Vincent MASSAUT 10/10/2006 1 EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.

Slides:



Advertisements
Similar presentations
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Garching, 10 Nov.2006TW6-TSS-SEA 2.1 I. CristescuSlide1 HVT-TLK FZK - EURATOM ASSOCIATION Occupational.
Advertisements

TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Application of cavitation jet technique to operating nuclear power plant September,12.
Options for Disposal of Active Material Dr. Brian Heaton Aberdeen Radiation Protection Services Ltd.
Production planning An Introduction to CoSHH (Control of Substances Hazardous to Health Regulations,2004)
An Introduction to CoSHH
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Credited Controls at C-AD Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Kick off meeting EFDA Task TW6-TSS-SEA2.1 Garching 10th/10/2006 ENEA Engineering approach of the potential accident scenario leading to the worst release.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
Fusion Power Plant Licensing and Waste Management by Antonio Natalizio for Presentation at the 9 th Course on Technology of Fusion Reactors at Erice (Monastero.
Physics of fusion power
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Physics of fusion power Lecture 8 : The tokamak continued.
Seminar: Safety in Nuclear Fusion Plants - La Sapienza University (Rome) – 24 April 2015 Design Basis Accidents (DBA) M. T. Porfiri – ENEA UTFUS-TECN (Frascati)
Seminar: Safety in Nuclear Fusion Plants - La Sapienza University (Rome) – 24 April 2015 Occupational Safety Assessment M. T. Porfiri – ENEA UTFUS-TECN.
Protection Against Occupational Exposure
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Radiological Hazards Instructional Goal To help you understand the potential health hazards of radioactive sources that could be associated with a hazardous.
ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
ANALYTICAL X-RAY SAFETY User Training Centre for Environmental Health, Safety and Security Management.
Index: Status report ENEA tasks (Dec 2005) EFDA Task TW4 TSS SEA slides 2,3,4 EFDA Task TW5 TSS SEA slides.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Vincent MASSAUT Meeting 28/03/ Meeting on Revision of the Occupational Radiation Exposure assessment for the Port-Interfacing Systems (WBS5.0) Garching.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC,
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
PLANT DESIGN.
A guide to… Maintenance Safety. Aim There is a legal requirement for regular and effective maintenance, inspection and testing of work equipment. This.
Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.
MHI PROPRIETARY : CLASS B All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Tungsten balls charge method radiation shield system.
Tungsten Calorimeter Model Calculations and Radiation Issues Pavel Degtiarenko Radiation Control Group, Jefferson Lab.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Revision of the ORE assessment for the Port-Interfacing Systems Garching – 25th April 2006 Comment on the main received comments EFDA Task TW4 TSS SEA2.1.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 24.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Procedure Writing ALARA Radiological Safety and Response RPT-243-PE-2.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Fusion Technology - Safety & Environment Via E. Fermi 45, I-00044, Frascati (Rome), Italy ENTE PER LE NUOVE TECNOLOGIE,
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
Modelling noble gases Radiation Protection of the Environment (Environment Agency Course, July 2015)
Workshop EU Fusion Roadmap April 13-15, 2011, Garching, Objective 1 STAC AHG Report on Objective 1: ITER construction Workshop EU Fusion Roadmap, April.
B WEYSSOW 2009 Coordinated research activities under European Fusion Development Agreement (addressing fuelling) Boris Weyssow EFDA-CSU Garching ITPA 2009.
Vincent MASSAUT 24/10/ of ? slides Final meeting tasks TW5-TSW-001, -001B, -002 Recycling issues Introduction V. Massaut October 2006 UKAEA,
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK,
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
Vincent MASSAUT Meeting 28/03/ Meeting on ITER water chemistry and implication on the PACTITER development / CORELE experiments Garching / Cadarache.
1 TW6-TSW-003 Kick off meeting EFDA Garching October 9 th, Kick off meeting TW6-TSW-003-D1 Watching activities: Study and analysis of detritiation.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Technical Services.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
 Welcome & introduction  Health & safety  Mobile ‘phones  Agenda.
Revision of ORE assessment for port-interfacing systems – Garching, Comments from EFDA Physics Integration 1 Main recommendations Comments from.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Technical Services. Objectives To identify the technical services needed within the infrastructure for an effective implementation of regulatory programme.
1 Assessment of previous ORE evaluation by comparison with 3D exposure analysis. Analysis of the main difference contributors and optimisation of the calculation.
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Vincent MASSAUT SCK•CEN and EFDA
ALARA Programs & Occupational Dose Trend in Wolsong NPP
The Success of the ALARA Principle – the View of an Inspector
Flooding Walkdown Guidance
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
Presentation transcript:

Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006 Introduction V. Massaut

Vincent MASSAUT 10/10/ The Occupational Radiation Exposure (ORE) is an important safety factor for ITER and fusion plants in general Rather large amount of highly activated materialsRather large amount of highly activated materials Presence of dust, activated corrosion productPresence of dust, activated corrosion product Internal contamination hazard (tritium, dust)Internal contamination hazard (tritium, dust) Important replacement/refurbishment frequency of in- vessel componentsImportant replacement/refurbishment frequency of in- vessel components These aspects can be tackled adequately by careful design, use of Remote Handling (RH) systems and ad hoc maintenance proceduresThese aspects can be tackled adequately by careful design, use of Remote Handling (RH) systems and ad hoc maintenance procedures This is e.g. the case for the Neutral Beam Injector (NBI) systemThis is e.g. the case for the Neutral Beam Injector (NBI) system

Vincent MASSAUT 10/10/ At the beginning this EFDA task was devoted to an assessment and review of ITER ORE evaluation But following a request from ITER IT, there was a need to re-assess the occupational safety of operators concerned with the maintenance of the NBI systems, as the system design has been reviewed mostly for occupational purposes.But following a request from ITER IT, there was a need to re-assess the occupational safety of operators concerned with the maintenance of the NBI systems, as the system design has been reviewed mostly for occupational purposes. The task is thus divided in two parts:The task is thus divided in two parts: –Assessment of ORE for ITER –Review of occupational safety for the maintenance of the (new design) NBI cell

Vincent MASSAUT 10/10/ For the assessment of occupational exposure evaluation The evaluation of the operators occupational exposure was made up to now using rather rough estimates of dose rates, averaged over entire rooms and locations.The evaluation of the operators occupational exposure was made up to now using rather rough estimates of dose rates, averaged over entire rooms and locations. In order to assess the outcomes of these studies, a comparison for one specific location and operation with more refined 3D exposure analyses would allow to define if these first evaluation were sufficiently conservative or if further 3D analyses should be required for the main dose commitments contributions.In order to assess the outcomes of these studies, a comparison for one specific location and operation with more refined 3D exposure analyses would allow to define if these first evaluation were sufficiently conservative or if further 3D analyses should be required for the main dose commitments contributions.

Vincent MASSAUT 10/10/ Maintenance operations and exposure limitations have lead to analyse important design changes in the Neutral Beam Injector cell and design It is now important to know what would be the implications for the occupational exposure, internal (airborne contamination) as external (radiation exposure). Therefore the following aspects should be studied:It is now important to know what would be the implications for the occupational exposure, internal (airborne contamination) as external (radiation exposure). Therefore the following aspects should be studied: –1.-Total amount of T flow rate coming from the maintenance operations. Capacity of the ventilation system to achieve T concentration suitable for human presence in suits or without.(del.3) –2.- Expected time evolution of the T concentration airborne and order of magnitude of the surface contamination.(del.4) –3.- Basis for the assessment of the need of a specific containment for the NB cell.(del.5) –4.- Assessment of the possible decontamination procedures.(del.6) –5.- External Occupational Radiation Exposure.(del.7)

Vincent MASSAUT 10/10/ Task sheet

Vincent MASSAUT 10/10/ Occupational radiation exposure: present evaluation for ITER Some areas need to be evaluated more precisely but the margin to target (500 p-mSv/y) remains acceptable HC&WT = Hot Cells & Waste Treatment LH&CD = Lower Hybrid heating & Current Drive NBI = Neutral Beam Injectors ECH&CD = Electron Cyclotron Heating & Current Drive ICH&CD = Ion Cyclotron Heating & Current Drive VP&LDS = Vacuum Pumping & Leak Detection System TCWS = Tokamak Cooling Water System RH = Remote Handling NBI evaluation (~15 mSv/y) should be revisited

Vincent MASSAUT 10/10/ It is also important to demonstrate being ALARA For the concerned operations, it is also important to demonstrate that the dose commitment has been reduced to a level as low as reasonably achievable.For the concerned operations, it is also important to demonstrate that the dose commitment has been reduced to a level as low as reasonably achievable. Therefore, for operations presenting high dose impact, the comparison of various alternative (like e.g. with/without shielding, with/without change of geometry or procedure, etc.) is often very useful.Therefore, for operations presenting high dose impact, the comparison of various alternative (like e.g. with/without shielding, with/without change of geometry or procedure, etc.) is often very useful. Here sensitivity analysis can be useful for pointing out the main actions or operations to improve (on a radiation protection point of view)Here sensitivity analysis can be useful for pointing out the main actions or operations to improve (on a radiation protection point of view)