March 2002, JINR Dubna1 A new   e  experiment at PSI For the MUEGAMMA collaboration Stefan Ritt (Paul Scherrer Institute, Switzerland) Introduction.

Slides:



Advertisements
Similar presentations
MEG 1  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
Advertisements

Application of the DRS Chip for Fast Waveform Digitizing Stefan Ritt Paul Scherrer Institute, Switzerland.
20. Feb. 2002, LTP1 Electronics for the  e  experiment Short introduction and status Trigger electronics DAQ electronics Slow Control Developments useful.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Ultrafast 16-channel ADC for NICA-MPD Forward Detectors A.V. Shchipunov Join Institute for Nuclear Research Dubna, Russia
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Design and Performance of the 6 GS/s Waveform Digitizing Chip DRS4 Stefan Ritt Paul Scherrer Institute, Switzerland at 40 mW per channel.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Study of two pion channel from photoproduction on the deuteron Lewis Graham Proposal Phys 745 Class May 6, 2009.
MEG 1  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
Wataru Ootani, ICEPP, Univ. of Tokyo SORMA X, May 21, 2002 Development of liquid xenon scintillation detector for new experiment to search for   e 
July 16/17, 2002 MUEGAMMA review PSI1 Slow Control.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
Fast Waveform Digitizing in Radiation Detection using Switched Capacitor Arrays Stefan Ritt Paul Scherrer Institute, Switzerland.
Lecce - 23 Sep The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti M. Grassi.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
May 9, 2002 TRIUMF Canada1 A new   e  experiment at PSI For the MUEGAMMA collaboration Stefan Ritt (Paul Scherrer Institute, Switzerland) Motivation.
The Trigger Prototype Board Status Marco Grassi INFN - Pisa On behalf of trigger group D. Nicolò F. Morsani S. Galeotti M. Grassi.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
DAQ+trigger operation during 2008 run D. Nicolò University of Pisa & INFN, Pisa.
M. Grassi – INFN Pisa La Thuile - March 15 th, A sensitive search fordecay: the MEG experiment Marco Grassi INFN, Pisa on behalf of the MEG Collaboration.
Tackling the search for Lepton Flavor Violation with GHz waveform digitizing using the DRS chip Stefan Ritt Paul Scherrer Institute, Switzerland.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
Status of the MEG Experiment  → e  On behalf of the MEG collaboration Stefan Ritt Paul Scherrer Institute, Switzerland.
March 6, INST02, Novosibirsk1 Electronics for the  e  experiment at PSI Short introduction Trigger electronics DAQ electronics Slow Control For the.
1 MEG 陽電子タイミングカウンタの ビーム中での性能評価と 解析方法の研究 * 内山雄祐 東大素粒子セ, INFN-Genova A, INFN-Pavia B 森俊則 F. Gatti. A,S.Dussoni A,G.Boca B,P.W.Cattaneo B, 他 MEG Collaboration.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
Ю.Г. Куденко 1 Редкие распады каонов Дубна, 12 мая 2004 Вторые Марковские чтения Дубна-Москва, мая 2004 г. Институт ядерных исследований РАН CKM.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Dec. 8th, 2000NOON A new   e  experiment at PSI For the MUEGAMMA collaboration Stefan Ritt (Paul Scherrer Institute, Switzerland) Introduction.
Lepton Flavor Violation: Goals and Status of the MEG Experiment at PSI Stefan Ritt Paul Scherrer Institute, Switzerland.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Front-End Electronics for G-APDs Stefan Ritt Paul Scherrer Institute, Switzerland.
TYPE1 BOARD Type1 boards are compliant with 6U VME standard. Each board receives 16 analog signals from experimental devices. These signals are digitized.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Liquid Xe detector for m +  e + g search Kenji Ozone ( ICEPP, Univ. of Tokyo, Japan ) Introduction prototype R&D ー PMTs ー small & large type summary Outline.
Particle Physics Experiments at PSI Stefan Ritt Paul Scherrer Institute, Switzerland.
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
First results from SND at VEPP-2000 S. Serednyakov On behalf of SND group VIII International Workshop on e + e - Collisions from Phi to Psi, PHIPSI11,
THE WaveDAQ SYSTEM FOR THE MEG II UPGRADE … read out by MIDAS Stefan Ritt, Paul Scherrer Institute, Switzerland 15 July 2015MIDAS Workshop, TRIUMF Paul.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Stefan Ritt Paul Scherrer Institute, Switzerland
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
The WaveDAQ System for the MEG II Upgrade
Cecilia Voena INFN Roma on behalf of the MEG collaboration
Liquid Xenon Detector for the MEG Experiment
New experiment to search for mge g at PSI status and prospects
Possible Upgrades ToF readout Trigger Forward tracking
Front-end electronic system for large area photomultipliers readout
Upgrade of LXe gamma-ray detector in MEG experiment
Example of DAQ Trigger issues for the SoLID experiment
Upgrade of LXe gamma-ray detector in MEG experiment
CLAS12 Timing Calibration
Stefan Ritt Paul Scherrer Institute, Switzerland
The Trigger System Marco Grassi INFN - Pisa
Trigger operation during 2007 run
Decay Angular Measurement in the MEG Experiment
Presentation transcript:

