EFRTC General Meeting INNOTRACK – Optimising the Supply Chain Summary of Success-Critical Areas Munich, 6 th June, 2008.

Slides:



Advertisements
Similar presentations
European Regions for Innovation in Agriculture, Food and Forestry
Advertisements

The political framework
Prospects of CEFTA. CEFTA SECRETARIAT Objectives CEFTA All commitments and deadlines met Liberalisation of trade in goods Diagonal cumulation.
Evolution of Parametric Analysis within Rolls-Royce Purchasing
Supporting National e-Health Roadmaps WHO-ITU-WB joint effort WSIS C7 e-Health Facilitation Meeting 13 th May 2010 Hani Eskandar ICT Applications, ITU.
[Organisation’s Title] Environmental Management System
Cross-Border Infrastructure: A Toolkit Barriers to Cross-Border Infrastructure Development Session on Regulation & Accountability The views expressed here.
3 rd Executive Forum on Trade Facilitation Paperless Trade in International Supply Chains: Enhancing Efficiency and Security Technology as Enabler of Innovation.
Strategic Alliances in Distribution Chapter 11 with Duane Weaver.
INDUSTRIAL & SYSTEMS ENGINEERING
SECONDARY SPECTRUM TRADING. OPPORTUNITIES AND DIFFICULTIES IN EU Ana Gónzalez David Rojo Claudio Feijóo Sergio Ramos Grupo de Tecnologías de la Información.
Master in Engineering Policy and Management of Technology, 8 th Edition Science, Technology and Innovation Policy GLOBAL STRATEGIES FOR THE DEVELOPMENT.
Defn Jack Ninemeir defines purchasing as "the series of activities designed to obtain products of the right quality and quantity at the right price and.
Corporate Governance: Beyond Compliance at a time of Recession Prof. Ashley G. Frank BA(Econ)[Magna Cum Laude], MDPA (Cum Laude], MBA, MCom [Cum Laude],
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
European Innovation Partnership on Active and Healthy Ageing 07 April 2011 Jorge Pinto Antunes Strategy and Analysis Unit DG SANCO, European Commission.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
OECD Skills Strategy Translating better skills into better economic and social outcomes Israel Accession Seminar November 2011 Deborah Roseveare.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
Purchasing & Storage Management Instructor Abdel Fatah Afifi MA&T, MBA, PCT, ACPA 2 nd Semester 09/10.
1 Directorate of Industry Relations, Analysis and Policy (DIRAP) Paul Herring, Director “CASE FOR CANADIAN DEFENCE INDUSTRIAL POLICY” 27 February 2012.
EFRTC and Czech Technology platform “Interoperability of railway infrastructure” Imrich Korpanec EFRTC Secretary General.
Gzim Ocakoglu European Commission, DG MOVE World Bank Transport Knowledge and Learning Program on Intelligent Transportation Systems (ITS), 24/06/2010.
Logistics and supply chain strategy planning
Policy options and recommendations José Palacín Chief, Innovative Policies Development UNECE Minsk, 19 June 2014.
1.INTERPERSONAL ROLES:- It contains of following:-  FIGURE HEAD:- Executive managers performing a number of ceremonial duties such as representing their.
A new start for the Lisbon Strategy Executive summary Increase and improve investment in Research and Development Facilitate innovation,
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Brazil-Japan: Roadmap for an Economic Partnership Agreement Keidanren
1 Public Procurement of Innovations a driver for future health in Europe - Stockholm, 13 October 2009 Public Procurement Directives supporting innovation.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
Focus of DFID’s Current Research  Identify the market characteristics and determinants of reproductive health commodity supply,  Determine whether and.
PG Funding and Management Strategies Asset Management and task M7 4th meeting Thursday, 19 April 2007 Paris La Défense.
Assessing the Capacity of Statistical Systems Development Data Group.
A new start for the Lisbon Strategy Executive summary Increase and improve investment in Research and Development Facilitate innovation,
ROLE OF INFORMATION IN MANAGING EDUCATION Ensuring appropriate and relevant information is available when needed.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
5. The Purchasing Management Process
Chapter 12 Global Supply Chain Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
Chapter 14 Global Production, Outsourcing and Logistics 1.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
WP1: IP charter Geneva – 23rd June 2009 Contribution from CERN.
Project Portfolio Management Business Priorities Presentation.
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
EFRTC General Meeting Welcome Jo Urlings, President EFRTC Zoetermeer, November 18 th, 2011.
International Business An Asian Perspective
Eversheds Digital Banking Seminar Obtaining the right technology 30 September 2015 Eve England Principal Associate.
The Marine Stewardship Council: A Multi- Stakeholder Fisheries Assessment Programme for Sustainable Fisheries Oluyemisi Oloruntuyi (MSC)
1 © The Delos Partnership 2004 Project Management Executing the Project.
EFRTC General meeting Barcelona, INNOTRACK Innovative Track Systems EFRTC General meeting Barcelona, Dipl.-Ing. Dieter SCHRECK Managing.
An Overview of the Smart Metering Programme in GB.
DEVELOPING THE WORK PLAN
Hollings Manufacturing Extension Partnership MEP Overview 2015.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Reporting on the main discussion points Rapporteur Mr Jan Maarten de Vet, Ecorys High Level Tripartite Strategic Forum on construction 14th April 2016.
ITCILO/ACTRAV COURSE A Capacity Building for Members of Youth Committees on the Youth Employment Crisis in Africa 26 to 30 August 2013 Macro Economic.
Introduction to Sustainable Procurement Principles for Building Efficiency Building Efficiency Accelerator 19 July 2016.
5 OCTOBER 2015 MANILA, PHILIPPINES
Capacity Building Project for Argentina’s Voluntary Peer Review
Sixth Power Plan Setting Conservation Targets and Implementation Strategies Jill Steiner, Snohomish Public Utility District Northwest Power and Conservation.
Vertical Integration and The Scope of the Firm
Marco Polo – Towards a policy revision
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
Vertical Integration and The Scope of the Firm
Railway Conference Pardubice
Industrial Value Chain: A Bridge Towards a Carbon Neutral Europe
Presentation transcript:

