LNGS Scientific Committee Status of OPERA/CNGS1 April 8 th, 2005 Yves Déclais on behalf of the OPERA Collaboration.

Slides:



Advertisements
Similar presentations
May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
1 STILL open points: lead, ECC Packaging, CS laminated film, skates Construction Strategy Working groups BAM design and construction BAM LNGS site preparation.
December 8 th, 2006Detector Construction status report Yves Déclais 1 OPERA Detector Preparation 1. Electronic Detectors: status of installation 2. Brick.
Survey(s) of TT8 10/12 TT 8 after wall1 16/12 TT 8 Standalone.
1 BMS activities and brick maniupulation Short summary of 2008 activities and results Extraction and filling activities foreseen in 2009 Black CS extraction.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Status Report on OPERA Emulsion Nakamura M. Nagoya 2006,Dec.7.
November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components.
Neutrino Event location Connection from Electric Detector to Emulsion Detector Tsutomu FUKUDA Fundamental Particle Physics Lab, Nagoya-univ 9th March,
1 Brick manipulation report BMS machines status Black CS extraction status CNGS brick candidate extraction and BMS planning for 2009 D.Duchesneau LAPP,
Research History of Tsutomu FUKUDA Tono-Refresh facility Facility construction Mass production shift leader Refreshing control Sensitivity.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
M. Dracos, CEA, 10/04/ Double Beta experiment with emulsions?
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
1 BAM status report S.Buontempo on behalf of BAM Committee BAM Committee Firm Pre-selection Tender Documentation BAM site preparation Project strategy.
Emulsion quality WG2 report Thanks to all the OPERA colleagues who are engaged on handling and developing emulsion.
Gran Sasso, 19/03/2003 OPERA Project Board meetingH. Pessard / 1 Brick Manipulator System (BMS) project uEvolutions and final design n Brick sliding and.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Tracking Integration Challenges Y. meeting 2013/9/25.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Status of the Brick Manipulation database development Introduction: goal and principles System analysis –The brick life –Manipulation procedures Proposed.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
September 11th, 2006LNGS and the Neutrinos from CERN OPERA 1 OPERA O scillation P roject with E mulsion-t R acking A pparatus.
R. ZimmermannDortmund, April OPERA physics motivation - CNGS physics motivation - CNGS OPERA detector OPERA detector ν τ appearance ν τ appearance.
OPERA bricks LNGS G.Rosa, C.Sirignano Emulsion Workshop, 7-9 December 2006.
Wall survey: With and without TT7. The wall targets are hybrid targets made of precise uncoded targets (the pin targets) which enter in the hole of the.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research ISU, 12 th February, 2007.
Operation of and results from OPERA Ciro Pistillo LHEP Bern University CHIPP Plenary meeting Lausanne, EPFL-LPHE September
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
OPERA Emulsion Workshop – Nagoya, 7-9 Dec From CS to Brick: first results from low density cosmic ray exposure at LNGS M. De Serio from Bari emulsion.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
Brick gas tightness & emulsion-lead compatibility Opera Collaboration Meeting Hamburg, June 2004 F.Laudisio, G.Romano, C.Sirignano Salerno Emulsion.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 Photogrammetry of TT7. 2 Front view Distribution of all targets All the plots are in the magnet reference system.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Changeable Sheet A.Ariga, Nagoya univ. CS strategy R&D~2004-Oct –BG rejection Distortiondistortion itself, precise measurement, packing Self-Refreshparameter.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
ATLAS micromegas activities (MAMMA)
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
C.Gustavino, june 4th 2004, Hamburg XPC Status report VETO status report Glass RPC R&D Outline:
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research Dubna, 25 th January, 2007.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
Opera Collaboration Meeting Hamburg, Juni 2004 Caren Hagner Precision Tracker: Schedule and Funding Issues 1 SM = 96 Modules 1 Module: 4 planes,
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
ELENA installation progress F. Butin / ELENA collaboration.
Experience from Antoine Cazes, nuFact’08 Valencia
Status of the OPERA experiment
OPERA Stato dell’esperimento Run 2007
CMS Goal of the experiment
OPERETTE TEST BEAM EXPERIMENT :
Presentation transcript:

LNGS Scientific Committee Status of OPERA/CNGS1 April 8 th, 2005 Yves Déclais on behalf of the OPERA Collaboration

Milestones shift Target installation commissioning: sep 04  April 05 Emulsion LNGS : oct 04  January 05 CS strategy changed Lead Tender : december 04  April 05 BAM factory : feb 05  July 05 BAM Hall commissioning : dec 04  July 05 ? BMS automation validation : dec 04  January 05 Start brick filling : sep 05  January /February 06

