1 BROOKHAVEN SCIENCE ASSOCIATES Abstract NSLS-II Performance and Magnet Lattice S. Krinsky, NSLS-II Project In this presentation, we introduce the NSLS-II.

Slides:



Advertisements
Similar presentations
Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
Advertisements

BROOKHAVEN SCIENCE ASSOCIATES CD2 LATTICE IMPROVEMENTS Accelerator Systems Advisory Committee April 23-24, 2007 Stephen Kramer for the NSLS-II Design Team.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
1 BROOKHAVEN SCIENCE ASSOCIATES Considerations for Nonlinear Beam Dynamics in NSLS-II lattice design Weiming Guo 05/26/08 Acknowledgement: J. Bengtsson.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
K. Balewski (DESY)IWBS Conceptual Design of the PETRA III Orbit Feedback K. Balewski, H.T Duhme, J. Klute, I. Krouptchenkov, R. Neumann, G. K. Sahoo,
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
ALPHA Storage Ring Indiana University Xiaoying Pang.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
1 BROOKHAVEN SCIENCE ASSOCIATES NEXT and ABBIX projects Steve Hulbert Beamline Project Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
Alignment and Beam Stability
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 NSLSII Footprint F. Willeke, April 23, 07 Accomodation of Extra Long Straights Considerations.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill CFAC review October 18 th, 2006.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Accelerator Systems F. Willeke, Director Photon Sciences Accelerator Division NSLS-II Project Advisory Committee Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Experimental Facilities Advisory Committee May 10, 2007 Satoshi Ozaki Director,
An ultra-low emittance lattices for Iranian Light Source Facility storage ring Esmaeil Ahmadi On behalf of beam dynamics group Iranian Light Source Facility.
PEP-X Ultra Low Emittance Storage Ring Design at SLAC Lattice Design and Optimization Min-Huey Wang SLAC National Accelerator Laboratory With contributions.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
1 BROOKHAVEN SCIENCE ASSOCIATES Impact of Errors and Damping Wigglers on the Lattice W. Guo 02/26/2009 NSLS-II ASAC Meeting Acknowledgement: M. Borland.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
1 BROOKHAVEN SCIENCE ASSOCIATES 1 NSLS-II Lattice Design 1.TBA-24 Lattice Design - Advantages and shortcomings Low emittance -> high chromaticity -> small.
Single particle dynamics in the ThomX ring Jianfeng zhang 12/02/2015 LAL.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
Muon Collider Physics Workshop FNAL November 10-12, 2009 Muon Collider Lattice Design FERMI NATIONAL ACCELERATOR LABORATORY US DEPARTMENT OF ENERGY f Y.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Super-B Vibration Tolerances
Off-axis injection lattice design studies of HEPS storage ring
Diamond Light Source Status and Future Challanges
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Bocheng Jiang SSRF AP group
Low Emittance Rings 2014 Workshop
NSLS-II Lattice Design Strategies Weiming Guo 07/10/08
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
First Look at Nonlinear Dynamics in the Electron Collider Ring
Status of PEP-X Lattice Design Study
An overview the ASTRID2 storage ring and its RF system
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
Overall Considerations, Main Challenges and Goals
Proposal for a CESR Damping Ring Test Facility
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Abstract NSLS-II Performance and Magnet Lattice S. Krinsky, NSLS-II Project In this presentation, we introduce the NSLS-II storage ring magnet lattice and review the basic machine performance parameters. In particular, we discuss the requirements on dynamic aperture necessary to achieve acceptable injection efficiency and Touschek lifetime. The tight specifications on the harmonic content of the magnetic fields in the NSLS-II multipole magnets have been set to assure sufficient dynamic aperture not only for the bare NSLS-II lattice but also to leave room in the nonlinearity budget for the installation of 27 or more insertion devices to serve as the sources for the user research programs. *Work performed under auspices of the United States Department of Energy, under contract DE-AC02- 98CH10886

2 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Performance and Magnet Lattice Samuel Krinsky NSLS-II Accelerator Physics Group Leader NSLS-II Magnet Production Workshop April 11-12, 2012

