PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.

Slides:



Advertisements
Similar presentations
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
PACS IIDR 01/02 Mar 2001 FPU Struts, Filter Wheel, Calibration Source1 D.Kampf, Dr. Roland Graue Kayser-Threde GmbH.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Test Readiness Review 23 October 2003 CRAL - LYON.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Status of the SWAP instrument
iSHELL Design Review Cryostat & Optics Bench
GLAST Large Area Telescope
SPICA / FPI Mechanical /Optical Issues
Presentation transcript:

PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R. Hofferbert, M. v.Berg

PACS IQR ESTEC 13 January 2005 Mech Qual Status 2 Overview Mechanical Qualification Status and Plans for PFM FPU structure - mirrors - baffles - black paint - impact of additional heaters and flashers Filter wheels Calibration sources Grating assembly Chopper WE units Delta Cryovibration Qualification Matrix (PhFPU presented by LR) (Ge:Ga arrays presented by JS)

PACS IQR ESTEC 13 January 2005 Mech Qual Status 3 FPU structure, mirrors, baffles: main data Total mass allocation in IID-A for PACS is 140 kg, mass requirement is met (margin 13.2 kg), FPU CQM has 74.1 kg Eigenmodes of complete FPU above 100 Hz, requirement is met for all axes (x,y,z = 188,122,104 Hz) verified by cryogenic vibration of FPU STM Mirror environmental tests OK, Au coating no concern (initial NCR closed), optical alignment check/stability on FPU CQM not done, after FPU STM cryo-vibration dummies mechanically checked Baffles structural OK Upgrades for PFM: none, except - additional baffles required to reduce stray light inside the FPU spectrometer section (see presentation by AP), - modification of detector baffles to carry flashers for curing

PACS IQR ESTEC 13 January 2005 Mech Qual Status 4 PACS FPU Architecture – 6 Stand Alone Modular Substructures Top Optics with Chopper (C.Z.) and 2 Calibration Sources Image Slicer Bolometer Optics with Filter Wheel PhFPU with 0.3 K Cryo-Cooler (CEA) Collimator with Grating Assembly (CSL) Spectrometer with Ge:Ga – Photoconductor Arrays (MPE), Filter Wheels, Distribution Boards (Cold Electronics) Level 0 Thermal Links - Thermal Feed Throughs (1.7 K)

PACS IQR ESTEC 13 January 2005 Mech Qual Status 5 FPU Analyses All FPU Analyses Performed

PACS IQR ESTEC 13 January 2005 Mech Qual Status 6 PACS FPU Structural Verification Tests completed Similarity CQM and STM were manufactured parallel with the same drawings out of the same lot Qualification Tests STM vibration tests Conclusion: FPFPU Housing is structurally qualified Tests completed LHe-VibrationVibration res.src.

PACS IQR ESTEC 13 January 2005 Mech Qual Status 7 FPU Cryovibration Qualification Breakdown  All Items Qualified # means remaining problems to be solved resp. delta-vibration to be done

PACS IQR ESTEC 13 January 2005 Mech Qual Status 8 Structural Analyses - Status  Evaluation of ambient (STM) and cold vibration tests (Cryo STM)  FEM calibration  Load analyses with calibrated model (cryo-vibration test)  Strength analyses for FPU metallic and CFRP components  Cryogenic material properties analyses  CoG, MoI analyses  Displacement, distortion, deformation analyses All Documentation released

PACS IQR ESTEC 13 January 2005 Mech Qual Status 9 Approach to FPU PFM Cryovibration Protection of sensitive subsystems during acceptance vibration, random loads not to exceed 10 g rms Dynamic analysis of PACS on CSL shaker performed by ESA - response of red and blue bolometer FPA and their relation with a point on the outside of PhFPU housing determined - mounting of a triplet-accelerometer foreseen Frequencies and Q-values are to be checked during warm FPU- STM vibration at MPE Notching at the PACS feet during PFM cryovibration at CSL

PACS IQR ESTEC 13 January 2005 Mech Qual Status 10 FPU PFM Test Plan and PFM MAIV Status Subsystem level (FW, CS, DBs, Substructures) –Mechanical and Thermal Test program as given in Test Plan (similar to CQM) –Outbaking at 80 °C (minimum) –Functional test program as given in test plan (similar to CQM) –Substructures alignment verification -Cryogenic stability tests (tbc) System level (FPU) –Cryovibration test (KT support at CSL) –Functional test (KT support at MPE)  MAIV Status  Metallic items manufactured  CFRP items manufactured and static load tested  Calibration Sources manufactured and partly assembled  FW assemblies manufactured, pre-tested on motor drive level, partly assembled  Pre-assembly (fit check in progress)

PACS IQR ESTEC 13 January 2005 Mech Qual Status 11 FPU Black Paint: main data of KT72 PACS-RFW-0003 agreed: out-gassing requirements met Optical performance: satisfying Adhesion on Al surfaces: satisfying Particle release below 100ppm, improvement advised: impact of pre-vibration under investigation, additional cryogenic vibration planned in February 2005, CEA: concerned about particle fall-out onto bolometer FPAs, MPE: protection of grating/FW bearings might be advisable Upgrade for PFM: very likely none

