Wednesday, May 1, 2013 Acceptance Test. IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance.

Slides:



Advertisements
Similar presentations
Requirements Specification Presented By: Code Shark Solutions 11/3/10.
Advertisements

Title 1 Software Linked Interactive Competitive Environment Preliminary Design November 7 th, 2011.
1 Module 9: Submit. Objectives 2 Welcome to the Cayuse424 Submit Training Module. In this module you will learn how to use Cayuse424 to:  Discern the.
1 Module 9: Submit. Objectives 2 Welcome to the Cayuse424 Submit Training Module. In this module you will learn how to use Cayuse424 to:  Discern the.
Preliminary Design: Smart Scheduling Client: Dr. Robert Yoder.
April 29, Simnet View Acceptance Test by InnoSmart Technologies.
Competitive Algorithm Calculation Testing in a Unified System (CACTUS) Software Plan 9/23/ Presented By: ExoNET Solutions.
04/27/2010 Acceptance Test 1. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 04/27/2010 Acceptance.
Acceptance Test: Smart Scheduling Client: Dr. Robert Yoder.
Pear Software e-SATA (The Electronic Spreadsheet Automated Teaching Assistant) Detailed Design.
1 PerformanceSoftware Roger Bacon Science Center, Room 328 February 21 st, 2006 Automated Grading System for Microsoft Excel - Detailed Design -
October 26th, Simnet View Requirements Specification by InnoSmart Technologies.
Title 1 Software Linked Interactive Competitive Environment Software Requirements Specification November 2 nd, 2011.
IOS Requirements Specification Bad Robot Enterprises 1 BAD ROBOT ENTERPRISES INTERNATIONAL ONLINE SURVEY (IOS) REQUIREMENTS SPECIFICATION Roger Bacon Science.
1 Pear Software e-SATA (Electronic Spreadsheet Teaching Assistant) -Software Plan- Roger Bacon Science Center,
Alumni Spotlight Web System Preliminary Design by Initrode Solutions 12/01/2006.
Pear Software e-SATA (The Electronic Spreadsheet Automated Teaching Assistant) Requirements Specification.
Alumni Spotlight Web System Acceptance Test by Initrode Solutions.
Title 1 Software Linked Interactive Competitive Environment Software Plan September 23 rd, 2011.
2/21/2006 SaintSoft: Detailed Design 1 Environmental Monitoring System Detailed Design by Saint Soft.
School of Science Network Device Display System Requirements Specification by Orion Technologies Roger Bacon Hall Room 328 October 24, :15 AM.
Alumni Spotlight Web Systems Requirements Specification by Initrode Solutions 10/25/2006.
School of Science Device Networking System Software Plan by Orion Technologies Roger Bacon Hall Room 328 September 21, :15 AM.
IOS Detailed Design Bad Robot Enterprises 1 BAD ROBOT ENTERPRISES INTERNATIONAL ONLINE SURVEY (IOS) DETAILED DESIGN Roger Bacon Science Center, Room 328.
March 4, 2008Sonata Software - Detailed Design1 Dynamic Network Device Mapping System Preliminary Design Sonata Software Roger Bacon Hall Room 328 March.
Requirements Specification: Smart Scheduling Client: Dr. Robert Yoder.
Friday 9/25/09 1 Proposed Project: Student/Staff Programming Problem and Solution Manager (S 2 P 2 ASM) Software Plan Presentation Client: Dr. Darren Lim.
Pear Software e-SATA (The Electronic Spreadsheet Automated Teaching Assistant) Preliminary Design.
11/4/2009 Requirements Specification. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 11/4/2009.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Requirements Specification 11/2/2011 Presented By: ExoNET Solutions 1.
Alumni Spotlight Web System Detailed Design by Initrode Solutions 03/06/2007.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Preliminary Design 12/7/2011 Presented By: ExoNET Solutions 1.
Detailed Design: Smart Scheduling Client: Dr. Robert Yoder.
Software Plan Presented By: Code Shark Solutions 9/24/10.
