6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.
FourStar Image Motion Stephen Smee (410)
Visit to KP 0.9m, Nov 13, Wed Van leavingTOCC at 4 PM. Bring a warm jacket! We will eat dinner in astronomer’s cafeteria when you arrive, then go directly.
DESpec spectrographs Jennifer Marshall Darren DePoy Texas A&M University.
DESpec spectrographs Jennifer Marshall Darren DePoy Texas A&M University.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
21/22 September 2002IMACS update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 21/22 September 2002 Boston, MA.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
Figure 1, MODS exploded Figure 2, Blue Camera Design Figure 3, Blue Camera Structure Figure 4, MODS CCD Dewar Figure 5, MODS I 4k x 4k CCD Figure 6, QE.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
Oct 22, 2007SSWG #18 UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair Schedule Status of other fix and improvement projects Budget.
CHARA Collaboration Year-Five Science Review News from the CHARA-Array Beam Combination Lab Judit Sturmann.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
M agellan I namori K yocera E chelle Rebecca BernsteinU. Michigan Steve ShectmanCarnegie Observatories Steve GunnelsParagon Engineering Stefan MochnackiU.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
TSIP (Telescope System Instrumentation Program) proposal February, 2005 Carnegie submission, on behalf of Magellan Consortium: “A Second, More Sensitive.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Optical Aeronomy Calibration Facility CEDAR WORKSHOP JUNE, 2007 Jeff Baumgardner, Center for Space Physics Boston University.
Status Review Dec. 1, 2003 Mark Hunten MONSOON Project Manager NOAO MI Program.
Telescope Integration and Tests Tuesday Afternoon.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
Oct 30, 2003PFIS - Student Wkshop1 The Prime Focus Imaging Spectrograph – Old Challenges and New Ones K. Nordsieck, Principal Investigator Jeff Percival,
Opto-Mechanics for SNAP at UM
The Prime Focus Imaging Spectrograph Design and Capabilities
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
FourStar Status Eric Persson (OCIW) Presented By.
Magellan Planet Finder Spectrograph Jeff Crane (OCIW) Steve Shectman (OCIW) Paul Butler (DTM)
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Experiments and Design of a wavelength calibration procedure for MOSFIRE Principal Investigator: David Guerrero, Cal Poly SLO Research Advisor: Ian McLean,
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
May 19, 2008SSWG #19 Göttingen1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair positive progress: –UV efficiency –Some (repair-caused)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Prime Focus Imaging Spectrograph Status
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Prime Focus Imaging Spectrograph Status
DES Blanco602 Opto-Mechanics
Magellan Telescopes Observatory Report
COSMOS Status David Sprayberry, Sean Points & Jay Elias
The Commissioning of Northern Arizona University’s Barry Lutz Telescope Student Arron Shiffer Mentor S.C. Tegler.
FourStar 4K x 4K JHK imager
Presentation transcript:

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October 2001 U. Arizona, Tucson, AZ

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 2 Current project team: A. DresslerPrincipal Investigator B. BigelowInstrument Scientist Optical Engineering B. Sutin, H. Epps Mechanical Engineering: B. Bigelow, T. Hare, S. Gunnels, G. Luppino (Consult.) R. Cleary (drafting) Electrical Engineering J. Asa, D. Carr (Consult) Detector Systems: G. Burley, I. Thompson, J. Estrada Software Engineering: C. Birk, K. Clardy Fabrication: V. Kowal, R. Storts, J. Castillo, P. Ramirez

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 3

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 4 Optics Status: Collimator: C01 (Field lens) Finished, at OCIW C02 - C03Finished, mounted in cells C04 - C05At Spectrum TFL for coating Long Camera: L01 - L06 At Spectrum TFL for coating Short Camera: S01, S08Blanks at REOSC, specifications under revision S02 - S09At TORC for polishing

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 5 Optics Status cont. Filters: Two sets of UBRI filters matching those used by Arlo Landolt have been ordered from Barr. Grisms: Design of the grisms is in progress.

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 6 Current grating selection:

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 7 Mechanical Engineering Status: Guide camera stages (Hare)Assy. IP Mask server (Bigelow)Mods. IP Field Lens (Hare)Done LCAM shutter (Hare)Done Filter servers Done Disperser server (Hare)re-design, draft. IP

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 8 Mechanical Engineering cont. Collimator (Bigelow)Assy. IP Long camera (Bigelow)Ready for Assy. Short camera (Bigelow)Drafting IP Dewar (Luppino)Done Instrument Structure (Gunnels)IP

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 9

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 10

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 11 Center field guide camera assembled and tested

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 12 Principal and SH guide cameras being assembled 10/01

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 13

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 14 Field lens coated, in shipping fixture

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 15 Field lens cell

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 16 Collimator barrel ready for assembly

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 17 C02 during after final potting operation

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 18 C03 during first potting step

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 19

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 20 First grating tilt mechanism assembled

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 21 Long camera

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 22 Front and rear barrel stock. Rings for lens cells. LCAM materials at M&T, 5/01

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 23 LCAM scale control system assembled and operated

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 24 Long camera with shutter, FS, and dewar mounted

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 25

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 26

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 27

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 28

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 29

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 30 Convergent/Prima commercial 150W CO2 laser cutting system $270K (2 sec/slit).

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 31 Directed Light laser cutting system

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 32 Electronic Engineering: Dave Carr is providing electronics design for IMACS on a consulting basis. Status of electronics: (3) Motion control (MC) chassis, 1 Done, 1 IP (1) Power supply chassis, Done (1) Shutter control chassisDone (2) PI chassis (flexure & scale control)Done Schematics design (all motion stages)Done

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 33 Detector systems: Guider cameras: - 4 cameras at LCO, 5 more to be fabricated this year - 3 cameras for IMACS by end of 2001? Science arrays: - All CCDs in house - Dewar and detector system mechanics in house - First OCIW science controller (with 1 CCD) operating

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 34 Detector systems continued: Five science cameras planned for assembly in 2001: - 2K x 4K lab system - Red and Blue 2K x 4K cameras for MIKE - 4K x 4K camera - IMACS 8K x 8K Jorge Estrada now assisting with electronics assembly of the guiders and eventually, the science arrays.