March 2002, JINR Dubna1 A new   e  experiment at PSI For the MUEGAMMA collaboration Stefan Ritt (Paul Scherrer Institute, Switzerland) Introduction Experimental Technique New Electronics Current status

March 2002, JINR Dubna2 Physics Motivation SUSY theories generically predict LFV LFV forbidden by Standard Model Processes like  +  e +  are not “contaminated” by SM processes and therefore very clean Discovered oscillations are expected to enhance LFV rate The search for  +  e +  is therefore a promising field to find physics beyond the SM SUSY theories generically predict LFV LFV forbidden by Standard Model Processes like  +  e +  are not “contaminated” by SM processes and therefore very clean Discovered oscillations are expected to enhance LFV rate The search for  +  e +  is therefore a promising field to find physics beyond the SM

March 2002, JINR Dubna3 Prediction from SUSY SU(5) This experiment Current experimental bound 2) f t (M)=2.4  >0 M l =50GeV 1) 1)J. Hisano et al., Phys. Lett. B391 (1997) 341 2)MEGA collaboration, hep-ex/

March 2002, JINR Dubna4 Connection with oscillations 1) 1)J. Hisano and D. Nomura, Phys. Rev. D59 (1999) )MEGA collaboration, hep-ex/ ) This experiment

March 2002, JINR Dubna5 Previous  +  e +  Experiments PlaceYearUpper limitAuthor SIN (PSI), Switzerland 1977< 1.0  A. Van der Schaaf et al. TRIUMF, Canada1977< 3.6  P. Depommier et al. LANL, USA1979 < 1.7  W.W. Kinnison et al. LANL, USA1986< 4.9  R.D. Bolton et al. LANL, USA1999< 1.2  MEGA Collab., M.L. Brooks et al. New experiment: at PSI Letter of Intend 1998 Proposal 1999, approved May 1999 New experiment: at PSI Letter of Intend 1998 Proposal 1999, approved May 1999

March 2002, JINR Dubna6 MEG Collaboration InstituteCountryMain Resp.HeadScientistsStudents ICEPP, Univ. of TokyoJapanLXe CalorimeterT. Mori122 Waseda UniversityJapanCryogenicsT. Doke52 INFN, PisaItaly e + counter, trigger, M.C. C. Bemporad43 IPNS, KEK, TsukubaJapan Supercoducting Solenoid A. Maki5- PSISwitzerland Drift Chamber, Beamline, DAQ S. Ritt4- BINP, NovosibirskRussia LXe Tests and Purification B. Khazin4- Nagoya UniversityJapanCryogenicsK. Masuda

March 2002, JINR Dubna7 Experimental Method Stopped  beam of 10 8 s -1, 100% duty factor Liquid Xe calorimeter for  detection Solenoidal magnetic spectrometer with gradient field Radial drift chambers for e + momentum determination Timing counter for e + Stopped  beam of 10 8 s -1, 100% duty factor Liquid Xe calorimeter for  detection Solenoidal magnetic spectrometer with gradient field Radial drift chambers for e + momentum determination Timing counter for e + E e = 52.8 MeV Kinematics  e  = 180° E g = 52.8 MeV e  

