SpaceOps Stockholm 2012- Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,

Slides:



Advertisements
Similar presentations
Addressing Technology Evolution and Accessibility Addressing Technology Evolution and Accessibility Disability Subcommittee FCC Technological Advisory.
Advertisements

Real Travel Savings with Virtual Meetings 1 Jeremy Stubbs General Manager, Sabre Virtual Meetings.
Systems Availability and Business Continuity Chapter Four Prepared by: Raval, Fichadia Raval Fichadia John Wiley & Sons, Inc
NETS Network Upgrade!.  304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper.
Flight Testing Advanced Unmanned Aircraft Michael McDaniel - AIR Naval Air Systems Command NAS Patuxent River, MD, USA DISTRIBUTION STATEMENT A:
Project Management Methodology Procurement management.
Channel Partner Conference 2013 Yarra Valley Apparelmaster System Development Collaborative Development with Strategic Software ABM Annual Channel Partner.
Discovering the Value of IP January 24, 2006 Don Fiorentino Vice President/General Manager.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
University of Southern California Enterprise Wide Information Systems Functionality and the Reference Model Instructor: Richard W. Vawter.
Supply Chain Operations: Making and Delivering
Part II: Strategic Planning for a Successful 1:1 Program
What is AeroCRS? AeroCRS is a complete reservation and operational system for a small-medium airline, the system includes: Reservations Either by agents.
ERP Solution In Hospital Yangyang Shao TTU What is an ERP? “ ERP – Enterprise Resource Planning ” (an integrated business operating system)
Use of Thin Clients in an Industrial Environment Foxboro Southeast User’s Group Birmingham, Al February 10-11, 2009 Walter Conner Senior Plant Engineer.
Software System Integration
IT ASSET MANAGEMENT (From Booz-Allen & Hamilton).
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
Chapter 12 Implementation
Systems, Design and Manufacturing Kernel Company Profile Rev 5.1 Dec, 2014.
1 The SpaceWire Internet Tunnel and the Advantages It Provides For Spacecraft Integration Stuart Mills, Steve Parkes Space Technology Centre University.
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
Server Virtualization: Navy Network Operations Centers
Atif Iqbal, R. K. Bagga.  Appropriate mechanism for good governance with the involvement of Information Technology in the system of the government and.
Complexity Optimization Strategic advantage via cutting edge mathematical optimization technology.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
Summary Device protocols tied intimately to applications. A need to significantly reduce critical data update times. Current network bandwidth consumption.
PCR Status report AESAG, September Supported by:
UIC ERTMS World Conference
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
Building and Maintaining Regional Optical Networks Gregg Shepperd Principle Services Product Manager, Fujitsu Internet2 Spring Conference April 25, 2007.
Why is Outsourcing a Problem? Customer view –length of contract –benefit tends to diminish over time –IT may be outsourced as a commodity, but later may.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
3-5 March 2004 ESA ODFCB, 3-5 March 2004 ESA Columbus Ground ODF Validation ESA ODFCB, 3-5 March 2004 Simon Challis, MSM-EO.
Chapter 12 The Network Development Life Cycle
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
OPF FOCUS GROUP The Provision of Co-location Facilities and Process Greg Mook 1 September 1999 OPF Co-location Focus Group.
How can collaboration be improved ? - can research collaboration facilitate growth for sub-suppliers? Kenneth Thomsen DTU Wind Energy Ane Holck DTU Innovation.
TRAFFIC HUB PROJECT. 1. Interchange of SADC traffic 2. Saving in Bandwidth and Cost 3. Speed and Quality of service.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Simplifying Customer Software Integration Tim Myers April 9 th, 2011 Colorado Undergraduate Space Research Symposium Payload Configuration GUI.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
LINIIS Mainframe Conversion Moving from Natural/ADABAS/COBOL to Java/SQL.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Research and Service Support Resources for EO data exploitation RSS Team, ESRIN, 23/01/2013 Requirements for a Federated Infrastructure.
Date: August 5, 2004 Originator: Angela Marsh/FD42 Page: 1 Payload Planning System (PPS) User Requirements Collection (URC) POIWG Status August 5, 2004.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Range Operations Craig Griffith Chief, Range Operations Branch WATR Operations Branch Dryden Flight Research Center February 21, 2001.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
Belgian User Support and Operations Centre B.USOC SOLAR Operations Concept and Services SOLSPEC Workshop 10 March 2015 BIRA/IASB.
Copyright © WhizTree Ltd All rights reserved. SAP Application Development Partner -
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Design Completion A Major Milestone
CERN Mobile network migration
10 – Workstation Fleet Logistics
Systems Design, Implementation, and Operation
12th IEEE PES PowerTech Conference
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
ESA's TEC Directorate Asset Management - Present and Future
Ground-Segment Reference Environment
Presentation transcript:

SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR, GSOC/Col-CC, Germany

SpaceOps Stockholm Page 2 Verbal communication is essential for Space Operations Col-CC Voice System: 2020 Users 140 voice terminals / keysets 404 voice loops 198 external voice channels An average of 5 voice formats per external interface Voice communication is essential especially: For manned space flight Payload operations For such highly distributed ground segments as for the ISS

SpaceOps Stockholm Page 3 The Col-CC Voice System connects The International Partner Control Centers MCC-H, MCC-M, HOSC ATV-CC Dedicated system for ATV operations EAC Dedicated system for training Local Keyset 60 keyset at Col-CC Remote Keysets 80 keysets at 21 ESA facilities

SpaceOps Stockholm Page 4 Why to change a running system??? Supplier announced to leave this market segment Last buy option for some equipment in 2008 To original system(s) for ESA GS were procured in 2001/2002 Some equipment reached end-of-life (e.g. keyset screens) Maintenance contract for Col-CC ran out end of 2009 a prolongation of this maintenance was very costly NASA announced a transition to digital interfaces within 3 years (Move) Development of digital interface to Move is difficult and costly Limited capacity at all interfaces, also keysets

SpaceOps Stockholm Page 5 General Rules for a Migration Transition to the new system is performed with minimal disruption to on-going operations A clear focus on minimal impact to real-time operations A balance to be found between: impact on on-going and planned activities (real-time, test/preperation and simulation activities) a cost effective and in-time transition the implementation schedule and constraints (internal and external) test and validation activities Not easy to achieve!

SpaceOps Stockholm Page 6 Day X Concept Complete built up of the new system in parallel and then switch-over to new system at day X.

SpaceOps Stockholm Page 7 Day X Concept – Draw backs Parallel installation of System at Col-CC rack space, cabling,… -> real no issue Parallel installation of local keysets console space, redundancy,… Parallel installation of remote keysets console space, double bandwidth, logistics (two travels)… Double interfaces to external systems double bandwidth, capability of interfaces (technical and sizing), logistics … Clear NoGo(s) for this approach!

SpaceOps Stockholm Page 8 Step-by-step Approach Build up of the new system while the old system is still in operations followed by coupled operations of both systems with a step-by-step migration to the new system. Migration Steps: 1.Preparation work at Col-CCno impact on ops rack space, cabling (including control rooms),… 2.Installation of main matrix at Col-CCno impact on ops stand alone testing 3.Coupling of old and new systemno impact on ops limited 96 shared loops, special conversion equipment 4.Installation of first set of local keysetsimpact on sim dedicated control rooms for simulation, training, testing

SpaceOps Stockholm Page 9 Step-by-step Approach contd. 5.Installation of EAC systemimpact on sim training system at EAC, system-to-system tests 6.Migration of International Partner Interfacesimpact on ops most critical activity, step-by-step 7.Migration of remote keysetsminimal impact on ops limited 96 shared loops, special conversion equipment 8.Installation of remaining local keysetsno impact on ops control room swaps,… 9.Decoupling of old and new systemno impact on ops End of migration Worked better than expected with much less impact than awaited

SpaceOps Stockholm Page 10 Problems and Constraints Planning with different parties Delays in shipment, customs, prep work at external sites Operational contraints Replanning of operations Close interface to Mission director(s), FCT, etc. Every step was presented to ops teams in detail ATV#2 flight Migration had to be coordinated with preperation for ATV#2 flight Interface change with ATV-CC system Required ad-hoc verification and re-scheduling to meet ATV#2 schedule Protocol conversion between old and new system Testbed with supllier beforehand Keyset Problems Change of roll-out plan for local keysets Delay of interface migration at MCC-H Temporary solution until now!

SpaceOps Stockholm Page 11 Testing and Validation The step-by-step approach required to deviate from a classical test and validation approach Factory acceptance Done in a classical way Limitation in validation of external interfaces Testbed with Col-CC was very useful Site Acceptance Campaigns Testing followed the step-by-step migration approach At each migration step was followed by a certain amount of testing Intrusive test only in stand-alone mode No intrusive tests after system was connected to external world and used for ops Simulations used for load test Site Acceptance Review Review of all testing performed during migration Operational Readiness

SpaceOps Stockholm Page 12 Conclusion A challenging project to replace an intensively and frequently used system during on-going operations. With help of all involved parties and a high amount of flexibility, paitience and understanding this became a success. Thanks to all involved teams! …and thanks for your attention!