3 BROOKHAVEN SCIENCE ASSOCIATES Beam PropertyGoal Horizontal emittance (nm-rad)<1 Vertical emittance (nm-rad)0.010 Average current (mA)500 Straights for insertion devices27 Orbit stability (% of beam size)10 Touschek lifetime (hrs)>3 Top-off injection frequency (/min)<1 Some Basic NSLS-II Project Goals

4 BROOKHAVEN SCIENCE ASSOCIATES Technical Requirements & Specifications Energy 3.0 GeV Circumference 792 m Number of Periods 30 DBA Length Long Straights 6.6 & 9.3m Emittance (h,v) <1nm, 0.008nm Momentum Compaction Dipole Bend Radius 25m Energy Loss per Turn <2MeV Energy Spread 0.094% RF Frequency 500 MHz Harmonic Number 1320 RF Bucket Height >2.5% RMS Bunch Length 15ps-30ps Average Current 500ma Current per Bunch 0.5ma Charge per Bunch 1.2nC Touschek Lifetime >3hrs Top-Off Injection rate 1/min

5 BROOKHAVEN SCIENCE ASSOCIATES Injection System Local Control Room Linac Tunnel Klystron Gallery Equipment Racks for Linac and LTB line

6 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring

7 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Cell Configuration 10 quadrupole magnets per cell, independent power supplies (initially 4 quads in the matching section) 9 sextupole families, 3 chromatic and 6 geometric. (initially 12 sextupole families) 2 slow correctors and 2 BPMs per girder to allow girder by girder orbit correction 2 additional high stability BPMs in each straight section to improve stability 3 fast correctors per cell for fast orbit correction most of the magnet to magnet separation is standardized to 17.5 cm. (straights increased from 5/8 to 6.6/9.3) 3-pole wiggler was added to the lattice to provide dipole radiation F F F C C C C C C F 3-pole wiggler

8 BROOKHAVEN SCIENCE ASSOCIATES Lattice Functions for One Cell

9 BROOKHAVEN SCIENCE ASSOCIATES Reduction of Emittance with Damping Wigglers Baseline design has three damping wigglers: L=7m, B=1.8T

10 BROOKHAVEN SCIENCE ASSOCIATES Types of source Long ID 1-T 3-Pole wiggler Bend magnet Short ID  x (µm)  x’ (µrad)  y (µm)  y’ (µrad) Lattice Functions Electron Beam Sizes & Divergences Most challenging Beam stability Requirements = ~ 0.31 μm SR Lattice & Electron Beam Sizes/Divergences

11 BROOKHAVEN SCIENCE ASSOCIATES SR BPMs and Correctors Fast correctors (Qty=3) Fast response – 2 kHz Weak strength – 15 μrad Utilized for – Fast orbit feedback Slow correctors (Qty=6) Slow response – 2 Hz Strong strength – 800 μrad Utilized for – Alignment Slow orbit feedback BPMs 156 mm slow 100 mm slow 30 mm fast (air core) SC FC

12 BROOKHAVEN SCIENCE ASSOCIATES Touschek Scattering Energy acceptance is smaller if electron is scattered at high dispersion Scattering rate is smaller for high dispersion, since bunch volume bigger δ acc Small η δ acc Large η Lifetime (hrs) 3%2.5% % %2.0% %1.5%2.3 Touschek Lifetime σ s =15ps w/o Landau Cavity

13 BROOKHAVEN SCIENCE ASSOCIATES Requirements on Dynamic Aperture Injection: we need to maintain particles with initial displacement of about 11mm. We therefore look for solutions with calculated on-momentum dynamic aperture of >15mm (including IDs and errors) Touschek lifetime: we require the Touschek lifetime to be >3hrs with Landau cavity. Therefore, our goal is to achieve a calculated energy acceptance of +/-2.5% for scattering at low dispersion and +/- 2.0 % for scattering at high dispersion. This will provide sufficient margin to allow for effects not included in the tracking simulations.

