Meteorological Monitoring Supporting Maintenance Activities Robert F. Yewdall PSEG Nuclear LLC NUMUG Oct 2003 Chattanooga, TN.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Checking & Corrective Action
1 Joint Commission for Environmental Cooperation and U.S./Mexico Border 2012 Collection and Storage of SLABs December 4, 2007.
Clinical QA Data Audits A GCP Point of View Linda Del Paggio GCP Compliance BioBridges, LLC.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
World Health Organization
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
Lessons Learned from Guy Wire and Anchor Replacement at Sequoyah Nuclear Plant by Doyle Pittman 12th NUMUG Meeting
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Gauges and well logging
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
5.2 Personnel Use competent staff Supervise as necessary
BUILD WITH US. ™ Contractors
The Maintenance and Engineering Organization
The Challenges and Lessons Learned Related to the Qualification, Selection and Monitoring of Site Contractors Tom Mudge 31st Energy & Environmental Conference.
Wireless Fundamentals Lesson 2: Implementing A New Wireless System Bellevue Community College Bob Young, Instructor.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
FIND IT BEFORE THE AUDITOR DOES! Marlene Lynn, CPPM Manager of Asset Management, BAE Systems Electronic Solutions July 25, 2011.
1 Digital I&C Systems Configuration Management Presented By: David E Woods Senior Engineer – Electrical/I&C Design Engineering June 21, 2011.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Important informations
Material Adopted From: “The Internal Auditing Pocket Guide” --- J.P. Russell.
Meteorological Program Self Assessment Presented at NUMUG San Francisco, CA 2009.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Aviation Maintenance Management
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Continuing Analysis and Surveillance System (CASS) 03/06/59 1 AIRCRAFT MAINTENANCE Section 10.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Basic Principles of GMP
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Cargo Strategic Action Plan Prepared by: Cargo Strategic Action Group Air Carrier Maintenance Branch, AFS-330.
MNM Fatal Machinery Accident Machinery Accident December 15, 2011 (Pennsylvania) December 15, 2011 (Pennsylvania) Crushed Stone Operation Crushed.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
Utility Engineers, PC.  Generation  Transmission  Distribution.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Electrical Safety, Subpart K
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
(AFTER-THE-FACT ORDERS) Confirming Orders. Purchasing Policies Use of confirming Requisitions and Purchase Orders without an approved University payment.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Internship Saudi Aramco Security System Maintenance Division
We always have time to work safely
Operations Update Report
Maintaining Safety Standards
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Maintaining Safety Standards
Ageing Management Session Name: Principles of Ageing Management
Construction Safety Council Breaking New Ground February 7, 2001
Regulatory Oversight of HOF in Finland
Elements of Effective Signal Maintenance
Receiving Inspection on incoming goods
Trending Requirements and Results
Quality Assurance in Clinical Trials
Aerodrome Certification Workshop
Presentation transcript:

Meteorological Monitoring Supporting Maintenance Activities Robert F. Yewdall PSEG Nuclear LLC NUMUG Oct 2003 Chattanooga, TN

Background Maintenance of meteorological instrument and data acquisition/ display systems generally receive adequate attentions. This portion of the monitoring systems is implemented by approved/ controlled processes and procedures. In addition, inspections and audits performed by regulatory oversight organizations and internal audits (QA and self-assessment) assure satisfactory instrument performance. However, supporting maintenance activities with respect to structures (towers, instrument building and site areas) may not receive the same level of attention as the meteorological instruments

Safety Issues Lack of adequate maintenance may lead not only to degraded meteorological system performance but also to unsafe conditions. Increasingly, may meteorological towers have become dual function structures supporting radios, microwave, cellular telephone equipment. This leads to additional burden on maintenance support organizations.

Other Programs & Systems Organizational Responsibilities Intra-department cooperation Planning & Scheduling Budgeting For PM & CM

Ownership Maintaining items such as: HVAC, cathodic protection, lightning protection, UPS systems, security fencing, guy wire and anchors inspections, power and instrument wiring and conduit inspections, vegetation control, FAA warning lights and structural reviews of the tower are extremely important. In many cases there are no owners of these activities or they have become orphaned due to organizational changes or program cutbacks. Necessary resources attention and budgeting may be lacking in organizations and directly contribute to inadequate maintenance.

Checking What ? Surveillance Checks Operability Checks Functional Checks Safety – Hazard Checks

PM – CM – Corrective Action Preventative Maintenance Activities Corrective Maintenance Corrective Action Problem Identification Cause (Apparent Cause, Root Cause, etc.) Resolution Documentation

Questionnaire Meteorological Monitoring System Maintenance Questionnaire – Non-Instrument I.How often are the following non-instrument maintenance activities performed? 1. Guy wire tension checks (if not free standing) _____________________________________ 2. Inspections of guy wire anchors & hardware ______________________________________ 3. Tower structural reviews – including climbing apparatus ____________________________ 4. Instrument and electrical conduit/ wiring _________________________________________ 5. Tower junction boxes (including heaters, seals etc.)_________________________________ 6. Tower warning lighting (beacon, strobe etc.) ______________________________________ 7. Tower painting _____________________________________________________________ 8. Grounding system (including cathode protection) __________________________________ 9. Lightning protection__________________________________________________________ 10. Instrument building PMs (i.e., painting, penetration seals, etc.,) _______________________ 11. Backup power (batteries, generators) ____________________________________________ 12. Security fencing ____________________________________________________________ 13. HVAC ____________________________________________________________________

Questionnaire – cont. II.Is the same organization that is responsible for instruments (calibrations, maintenance & repair, surveillance data collection) the department responsible for these maintenance activities? 1. If no, what organizational department is responsible? (i.e., maintenance, yard departments, contractors)? 2. If yes, which activities? 3. Are material resources (paint, new guy wires, tower/shelter hardware etc.) budgeted as I&C expenses III.What process or protocols do you have in place (or utilize) to ensure that physical problems associated with meteorological related structures, and/or grounds are corrected expeditiously?

Recent Problem NUMUG Listserver Question – Sept. 2, 2003 We are bringing in a tower vendor tomorrow to inspect our guy wire anchors and our tower.If the guy wires are showing any sign of degradation, the vendor will not climb the tower. I was wondering if anyone has had experience with finding degraded conditions? What affect did it have on the operability of the tower? Were plant personnel allowed to perform surveillances or instrument calibrations prior to repairing the condition?