Hydro Energy the source of clean renewable energy.
To construct a hydroelectric power plant in kiri dam To educate and promote the use micro hydroelectric power plant unit.
No cost for main dam but a saddle will be constructed. 1.25million naira for the construction of an extra spillway. 12.5million naira for the construction of a 10MW unit.
Where there is no low-flowing river available, a water reservoir can be used. 4 PVC pipes 4*750 = #3 000 4 valves and 4 joint heads 8*300 = #2 400 A small turbine #6 500 ES&D stream engine DC Gen # 2 AGM batteries # Other accessories #35 000
Pipes can be lost due to cracking from harsh weather conditions Batteries can be destroyed due to over charging Solutions Pipes can be buried under ground to reduce the effect The use of a charge controller