March 2002, JINR Dubna8 Signal and Background  +  e +  signal very clear –E  = E e+ = 52.8 MeV –   e+ = 180° –e + and  in time Background –Radiative  + decays –Accidental overlap Detector Requirements –Excellent energy resolution –Excellent timing resolution –Good angular resolution ee e  e   ee  e    e  e 

March 2002, JINR Dubna9   e  Signature  e  E e,E  = 52.8MeV  e  E e,E  < 52.8MeV X = E e /52.8MeV Y = E  /52.8MeV

March 2002, JINR Dubna10 Sensitivity and Background Rate BR(  e  ) = (N  T  /4   e    sel ) -1 = 0.94  NN 1  10 8 T2.2  10 7 s (~50 weeks)  /4  0.09 ee 0.95  0.7  sel 0.8 FWHM EeEe 0.7% EE 1.4%  e  12 mrad tete 150 ps Prompt Background B pr  Accidental BackgroundB acc   E e  t e  (  E  ) 2 (  e  ) 2  5 

March 2002, JINR Dubna11 Paul Scherrer Institute Experimental Hall

March 2002, JINR Dubna12 Experimental Hall

March 2002, JINR Dubna13 Sindrum PSI  - Ti  e - Ti : Oct (50d) beam time: 90% C.L. limit: B ue =

March 2002, JINR Dubna14  E5 Beam Line 10 8  /s on 5  5 mm 2 Neutron background measured in 1998 Two Beam tests in  /s on 5  5 mm 2 Neutron background measured in 1998 Two Beam tests in 2002

March 2002, JINR Dubna15 Detector

March 2002, JINR Dubna16 LXe Calorimeter ~800l liquid Xe (3t) ~800 PMTs immersed in LXe Only scintillation light detected Fast response (45 ns decay time) High light output (70% of NaI(Tl)) 1) High uniformity compared with segmented calorimeters High channel occupancy will be accommodated by special trigger scheme ~800l liquid Xe (3t) ~800 PMTs immersed in LXe Only scintillation light detected Fast response (45 ns decay time) High light output (70% of NaI(Tl)) 1) High uniformity compared with segmented calorimeters High channel occupancy will be accommodated by special trigger scheme 1) T. Doke and K. Masuda, NIM A 420 (1999) 62

March 2002, JINR Dubna17  Response Signal is distributed over many PMTs in most cases Weighted mean of PMTs on the front face   x ~ 4mm FWHM Broadness of distribution   z ~ 16mm FWHM Timing resolution   t ~ 100ps FWHM Energy resolution ~ 1.4% FWHM depends on light attenuation in LXe Signal is distributed over many PMTs in most cases Weighted mean of PMTs on the front face   x ~ 4mm FWHM Broadness of distribution   z ~ 16mm FWHM Timing resolution   t ~ 100ps FWHM Energy resolution ~ 1.4% FWHM depends on light attenuation in LXe x z

March 2002, JINR Dubna18 Calorimeter Prototypes 32 PMTs, 2.3 l LXe Tested with radioactive sources 51 Cr, 137 Cs, 54 Mn, 88 Y Extrapolated resolutions at 52.8 MeV in agreement with quoted numbers “Small”“Large” Measure resolutions with 40 MeV photon beam at ETL, Tsukuba, Japan

March 2002, JINR Dubna19 Large Prototype Currently largest LXe detector in the world (224 PMTs, 150l), Contains all critical parts of final detector

March 2002, JINR Dubna20 Positron Spectrometer Homogeneous Field Gradient Field (COnstant-Bending-RAdius) e + from  +  e +  Ultra-Thin (~3g/cm2) superconducting solenoid with 1.2 T field Ultra-Thin (~3g/cm2) superconducting solenoid with 1.2 T field

March 2002, JINR Dubna21 Drift Chamber 16 radial chambers with 20 wires each Staggered cells measure both position and time He – C 2 H 6 gas to reduce multiple scattering Vernier pattern to determine z coordinate 16 radial chambers with 20 wires each Staggered cells measure both position and time He – C 2 H 6 gas to reduce multiple scattering Vernier pattern to determine z coordinate

