CALO News Pascal Perret LPC Clermont 26 November 2014.

Slides:



Advertisements
Similar presentations
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Advertisements

Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.
LHCb Simulation Tutorial CERN, 21 st -22 nd February B 00 l e How to pass a detector geometry to.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter Status: Preparing RUN II & LS2 Pascal Perret LPC Clermont 24 February 2015.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
PS/SPD VFE Electronics Boxes Repairs Philippe Jacquet, Pascal Perret, Guy Reinmuth LPC Clermont 23 October 2007.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
Ken Wyllie, CERN LHCb power supplies, 19th May Does each sub-detector have enough power supplies for the upgrade???? If not, do they need: More.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
Calorimeter Status: Preparing RUN II Pascal Perret LPC Clermont 25 February 2014.
Calorimeter and its Upgrade Pascal Perret LPC Clermont 8 December 2015 OUTLINE  Detector status  Calibration  Upgrade.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
CALO News Pascal Perret LPC Clermont 23 October 2011.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
CALO News Pascal Perret LPC Clermont 22 January 2012.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
Pelletron status update Main Injector Departmental Meeting November 11 th, 2009 L. Prost.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Technical Coordination Parallel Session November 2011, FNAL
The LHCb Installation Story
RICH Status from last RICH meeting
ITS Cooling: Xmas Plan Claudio Bortolin.
Preparation of LHCb for data taking
SPS EN-CV Planning LS (initial draft)
LHCb & EYETS
Calorimeter Upgrade Meeting - News
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

CALO News Pascal Perret LPC Clermont 26 November 2014

2 LS1 Activities: LHCb LHCb closure week CV shutdown: weeks 48, 49 and 50 CV maintenance P8 No cooling on Nov 24, kW from 26/11 RICH HPD replacement: Jan 2015 Pascal Perret - LPC Clermont 26/11/ Beam Pipe Installation ECAL CALIB system – fibers replacement Week 26 : operation week #7 RICH HPD replacement Week 19 operation week #6 AUG 12/5 AUG 12/5 W33 B-field measurement CV maintenance 2014 DSO test CV maintenance 2014 W 47 Sector test p8 W31 Neon In LHCb CLOSURE Dipole test w19 Week 36 : operation week #8 Week 42 : operation week #9 Pump down

3 Planning 2015 Q1-Q2  Next: One commissioning week end of Jan./beginning of Feb. t.b.s. Sector test 78 last week of February weeks commissioning/heat run before beam Piquet: reduced level w11 – 17; Full level week 18 - Pascal Perret - LPC Clermont 26/11/2014

4 LS1 Activities  CALO closure Passive dosimeter installation done SPD ECAL HCAL Pascal Perret - LPC Clermont 26/11/2014

5 LS1 Activities  CALO closure Preparation: Check of electrical control system performed by Laurent B. A bad contact identified in a connector … but it was ok! But problems time to time … (system not very reliable!) Cleaning of vis à bille done by Bruno et al. Problems during ECAL opening: « dust » preventing to open ECAL! Pascal Perret - LPC Clermont 26/11/2014 BeforeAfter

6 LS1 Activities  CALO closure Nov 4, 6: SPD, Lead, PS and on 13 th : ECAL & HCAL Pascal Perret - LPC Clermont 26/11/2014

7 LS1 Activities Pascal Perret - LPC Clermont 26/11/2014 Adjusting End Switch position Adjusting End Switch position A-sideC-side SPD+12mm-6mm PS=+6mm ECAL+5mm= PS-SPD(was) A-side-2.5 mm(12.8mm) C-side+1.5 mm(8.1 mm) Δx ECAL A ( ) ~ 3 mm  CALO closure Nov 4, 6: SPD, Lead, PS Adjustment of closing position A-side: ECAL & SPD on PS closed position ECAL end switch adjusted… C-side: PS & SPD on ECAL closed position PS end switch adjusted… Survey: PS&SPD: Nov 5, 11 ECAL: Nov 14

8 Without beam pipe protection 6/11/ PS SPD IP C-side A-side IP C A 6.0 IP C A IP C A 7.8

9 Without beam pipe protection 6/11/14 Lea d IP C A

10 TED RUN  Preparation hctell04 replaced The Tell1 125 has been replaced by te tell1 117 (1-ORx). The problem of 125 is PP3 lbus: ====== LBit 20 of PP3_lbus_data (DAQL_data bit 4) seems to be bad! The whole lbus (including control signals) seems to be bad! Pascal Perret - LPC Clermont 26/11/2014

11 TED RUN Pascal Perret - LPC Clermont 26/11/2014

12 TED RUN  Or higher intensity during a short period … Pascal Perret - LPC Clermont 26/11/2014

13 TED RUN  Smooth running TAE Pascal Perret - LPC Clermont 26/11/2014

14 TED RUN  2 points to look at PS 1FE/VFE/MAPMT ? To check with cosmics data ECAL ERROR bank? Pascal Perret - LPC Clermont 26/11/2014

15 LS1 Activities: LHCb  Maintenance MARATON water cooling circuit All done! The Maraton we gave to the e-pool to check connectors is back New water connectors The old one have been analysed (no news yet!) Actions to be discussed for the whole LHCb Maraton …  New SPECS: First tests done by Clara on ECHVA/C tomorrow. Is it ok?  To do: Calibration: cf Jean-François report We have to define our needs in terms of memory use, CPU time per events, etc. to discuss with online team Piquet training & DOCUMENTATION Pascal Perret - LPC Clermont 26/11/2014