OPERA installation status Good news : Magnet 2 completed SM2 mechanical structure ready by june 05 XPC installed for spectrometer 1 HPT installation test successful spectrometer 1 completed by december 05 Delivered emulsion : good quality SUTS university BAM and BMS factory progressing as expected Automated emulsion changer Worries : administrative and funding difficulties commissioner work interference human ressources

OPERA status Outline of the status report: 1.Target installation 2.CS LNGS 3.Revised schedule 4.Funding and administrative issues

Target Installation first TT wall inserted september 04 first brick wall inserted december 04 measurements of the geometry of the walls by photogrametry December 04 We reached the conclusion that we cannot fullfil the specs for the target assembly The photogrametry is a powerful tool allowing us to understand the difficulties ( 50 μm resolution achieved ) We appreciated the support from LNGS for providing photogrametry and automatic teodolite tools

Target : top view Brick Wall BMS TT Rock side Width_Wall Width_BMS Width_TT Pitch = width_TT + Max ( width_wall, width_BMS ) Specs : 38.4 mm (TT) mm (wall) = 124 mm thickness clearance  wall : = 88 BMS : = 88 TT : = 46  new pitch : 134 mm New target supporting rails ordered feb 05 installation and alignment end of april resuming target installation may 2th

Target installation improvement : status upgraded geodesic reference system installed online positioning tool (.3mm accuracy) available and tested Brick wall planarity inside the specs: 1mm clearance achieved BMS positioning accuracy for the 3 axes : better than 1mm TT wall tooling for improving planarity : produced and tested now

Changeable sheet : baseline option R&D~2004-Oct –BG rejection Distortion: distortion itself, precise measurement, packing Self-Refresh: parameter study –Aging test at high humidity sensitivity, fog, etc. CS packing machine development started ~May 04 Production starting May 05 ~ 1000CS/day –Humid packing at Nagoya. –Initialization at Gran Sasso (self-refresh acceleration, 30degC 1month etc) By tuning the development procedure the distortion is removed intrinsically. –at the level of   < 2mrad. –Now the observed distortion is dominated by the stage accuracy and measurement.

4 months CS self refreshing test result (march05) 80% 90% 95% 15 ℃ 20 ℃ 30 ℃ Self-Refresh after 4 months High humidity packing Accelerated self refreshing at high temperature Cannot be used CS should be LNGS underground BG density / cm 2 Refresh in GS with new Gel10 Refresh in GS with OPERA gel50 (Tono mine data) Refresh in Nagoya and weak Self-Refresh~100 Refresh in Nagoya and no Self-Refresh1000 (first shipping data) No Refresh4000 Goal 

CS Refreshing and packing facility ( under the responsability of Nagoya group) CS Production time ~4 months Operational before BAM commissioning Refreshing 4x2.5 m 2 Packing 4x2.5 m 2 Build a new emulsion facility (12x3 m 2 ) underground containing : an upgraded processing lab ( needed for the BAM commissioning in waiting the new building ) the refreshing facility the CS packing facility When the new one will be commissioned the existing facility in the TIR gallery would be removed

CS : complementary studies singlet or doublet emulsion sheet in the CS enveloppe  random track number very low  This would allow to keep open the possibility to use it for brick finding validation positioning accuracy between CS and first brick emulsion  Xray gun : goal 10μm new gel  will reduce by a factor 5 the density of remnant tracks

BAM schedule Design, Construction and Tests in the firm:February 2004 to July 2005  Final lead not available for the (lead tender delay) Delivery at Gran Sasso laboratory:August 2005  BAM hall commisioning july 05  cooling water available july 05 Assembly, installation, commissioning:September to November 2005 Production acceptance tests at Gran Sasso: December 2005  Lead delivery  CS production validated and started Brick mass production:January 2006 to January 2007  Space in Hall B

Revised installation schedule Target SM1 installation : may to november 05 BMS installation and commissioning october 05 to january 06 CS facility commissioned october 05 BAM fully commissioned december 05 Spectrometer SM1 completed december 05 SM1 Brick filling starting january / february 06 SM2 Brick filling starting july / august 06 RPC, XPC, HPT commissioning with gas january 06 « Assuming no interference with the commissioner work »