PACS IQR ESTEC 13 January 2005 Mech Qual Status 12 Impact of additional Heaters and Flashers 2 heater resistors on the red detector array: mass increase 0.2% > no impact on mechanical behaviour 2 flashers mounted at the end of each detector array baffle: mass increase few % > no impact on mechanical behaviour Additional wiring inside the FPU required (mass negligible) Re-routing on both distribution boards required (redesign) mass increase on one board due to a new connector > no impact on structural properties expected For detector curing PACS needs to implement additional heaters and flashers in the FPU. The impact on the mechanical properties of both detector arrays (Upgrade for PFM) is estimated as follows (detailed design in progress):

PACS IQR ESTEC 13 January 2005 Mech Qual Status 13 FPU Filter Wheels Photometer FW : OK (initial blocking by a screw resolved) Spectrometer FW problematic: - during CQM ILT blocked at 4K - during warm-up partial movement at 90K Currently investigations on CQM wheel at KT in progress: - at 77K higher friction observed - ball bearing sensitive to abrasion during warm vibration? - baffle removed for better inspection of drive - blocking of rotor on one Hall sensor found - new cryogenic verification test planned Upgrade for PFM: revised tolerance of bearing support

PACS IQR ESTEC 13 January 2005 Mech Qual Status 14 Filter Wheel Assembly  Required Torque to Leave the Filter Position : 0.5 Ncm  Maximum Motor Torque Performance : 4.2 Ncm.  Motor & Position Indicator are in Powerless Dormitory Mode between Operations  Position Locking Principle: Contact-less Magnetic System  No Launch Lock Mechanism Required

PACS IQR ESTEC 13 January 2005 Mech Qual Status 15 FPU Calibration Sources Cryogenic qualification on EM during FPU STM vibration Upgrade for PFM: None

PACS IQR ESTEC 13 January 2005 Mech Qual Status 16 Calibration Source Lay-out Wavelength/scattering optimised surfaces 2 identical Calibration Sources mounted in FPU Operation at 4 K, Emitter temperature K  Sphere (inner diameter 51 mm)  Redundant Combined Sensor and Emitter (PT 500)  Circular aperture (diameter 12 mm) with Si lens put in front of aperture  Surface with Lambertian stray light behaviour and high reflectivity (> 0.992)  Emitter suspension:  4 filigree GFRP struts with 24 x 0.25 x 0.25 mm³  Titanium coated for 4 wire connection to the source

PACS IQR ESTEC 13 January 2005 Mech Qual Status 17 FPU Grating Assembly Cryogenic vibration qualification on EM plus additional qualification (vibration, cryo-cycling) on CQM incl. launch lock mechanism at subsystem level: OK Movement quality of grating CQM: OK Functionality of launch lock mechanism of CQM: OK Upgrades for PFM: - modified routing of internal harness needed - Inductosyn transformer needs to be mounted inside the grating assembly (for CQM currently on FPU outside) - Fixation of grating plate on axis has to be improved - cleanliness before delivery for integration with FPU to be improved and protection cover advised

PACS IQR ESTEC 13 January 2005 Mech Qual Status 18 FPU Chopper Development performed as specified in IHDR presentation (environmental tests, lifetime test …) Minor deviations for CQM: - envelope violation of cable housing (solved) - cryovibration done on subunit level at 77K only (agreed) (no LHe vibration with CQM performed) Upgrades for PFM: - no deviation from MPIA/ZEISS development plan foreseen - Au coating of mirror very likely to be changed (thickness and coating process to be improved)

PACS IQR ESTEC 13 January 2005 Mech Qual Status 19 WE Units AVM / STM WE Unit testing - No structural tests required in general - STM BOLC: Vibration tests done : validation of design > Problem with displacement of boards - STM BOLC PSU sub-unit vibrational tested : OK CQM / AVM ILT - No structural test on WE Units foreseen PFM (QM) WE Units - Full environ. test program agreed before FM delivery to MPE - First structural results for QM SPU available (> some NCRs) - New mechanical design for DPU CFM / PFM, will be fully tested Mass margin for PACS is 13.2 kg in total (DECMEC mass uncertainty not critical in this respect)

PACS IQR ESTEC 13 January 2005 Mech Qual Status 20 Delta Cryo-vibration Qualification Matrix of FPU Subunits FPU SubunitDelta cryo- vibration qualification Scheduled PhFPU (bolom.+cooler) Done (upgraded STM) October 04 Ge:Ga-array internal cooling link with I/Fs Open (STM housing + FM components) March 05 Ge:Ga-array suspension strut electr. insulation Open (STM housing + FM components) March 05 Grating assembly CQM incl. L Lock Done (CQM) February 04 Unchanged Development Concept & Model Philosophy since IHDR Approval of PACS-RFW-0007 expected !