March 2002, JINR Dubna22 Prototype Test at PSI 0, 0.6, 0.8, 1T field 3 tilting angles Chamber ok, electronics needs improvement 0, 0.6, 0.8, 1T field 3 tilting angles Chamber ok, electronics needs improvement

March 2002, JINR Dubna23 Positron timing counter Aimed resolution ~100ps FWHM Beam tests at KEK in July 1999 Taken over by Pisa group Tests with cosmic  confirmed 100ps FWHM Aimed resolution ~100ps FWHM Beam tests at KEK in July 1999 Taken over by Pisa group Tests with cosmic  confirmed 100ps FWHM subprojects/tcount/ subprojects/tcount/

March 2002, JINR Dubna24 Trigger Requirements  Beam rate10 8 s -1  Fast LXe energy sum > 45MeV2  10 3 s -1   interaction point  e + hit point in timing counter  time correlation  – e s -1  angular corrlation  – e + 20 s -1  Beam rate10 8 s -1  Fast LXe energy sum > 45MeV2  10 3 s -1   interaction point  e + hit point in timing counter  time correlation  – e s -1  angular corrlation  – e + 20 s -1 E e = 52.8 MeV Kinematics  e  = 180° E g = 52.8 MeV e   M.C. Total ~800 PMTs Common noise contributes significantly to analog sum AC coupling  Baseline drift How to evaluate  of shower center? Total ~800 PMTs Common noise contributes significantly to analog sum AC coupling  Baseline drift How to evaluate  of shower center?

March 2002, JINR Dubna25 Digital Trigger VME Interface (Cypress) 3.3V 2.5V FADC LVDS FPGA SRAM FADC LVDS FPGA SRAM VME Interface (Cypress) 3.3V 2.5V LVDS FPGA SRAM LVDS FPGA SRAM LVDS 8 channels LVDS 8 channels clck, clear 48 bits output LVDS 10bit / 100MHz

March 2002, JINR Dubna26 Baseline Subtraction Latch Baseline Subtraction Latch 10 bit 100 MHz Clock    - + <thr  + - Baseline Register Uses ~120 out of 5000 logic cells  8 channels/FPGA use 20% of chip Uses ~120 out of 5000 logic cells  8 channels/FPGA use 20% of chip Baseline subtracted signal LUT 10x10 Calibrated and linearized signal

March 2002, JINR Dubna27 QT Algorithm original waveform smoothed and differentiated (Difference Of Samples) Threshold in DOS Region for pedestal evaluation integration area t Inspired by H1 Fast Track Trigger (A. Schnöning) Difference of Samples (= 1 st derivation) Hit region defined when DOS is above threshold Integration of original signal in hit region Pedestal evaluated in region before hit Time interpolated using maximum value and two neighbor values in LUT  1ns resolution for 10ns sampling time Inspired by H1 Fast Track Trigger (A. Schnöning) Difference of Samples (= 1 st derivation) Hit region defined when DOS is above threshold Integration of original signal in hit region Pedestal evaluated in region before hit Time interpolated using maximum value and two neighbor values in LUT  1ns resolution for 10ns sampling time

March 2002, JINR Dubna28 Trigger latency BS    Max T[ns] >45MeV   e+ AND 10 stages = 1024 chn... ADC Inter-board communication: 120 ns Total latency: 350 ns

March 2002, JINR Dubna29 Prototype board ADC Signal- Generator DAC FPGA

March 2002, JINR Dubna30 DAQ Requirements n E[MeV] ee Michel edge t PMT sum e    e    e  51.5 MeV MeV  ’s hitting different parts of LXe can be separated if > 2 PMTs apart (15 cm) Timely separated  ’s need waveform digitizing > 300 MHz If waveform digitizing gives timing <100ps, no TDCs are needed  ’s hitting different parts of LXe can be separated if > 2 PMTs apart (15 cm) Timely separated  ’s need waveform digitizing > 300 MHz If waveform digitizing gives timing <100ps, no TDCs are needed ~100ns