EFRTC General Meeting INNOTRACK – Optimising the Supply Chain Summary of Success-Critical Areas Munich, 6 th June, 2008

C:\Documents and Settings\tobiask\Desktop\ _GM_ ppt© BSL Management Consultants GmbH & Co. KG 2 Six success-critical areas were identified to get the best value from the supply chain A Market-Approach and - Environment B C Contracting Strategies D Rules and Regulations E On-site Logistics, Processes & Technology F Production Resources Utilisation Planning and Funding

C:\Documents and Settings\tobiask\Desktop\ _GM_ ppt© BSL Management Consultants GmbH & Co. KG 3 Six success-critical areas were identified to get the best value from the supply chain (1) A – Market Approach and Environment  Overall strategies of Infrastructure Managers to exploit the market for  Maintenance contracts  Renewal Projects  Clarity on Infrastructure Managers side about make or buydecisions  Current status of market opening and degree of out-contracting  Functioning and competitiveness of markets, handling of market-entry barriers  Exploitation of full-service, system partnership business models  Coordination between Infrastructure Managers and contractors in purchasing and specification of heavy equipment ("avoidance of over-sized, over- specified fleets")  Active supply market development among equipment manufacturers

C:\Documents and Settings\tobiask\Desktop\ _GM_ ppt© BSL Management Consultants GmbH & Co. KG 4 Six success-critical areas were identified to get the best value from the supply chain (2) B – Contracting Strategies  Current contracting mechanisms (such as "cost-plus", "ad-hoc") often do not include incentives to increase efficiency  Longer-term, output-oriented contracts are a way to enable contractors to dimension their capacities accordingly and to increase efficiency as a result of a steeper learning curve  Risk allocation and reward sharing is a major area of concern, which can be tackled and improved appropriate contracting strategies  Formal, complex and sometimes unrealistic short tender procedures drive cost into the supply chain  Communication between the contracting parties can be improved so that the scope of work and the risk allocation is facilitated ("open partnership in competition")  The fostering of innovations needs an appropriate sharing of benefits between Infrastructure Managers and contractors

C:\Documents and Settings\tobiask\Desktop\ _GM_ ppt© BSL Management Consultants GmbH & Co. KG 5 Six success-critical areas were identified to get the best value from the supply chain (3) C – Planning and Funding  Long term planning is fundamental for contractors and Infrastructure Managers to dimension their capacity to the anticipated market needs (avoidance of often over- dimensioned fleets)  In a back-to-back approach Infrastructure Managers need long term funding commitments from governments ("Planning stability is at the heart of efficient processes")  Long term planning needs to be translated into dependable mid term work programming with a view to  consistent sequencing (over time and geographically) of work (see box 'E' and 'F')  coordination of activities, bundling and  "a clockwork" approach to worksite logistics and work execution (mutual programme management)  Careful attention to detail in planning process and optimisation of the supply chain interface with contractors, including project risk analysis. Crucial to avoid surprises ("Money wasted in early decision-making can never be recovered later")

C:\Documents and Settings\tobiask\Desktop\ _GM_ ppt© BSL Management Consultants GmbH & Co. KG 6 Six success-critical areas were identified to get the best value from the supply chain (4) D – Rules and Regulations  The differing rules and regulations across Europe are a key entry barrier for contractors to market their services internationally  A cross-acceptance of certifications for machinery (technical and process) and for innovations would enhance competition and ensure that efficiency gains are rolled-out more easily  Market opening also positively effect current over-capacity  Sometimes very rigid rules for worksite protection and logistics can have a very substantial impact on productivity.  A harmonisation of rules and standards based on 'good practice' would lead to a simplification and added-value  A long certification process furthermore is an obstacle to innovations

C:\Documents and Settings\tobiask\Desktop\ _GM_ ppt© BSL Management Consultants GmbH & Co. KG 7 Six success-critical areas were identified to get the best value from the supply chain (5) E – On-site Logistics, Processes & Technology  The output during track possessions ("time-on-tools") can be improved by processes and technology.  Minimum disturbance strategies are more and more required and developed in some countries  Innovation-friendly framework has additional potential to improve process efficiency  The cost for moving equipment (logistics) is often very high, it consumes considerable time, often as a consequence of improper planning  Maintenance and renewal work is often carried by various parties (e.g. staff of the infrastructure manager for worksite protection, contractor's staff for work execution)  That increases the number of interfaces and the effort required for coordinating work (elimination of synergies, process perturbations)  Due to the fragmentation of work the contractors can not sufficiently influence the overall efficiency of the project

C:\Documents and Settings\tobiask\Desktop\ _GM_ ppt© BSL Management Consultants GmbH & Co. KG 8 Six success-critical areas were identified to get the best value from the supply chain (6) F – Production Resources Utilisation  Understanding of basic economics of resource deployment (machinery and staff) is fundamental to the optimisation of the supply chain  Infrastructure Managers approach is key to create a cost efficient framework, primarily by  mid term planning and work programming  consistent sequencing of work  logistics and execution dependability  The fundamental building blocks for good economics of resource deployment with a substantial impact on unit cost are  plant and staff deployment during track possessions  well programmed project pipeline and sequencing of plant and staff deployment (logistics from work-site to work-site)  the objective of an even workload distribution over the year