14 BROOKHAVEN SCIENCE ASSOCIATES Introduction of Third Chromatic Sextupole Knob Allows reduction of second order horizontal chromaticity while maintaining flexibility in Geometric sextupoles to correct the tune-shift with amplitude. --moved one of the defocusing chromatic sextupoles toward max dispersion

15 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamlines Underway Beamline ConstructionProjects SETE NSLS-II Project Beamlines Inelastic X-ray Scattering (IXS)11 Hard X-ray Nanoprobe (HXN)11 Coherent Hard X-ray Scattering (CHX)11 Coherent Soft X-ray Scat & Pol (CSX) 22 Sub-micron Res X-ray Spec (SRX)11 X-ray Powder Diffraction (XPD)11 NEXT MIE Beamlines Photoemission-Microscopy Facility (ESM)23 Full-field X-ray Imaging (FXI)11 In-Situ & Resonant X-Ray Studies (ISR)12 Inner Shell Spectroscopy (ISS)11 Soft Inelastic X-ray Scattering (SIX)11 Soft Matter Interfaces (SMI)12 ABBIX Beamlines Frontier Macromolecular Cryst (FMX)11 Flexible Access Macromolecular Cryst (AMX)11 X-ray Scattering for Biology (LIX)11 Type II Beamlines Spectroscopy Soft and Tender (NIST)26 Beamline for Materials Measurements (NIST)11 Microdiffraction Beamline (NYSBC)11 TOTAL Beamline Construction Projects Underway 21 Simultaneous Endstations (SE) 28 Total Endstations (TE) 22 additional beamlines (25 SE) have been proposed by the user community and approved by the SAC and NSLS-II but are not yet funded Beamlines with design and construction underway

16 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II, NEXT, and ABBIX Insertion Devices PPM: Pure Permanent Magnet EM: Electro Magnet H: Hybrid Magnetic Design BL ID straight type ID type, incl. period (mm) LengthK max FE type † FE aperture (h x v, mrad) # of ID's (base scope) # FE'sProjectProcurement CSX lo-βEPU49 (PPM) x24m (2 x 2m)4.34canted (0.18)0.6 x 0.621NSLS-IIDone IXS hi-βIVU22 (H) x26m (2 x 3m)1.52std0.5 x 0.311NSLS-IIRFP due Jan.’12 HXN lo-βIVU20 (H)3m1.83std0.5 x 0.311NSLS-IIDone CHX lo-βIVU20 (H)3m1.83std0.5 x 0.311NSLS-IIDone SRX lo-βIVU21 (H)1.5m1.79canted (2.0)0.5 x 0.311NSLS-IIDone XPD hi-βDW100 (H)6.8m (2 x 3.4m)~16.5DW1.1 x NSLS-IIDone ESM hi-β EPU56 (PPM) & EPU180 (EM) 3m 4m canted (0.5)0.6 x 0.621NEXT SIX hi-βEPU49 (PPM) x26m (2 x 3.2m)3.5std0.6 x 0.611NEXT ISR hi-βIVU23 (H)3.0m *canted** (2.0)0.5 x 0.311NEXTProcure w/LIX SMI lo-βIVU22 (H)1.3m2.05canted** (2.0)0.5 x 0.311NEXT ISS hi-βDW100 (H)6.8m (2 x 3.4m)~16.5DW1.1 x NEXTDone FXI hi-βDW100 (H)6.8m (2 x 3.4m)~16.5DW1.1 x NEXTDone FMX lo-βIVU21 (H)1.5m1.79canted (2.0)0.5 x 0.311ABBIXSRX Option AMX lo-βIVU21 (H)1.5m1.79canted (2.0)0.5 x (joint w/FMX) ABBIXSRX Option LIX hi-βIVU23 (H)3.0m *canted** (2.0)0.5 x 0.311ABBIXProcure w/ISR † For canted IDs/FEs, ( ) shows canting angle in mrad * Depending on location within ID straight section ** Off-center canting magnet location in ID straight section

17 BROOKHAVEN SCIENCE ASSOCIATES ID Field Error Comparison 1 st & 2 nd Integrals Cf G.cm.cm corresponds to 1 micron in displacement at NSLS-II

18 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Schedule