March 2002, JINR Dubna31  Domino Sampling Chip 0.5 – 1.2 GHz sampling speed 128 sampling cells Readout at 5 MHz, 12 bit ~ 100 CHF/channel Needed: 2.5 GHz sampling speed Circular domino wave 1024 sampling cells 40 MHz readout < 100ps accuracy C. Brönnimann et al., NIM A420 (1999) 264

March 2002, JINR Dubna32 Domino Ring Sampler (DRS) Free running domino wave, stopped with trigger Sampling speed 2 GHz (500ps/bin) Readout 40 MHz 12 bit 1024 bins  150ns waveform + 350ns delay Free running domino wave, stopped with trigger Sampling speed 2 GHz (500ps/bin) Readout 40 MHz 12 bit 1024 bins  150ns waveform + 350ns delay input

March 2002, JINR Dubna33 DAQ Board 8 inputs trigger gate FADC 3 state switches FPGA SRAM shift register 9 channels  1024 bins / 40 MHz = 230  s  acceptable dead time Zero suppression in FPGA QT Algorithm in FPGA (store waveform if multi-hit) Costs per channel: ~25$ (board) + 6$ (chip) 9 channels  1024 bins / 40 MHz = 230  s  acceptable dead time Zero suppression in FPGA QT Algorithm in FPGA (store waveform if multi-hit) Costs per channel: ~25$ (board) + 6$ (chip) 40 MHz 12 bit VME Interface (Cypress) 3.3V 2.5V 8 channel DRS Trigger Input Board inter-connect FPGA SRAM FADC 8 channel DRS 8 channel DRS FADC 8 channel DRS Trigger BUS (2 nd level tr.)

March 2002, JINR Dubna34 “Redefinition” of DAQ ConventionalNew AC couplingBaseline subtraction Const. Fract. Discriminator DOS – Zero crossing ADCNumerical Integration TDC Bin interpolation (LUT) Waveform Fitting Scaler (250 MHz)Scaler (50 MHz) OscilloscopeWaveform sampling 400 US$ / channel50 US$ / channel TDC Disc. ADC Scaler Scope FADC FPGA SRAM DSC ~GHz 100 MHz

March 2002, JINR Dubna35 Cryogenics Design

March 2002, JINR Dubna36 New slow control system ADuC812 / C8051F000 Micro controllers with 8x12 bit ADC, 2x12 bit DAC RS485 bus over flat ribbon cable Powered through bus Costs ~30$ Piggy back board ADuC812 / C8051F000 Micro controllers with 8x12 bit ADC, 2x12 bit DAC RS485 bus over flat ribbon cable Powered through bus Costs ~30$ Piggy back board Generic node

March 2002, JINR Dubna37 2 versions Generic node with signal conditioning Sub-master with power supply and PC connection (Parallel Port, USB planned) Integration on sensors, in crates RS232 node planned BUS Oriented Crate Oriented 19” crate with custom backplane Generic node as piggy-back Cards for analog IO / digital IO / °C / 220V crate connects to parallel port (USB)

March 2002, JINR Dubna38 Midas Slow Control Bus 256 nodes, with one level of repeaters Bus length ~500m opto-isolated Boards for voltage, current, thermo couples, TTL IO, 220V output Readout speed: 0.3s for 1000 channels C library, command-line utility, Midas driver, LabView driver Nodes are “self-documenting” Configuration parameters in EEPROM on node Node CPU can operate autonomously for interlock and regulation (PID) tasks (C programmable) Nodes can be reprogrammed over network nodes, with one level of repeaters Bus length ~500m opto-isolated Boards for voltage, current, thermo couples, TTL IO, 220V output Readout speed: 0.3s for 1000 channels C library, command-line utility, Midas driver, LabView driver Nodes are “self-documenting” Configuration parameters in EEPROM on node Node CPU can operate autonomously for interlock and regulation (PID) tasks (C programmable) Nodes can be reprogrammed over network

March 2002, JINR Dubna39 Time Table PlanningR & DAssemblyData Taking now Conclusions Preparations are going well in all areas of the experiment Innovative technologies developed useful for other experiments Next major milestone: Large prototype test in Tsukuba spring 2002 Preparations are going well in all areas of the experiment Innovative technologies developed useful for other experiments Next major milestone: Large prototype test in Tsukuba spring