Precision Tracker : funding issues Present BMBF funding period: jan2004 – june2006 Uni Hamburg receives funds for march2004-june2006 ~ 1.05 M Euro (asked in 2004 for 1.6 M Euro: invest 900k, salaries 520k + travel & transp.) Money flow from BMBF: 2004: 370kEuro, 2005: 490kEuro, 2006: 190kEuro this is the cost for 1 SM (~2/3 of full material cost, ~1/2 salaries, 1/2 tt) (Updated) need to complete full detector in time: 330kEuro (Material) + 370kEuro (man power) = 700kEuro Note: HERA-B muon gas system recuperated The mass production of the first spectrometer will be completed by november 05 If the mass production for the second spectrometer is resumed mid 06 it will last upto mid 07 and so there will be no spectrometer for SM2 for the 2007 run ! The mass production should not be stopped !

Funding issues October 04 situation: still some funding issues (some are pending to the BMBF decision) 700 k€ for the Precision Tracker (2 nd Spectrometer) 750 k€ for the German contribution to the lead 500 k€ for the Lead cleaning machine (overcost) Tax free regime for CNGS  VAT and custom for emulsion  VAT for Lead ( 1.2 M€ ) April 05 situation: VAT and Custom for Emulsion: solved BMBF will restart discussions in may Lead Tender closed : 6 M€ + taxes no solution to escape VAT for lead INFN can endorse the overcost but not the German contribution

CNGS Laboratory Issues interference with the commissioner work : highway closure, TIR gallery  continuous coordination needed gas system (RPC, XPC, HPT) autorisation Service space in the underground lab : Hall B BOREXINO loading station to be moved : PC use is supposed to be resumed by mid 06 External building completion in time : civil engineering september 05 Computing support : network, mass storage, database Strengthening the LNGS Physics group

Human resources - Very heavy tasks in running phase due to: - emulsion processing - emulsion handling - emulsion scanning - Weakening of the Collaboration strength expected for the running years - decreasing of staff members due to retirements (some institutions could disappear ) - young people not ensured to remain in the Coll. due to difficulties of Funding Agencies - New generation of neutrino projects diverts resources

Front view 1 mm Plane 8 + wall 1 Sagitta shape Plane 8 standalone Trying to reduce the sagitta TT plane End caps survey Front View Difficulties with the sagitta of the TT supporting beam

Red: Top end-caps Blue: Bottom end-caps Green: Gallery end-caps Purple: Rock end-caps Analysis of the precision points at the End-caps Plane8 12 Jan Plane8 alone 16 Dec Top view Side view 10 mm 40 mm 20 mm TT plane End caps survey TOP and Side View

Slice 1 Slice 2 Slice 3 Slice 4 Plane8 alone 12/1 Plane8 alone 16/12 Analysis of the points on the surface of the TT, targets are corrected for their thicknesses 15 mm The central bump is reduced from 30 to about 15 mm but it is still there 27 mm TT plane Surface Analysis Goal:  5mm

Improvement of the TT assembly tools better rigidity of the mechanical structure tooling for controling the positioning of the modules online measurement with the automatic teodolite Installed and tested next week (April 11 th )

Improvement of TT plane assembly Install wires or ribbons to transfer homogeneously the load of the horizontal modules to the yellow flat beam to avoid stresses induced into the TT plane Full test next week ( April 11 th )

Improving TT planes hanging system Linking the yellow flat beam of each TT plane to the reference structure in order to keep it flat inside the target Tested next week

Wall horizontal: (7+1) x = 52 Wall vertical: (9 +1) x = bricks 9/12-15/12 Now better grid (79 bricks 14/1/05) Brick Wall Survey

Kink seen with the 79 fake bricks 4 mm 2 mm Top view of the Brick Wall

SW1SW2 Offset of 3600 mm subtracted, nominal 3650, magnet positive, bottom rails system Wall 1 after realignment 7/3 (forcing on turnbuckles+ bottom regulations, origin of the kink not yet understood) Top and Bottom are aligned (by forcing the top) but there is a bump at the middle

SW1SW Wall 1 aligned on the 22nd of March by skipping one slot from TT7 (no more pressure from TT7) Differences with respect to the nominal position Just the alignement of the bottom I beams is enough to get the entire wall aligned !

Magnetic targets on the ribbons TOP View Beam Wall 0.8 mm 1 mm 30/3 All the non planarity effects are within 1 mm !!! Cross

Side View ribbons wall cross MagnetBeam Borexino 0.6 mm Small sagitta (0.6 mm) in the direction of The magnet (opposite to the one with TT7 pushing) bottom top

The Two-floor hypothesis Access to this platform by stair- cases & Lift