2011

Funding-Dependent Test Facility Scenarios – cont. preliminary cost estimates are very approximate

Future science applications, including those for LCLS and NGLS X-ray FELs, will require accelerators having cutting edge performance Investment in test facilities for accelerator R&D will be critical to the success of future FEL facilities in exploiting FEL performance potential Accelerator R&D can help reduce facility construction costs Test facilities are invaluable for attracting high quality accelerator scientists and students and for stimulating innovation in general Important to have test facilities with different energy scales Test facilities are expensive; even small facilities are expensive to operate and maintain Collaboration on FEL R&D with other laboratories (LBNL/NGLS, etc.) will benefit all – NEXT STEP Model for accelerator test facility support is changing but support is critical for future R&D (HEP, BES, etc.) – need a national plan – NEXT STEP FEL R&D Test Facilities at SLAC: Summary SLAC FEL R&D Test Facilities May 4, 2011