ONLINE TECHNICAL REPORT SYSTEM Team Crash Course Ryan Ashe, Eileen Balci, James Kirk, Taylor Paschal.
EMS CE Web Application PA DOH EMS Office. 6/20/03 EMS Office Goals of this presentation Explain the system design Provide an overview of the criticality.
SIENA COLLEGE ACCURATE REGISTRATION DETAILED DESIGN MARCH 6, 2013 SCAR 1 D&C Solutions Detailed Design Siena College Accurate Registration.
Monday, October 29 st 2012 Requirements Specification.
ONLINE TECHNICAL REPORT SYSTEM Team Crash Course Ryan Ashe, Eileen Balci, James Kirk, Taylor Paschal.
1 Software Requirements Specification Presentation Client Dr. Darren Lim Friday October 30, 2009 Java.Online.Learning.Tutor.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Acceptance Test 05/01/ GUEST REGISTRATION ADVANCEMENT SUNNY SOLUTIONS ACCEPTANCE TEST.
Title 1 Software Linked Interactive Competitive Environment Acceptance Test April 26 th, 2012.
CCRS Comprehensive Conference Registration System Detailed Design March 6 th,
CCRS Comprehensive Conference Registration System Acceptance Test May 1 st,
ID-10t Consultants Generation Java Acceptance Test Roger Bacon Science Center, Room 328 April 28th, :00pm 04/28/091 ID-10t Consultants Acceptance.
March 19 nd /19/2014 Detailed Design 2 Client: Dr. Timoth Lederman Guest: Dr. Darren Lim Guest: Dr. Meg Fryling.
Title 1 Software Linked Interactive Competitive Environment Detailed Design March 1 st, 2012.
ID-10t Consultants Generation Java Software Plan Roger Bacon Science Center, Room 328 September 19, :15 am 09/19/20081 ID-10t Consultants Software.
Friday, December 7 th 2012 Preliminary Design. IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUse Case DiagramDeployment DiagramWebsite.
IOS Acceptance Test Bad Robot Enterprises 1 BAD ROBOT ENTERPRISES INTERNATIONAL ONLINE SURVEY (IOS) ACCEPTANCE TEST Roger Bacon Science Center, Room 328.
R.O.S.E.S. Preliminary Design Presented By: Code Shark Solutions 12/8/10.
Detailed Design Presented By: Code Shark Solutions 03/01/11.
CCRS Comprehensive Conference Registration System Preliminary Design December 7 th,
FSH Technologies Acceptance Test: F.I.L.E.T. April 26th, 2012.
Welcome Mr. Brian Smith Mrs. Lisa Veino Ms. Kate Zimmerman College Catalog System.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Acceptance Test 04/25/2012 Presented By: ExoNET Solutions 1.
Hobb-IT Hobby Information Tracker By Illumination Technologies Detailed Design March 19, 2014 Illumination Technologies Hobb-IT 1.
Preliminary Design By Phoenix Tech. Dr. Darren Lim Assistant Professor Department of Computer Science Siena College Mrs. Pauline White Visiting Instructor.
 CCRS Comprehensive Conference Registration System Software Plan September 21 st, 2012 S.E.E. Solutions 1.
Acceptance Test By Phoenix Tech AcceptanceTestAcceptanceTest.
1 Acceptance Test Presentation Client Dr. Darren Lim 4/27/2010.
Facilitators: Dr. Wanda Zagozdzon-Wosik Dr. Dr. Jung-Uk Lim ECE 4336: CAPSTONE DESIGN II.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Requirements Specification 10/29/2012 SUNNY SOLUTIONS REQUIREMENTS SPECIFICATION PRESENTATION.
U.S. Department of Agriculture eGovernment Program May 26, 2004 eGovernment Working Group U.S. Department of Agriculture eGovernment Program.
UST Connect – Learn how to set up your profile and upload a resume. UST Connect is managed by UST Career Services. (713)
CCRS Comprehensive Conference Registration System Requirements Specification October 29 th, 2012 S.E.E. Solutions 1.
TechIT: A Work Order System Team Members: Marjorie Zalaya, Duc Le, Kevin Castillo, Minh Ha, Brandon Ung Faculty Advisor: Dr. Chengyu Sun ECST Liaison:
Introduction to CS Senior Design Project I / II
Preliminary Design Presentation
Presentation transcript:

Wednesday, May 1, 2013 Acceptance Test

IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next? Agenda 2 WORMS Conference Management System

Our Client: Dr. Darren Lim Professor of Computer Science Siena College Welcome 3 WORMS Conference Management System

Alyssa Nghiem Team Leader / Web Master Eduardo Pinto Barbosa Team Leader / QA Lead Ryan Kennedy Lead Programmer Christopher Small Assistant Programmer Tyler Vorpahl Web Designer Introduction 4 WORMS Conference Management System

Agenda 5 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

The CCSCNE conference is complex and difficult to manage CCSCNE - Consortium for Computing Sciences in Colleges North East Problem 6 WORMS Conference Management System

Web Organization Registration Management System Integrated System that handles… Attendee Registration Scholarly Works Submission Scholarly Works Review Information Access WORMS 7 WORMS Conference Management System

Agenda 8 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

Project Progression 9 WORMS Conference Management System

Agenda 10 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

Use Case Narratives 11 Describes the capabilities of each user

12 Conference Attendee Able to register for the conference Able to make meal selections Able to view a schedule of events for the conference

13 Submitter Uploads a scholarly work Specifies topics for the work Specifies a title for the work Able to check whether a submission has been reviewed Able to view a list of submitted works

14 Reviewer Submits credentials for approval Views a list of works assigned for review Downloads a PDF of each assigned work Submits a review for each assigned work

15 Submission Chair Able to accept or reject submitted scholarly works Able to view a list of the submitted scholarly works and their authors Able to approve or deny reviewer applications

16 Conference Chair Able to configure conference information Schedule time and location of events for the conference Able to configure banquet meal selections Able to configure the topics that submissions can be categorized into

17 System Admin Specifies addresses of Conference Chairs and Submission Chairs Configures the type of submission each Submission Chair is responsible for

18 Programming Contest Team Advisor Able to create a programming contest team Able to specify the members of the team

19 Programming Contest Participant Able to see that an advisor has assigned him/her to a team Able to view contest details

Agenda 20 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

Unit Testing 21 Unit Tests Determine whether or not each major component of the software functions properly Made up of Test Cases Test Case – an individual test Actions to perform Expected results WORMS Conference Management System

Unit Test Directory 22 WORMS Conference Management System

Unit Test Example 23 WORMS Conference Management System

Agenda 24 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

Integration Test 25 WORMS Conference Management System Integration tests were used to check whether system components worked together properly A system test is an integration test of all components Determines whether the functional requirements are met

Agenda 26 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

Acceptance Test 27 WORMS Conference Management System An Acceptance Test is a final test to determine whether or not all functional and nonfunctional requirements are met Each requirement is marked with a yes and no

Acceptance Test 28 WORMS Conference Management System

Acceptance Test 29 WORMS Conference Management System

Acceptance Test 30 WORMS Conference Management System

Acceptance Test 31 WORMS Conference Management System

Acceptance Test 32 WORMS Conference Management System

Acceptance Test 33 WORMS Conference Management System

Acceptance Test 34 WORMS Conference Management System

Agenda 35 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

Prototypes 36 WORMS Conference Management System Live Demo

Agenda 37 WORMS Conference Management System IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance TestLive DemoWhat’s Next?

What’s Next 38 WORMS Conference Management System Siena College Academic Celebration – May 3 Software Engineering Party – May 6 CSIS End of the Year Party – May 18 Graduation Commencement – May 19

The End 39 WORMS Conference Management System