SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, 20061 SIS 18-6 Charge Separator W.

Slides:



Advertisements
Similar presentations
FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
Advertisements

JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
FAIR Synchrotrons SIS100/300
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Feb 09, 2012 L. Vorobiev, I. RakhnoPage 1 Multi-Turn Stripping Injection and Foil Heating with Application to Project X Presentation Based on: Phys. Rev.
The GSI UNILAC Upgrade Program for FAIR Requirements, L. Dahl, HIAT, Venice, Staff: 1,100 (~ 50% permanent) Accelerators: UNILAC; SIS; ESR User:
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
ESS DTL beam commissioning
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
RF source, volume and caesiated extraction simulations (e-dump)
Imperial College London 1 6. Injection into and ejection from circular machines PREACCELERATOR ACCUMULATORRING PARTICLESOURCE INJECTION 1 EJECTION INJECTION.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Principals of fast injection and extraction R. Apsimon.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Injector Upgrade for FAIR W. Barth W. Barth, Injector Upgrade for FAIR, ICST, Worms/Germany.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Preparation Phase of the FAIR Project
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
M.J. Barnes : Canadian Involvement with LHC
A.Lachaize CNRS/IN2P3 IPN Orsay
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Injector Cyclotron for a Medical FFAG
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
Have a chance to operate your own beam at CERN
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
Large Booster and Collider Ring
Beam-beam Effects in Hadron Colliders
Compact and Low Consumption Magnet Design The DESY Experience
Introduction to particle accelerators
LHC (SSC) Byung Yunn CASA.
Advanced Research Electron Accelerator Laboratory
Considerations on Beam Diagnostics Physics
CLIC damping rings working plan towards the CDR
commissioning and measurements
MEBT1&2 design study for C-ADS
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, SIS 18-6 Charge Separator W. Barth Introduction Present Charge Separation System Advanced Beam Dynamics Layout Technical Layout Project Status Modified working plan Manpower, Costs L. Heyl, J. Glatz, M. Kaiser, Ch. Will +...

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, The GSI UNIversal Linear ACcelerator High Current Injector Alvarez Single Gap Resonators

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Transfer Line to the SIS 18 Single Gap Resonators Foil- stripper Charge State Analysis to SIS 18 FAIR: 40 emA (1490 kW)

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Present Charge Separation System Stripper-system consisting of 3 pathways 25m space charge dominated beam transport for the stripped beam (multi charge state beam) leads to significant emittance growth Charge analyzing system (11  -dipole) with a resolution of 1.5% is sufficient for low intensity beams with only small emittance areas Difficult beam optimization for transport from the stripper to the charge separation. Foilstripper 25m

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, New Charge Separator-Concept Compact (6m) system of four vertical 35  -1.6 T-dipole magnets (field homogeneity  1.5 %) Sufficient for pulse operation: 3 Hz pulsed mode, 5 Hz demand mode Dipole chamber with low eddy currents in pulse operation, copper walls and apertures for low radioactivity from the impact of unwanted charge states, cooling and protection from thermal stress Stripper-system integrated Short (space charge dominated) beam transport (multi charge state beam): 1m less emittance growth Intensity gain inside SIS-acceptance  20% Charge-resolution ≤ 1% Improved beam operating

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Stripper Concept with (more than) 3 Pathways High Current Operation No Stripping Low Current Operation High Current Operation (FAIR) Quadrupole Foil exchanger (20 stripper foils)

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, New Charge Seperator: Beam Dynamics I horizontally Stripper Foil for high current heavy ion operation (sweeper)... for medium current operation (sweeper)... for low current operation (kicker) Kicker 2 Sweeper 2

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, New Charge Seperator: Beam Dynamics II vertically

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, New Beam Diagnostics Test Bench quadrupole dupletthor./vert. slit profile grid h/v-steerer beamdump ion current beam profile position (correction) beam emittance bunch structure (non destructive) beam energy

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Technical Layout/Overview dipole 1&2 dipole 3&4 kicker 2 beam diagnostic box (profile grid, analyzing slit) (double-) kicker 3 quad- doublet beam diagnostic boxes (emittance measurement) beam dump no change reused components steerer + beam transformers + phase probes

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, list of components

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Status/component list

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Dipole magnets dipole 1 dipole 2 dipole 3 dipole 4 segment (for dipole 1) 01/2006 specification 02/2006 call for tender 04/2006 ordering 12/2006 delivery to GSI

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Dipole chambers copper layers water cooling

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Technical Layout Charge separator system New beam diagnostics test bench

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Project Status Components cooling water (esimated for LASEP+beam diagnostics bench) advanced beam dynamics fixed new beam diagnostics test bench design/techn. layout dipoles ordered most of the components in house/ordered dipole chamber (specs, call for tender, ordering) 2007 carriage system (specs, call for tender, ordering) 2007 preparation of controls system additional beam diagnostics defined, partly ordered technical layout/drawings of the whole beam line shutdown planning 2007 planning of infrastructure (media, cable) started no show stoppers

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Working Plan (pre-)assembly of the complete charge separator Insertion in the transfer line

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Investment, personnel t echn. (3Y), 01/03/2006 eng. (3 Y/50%), 01/02/2006 EU-personal hired: GSI-personal: - scientist (50 %) - task 5/senior scientist (temporarily) steerer (24 k€) phase probe (5 k€) SEM-grid (11 k€) High current slits (23 k€) techn. layout/ext. (15 k€) (basic approach: 465 k€)

SIS 18-6 (Charge seperator), W. Barth, annual meeting, EU construction (CNI) contract "DIRAC-PHASE-1", September 26, Beam Dynamics III Charge Separation Emittance Growth L. Groening