INTRA-DAY TRADING Modification Development 5 April 2011.

Slides:



Advertisements
Similar presentations
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Advertisements

Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
Mod 26_12 Notification Time for updating Interconnector Technical Data.
Market Systems Release Update Modifications Committee Meeting 48 April 11 th
Intra-Day Trading Project Market Participant Technical Overview 3 rd August 2011, am – 13:00 pm Conference call number: , pin:
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 29 May 2012.
Modification MOD_24_12 Amendments to the MIUN Calculator to address instances of Excessive Area.
Modifications Committee Mod_18_10: Intra-Day Trading 25 November 2010.
Market Systems Release Update Modifications Committee Meeting 49 June 13 th
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Mod_18_10 Intra Day Trading Conference Call Commercial Offer Data for Interconnector Units in Ending Overlap Optimisation Period (EOOP) for WD1 MSP Software.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Evaluation of Proposals for New Rules for Energy Storage Gaelectric Energy Storage T&SC Modification Working Group 23 rd October 2012.
Unit Registration Process Improvement SEMO 05/12/2012.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
1 Market Operator User Group Meeting 1 Market Operator User Group Meeting 13 th of March 2012 The Oval, Dublin Conference Call Number:
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 July 2012.
1 Mod_18_10 : Intra Day Trading in the SEM Working Group 4 August 19 th 2010 SEMO High-Level Impact Assessment.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Requirement Development Feb 11Mar 11Apr 11May 11Jun 11Jul 11Aug11Sep 11Oct 11Nov 11Dec 11 [30/04/11] URS Sign-Off [29/07/11] Design Sign-Off 2011 [27/04/12]
Mod_02_13 Registration of Charges WG Update 03 April 2014.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Mod_02_13 Registration of Charges Legal Spending Update.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 27 March 2012.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
France, UK, Ireland Regional Initiative SONI Commercial Manager
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Mod_06_12 Improved Efficiencies in LCF Process 31 January 2012
Introduction of Code Contingency Guidelines Document
* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##
Outcome TFCS-11// February Washington DC
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
Capacity Market Code Committee Meeting
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Agreed Procedure Updates
Correction of Minor Material Drafting Errors
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Review of the requirements regarding Unsecured Bad Debt within I-SEM
Update to Unit Under Test Process
Redefinition of Schedule Production Cost
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Notification of Suspension to SEM NEMOs
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Interim Suspension Delay Periods
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
MOD_13_17 V2 Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities 13th March 2018.
Capacity Market Code Committee Meeting
Introduction of Code Contingency Guidelines Document
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
Correction to No Load Cost - “and” vs “or”
Interconnector trading in SEM 7th June 2007
Presentation transcript:

INTRA-DAY TRADING Modification Development 5 April 2011

The introduction of intra-day trading in the SEM represents major changes in the market design – detailed in the High Level Design. As a result, there will be major changes to the Trading and Settlement Code (“Code”), including: Bidding to multiple Gate Windows (EA1, EA2 and WD1) for the relevant Trading Day. Restriction of Interconnector Unit bidding in the EA1 Gate Window to Capacity Holders. Reallocation of unused Interconnector Capacity to any Interconnector Unit (with no requirement to be a Capacity Holder) in EA2 and WD1 MSP Software Runs. Different lengths of Trading Window for each Ex-Ante MSP Software Run: EA1: entire Trading Day EA2: entire Trading Day WD1: second portion of the Trading Day Fixing of Interconnector Unit capacity allocations from EA1 MSP Software Run (MIUNs) in the EA2 and WD1 MSP Software Runs. Limiting Interconnector Unit Nominations in EA2 and WD1 Changes to Credit Cover arrangements in respect of Interconnector Units. Introduction

As per Modifications Committee and the RA decisions, SEMO is developing the legal text of the Intra-Day Trading Modification. This Modification will be considered in “Functional Groups” via a series of Working Groups, before being presented as a single (large) Modification to the Modifications Committee in late 2011 Intra-Day Trading Modification

Since approval of the High Level Design, SEMO has been progressing Detailed Design with its vendors, which is being finalised. The Terms of Reference of the Working Group is to produce a Modification which aligns with the RA-approved High Level Design by: Reviewing SEMO’s draft rule changes, ensuring that the resulting Modification Proposal aligns with the agreed High Level Design. Identifying and addressing areas of change to the Code not identified by the drafting Discuss and address drafting issues raised by SEMO. Recommend to the Modifications Committee whether drafting aligns with the High Level Design. Review the content of the Plain English Documents (PED) and provide comments to SEMO. Report to each Modifications Committee meeting on the progress of the development of the Modification Proposal drafting. Confirm to the Modifications Committee once the Modification Proposal is fully drafted, the alignment with the High level Design. Design Status Context for the Working Group

Functional Grouping Functional Group Name Contents 1) Registration and Submission  Registration of Interconnector Units  Participation Notices / Participation Fees  Definition of Gate Windows and Trading Windows  Commercial Offer Data submission  Technical Offer Data Submission 2) Data Transactions and MSP Software  TSO/IA Data Transactions  Publication and Reporting (not credit)  MSP Software operation and calculation 3) Settlement and Credit Management  Credit publication and reporting  Calculation of Required Credit Cover  Calculation of Available Credit Cover  Available Credit Cover sufficiency checks  Calculation of Modified PQ Pairs for Interconnector Units  Interconnector Unit settlement calculations Single Modification presented to Modifications Committee

Meeting Timelines WG #1: 10 May (Belfast) Functional Group 1: Registration and Submission WG #2: 29 June (Dublin) Functional Group 3: Credit and Settlement WG #4: 10 Nov (Dublin) ALL Functional Groups WG #3: 06 Sep (Belfast) Functional Group 2: Transactions & MSP Software SEMO will provide the content for the Working Groups, as per the defined Functional Groups. SEMO intends to provide the following, two weeks prior to the relevant Working Group meeting: Plain English Document (PED) for the relevant Functional Group(s). Legal Drafting (Code, APs, Appendices) for IDT and changes identified by SEMO to address errors, typos etc identified during its review of the Code. This will be changed marked against v8.0 of the Code and will not be put into the standard Modification Proposal form (to save time).

Maintaining alignment with the High Level Design In developing the legal drafting and to support the deliver of the objectives of the Working Group, SEMO is maintaining a mapping of: Provisions of the High Level Design (as approved) Individual Requirements from its vendor User Requirements Specifications (URS) Code clauses/AP sections High Level Design SEMO Mapping T&SC Legal Drafting User Requirements (Detailed Design)