1 Northern Hub – the business case Duncan Law 26 June 2012.

Slides:



Advertisements
Similar presentations
Eddingtons implications for transport funding Dr Adam Marshall Head of Policy, Centre for Cities National Transport Conference, 16 Oct 07.
Advertisements

Adapting the city. Building & Infrastructure David Hytch Information Systems Director, Transport for Greater Manchester.
Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
The Midlands LEPs Growth Strategies David Jarvis & Jennifer Ferreira 20th June 2014.
Base Birmingham Connected Transport Tom Magrath Director of Strategy and Policy Centro.
Economic Geography, Linkages and Low Carbon Economy Business Geographies and Linkages John McCreadie – 6 th July 2010.
Delivering Growth Beyond the Cities Cllr Simon Henig, Leader of Durham County Council and Chair of North East Combined Authority 19 March 2015.
A Green Infrastructure Strategy for Rochdale MBC.
The independent campaign for a better bigger railway.
HS2 in Sheffield The impacts David Redfern. HS2 in Sheffield: the impacts The HS2 station at Meadowhall The proposed site for the new HS2 station in Sheffield.
Priorities for Rail Investment in the East Midlands Andrew Pritchard Director of Policy & Infrastructure February 2012.
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
Strategic Transport Infrastructure for South East England
Liverpool Hope. The Potential of Atlantic Gateway ‘If anywhere in the UK can develop the critical mass and momentum to become an alternative growth pole.
TfGM, the Rail Industry and the (promising) future Roy Chapman Rail Services Planning Officer Presentation to Greater Manchester Transport Campaign 3 May.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
25th November 2014 PTRC London 1 Jim Steer Director Greengauge 21 Director HSR Industry Leaders HS2 – more than a railway HS2: Building in the benefits.
 A high speed rail link from London to Yorkshire  Phase 1 is from London to Birmingham  Phase 2 is to Manchester and Leeds  The Institute of Economic.
Key Transport Policy Issues for 2010 Stephen Clark Deputy Clerk to the Authority 18 January 2010.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Sustainable travel for Limerick and Area By Professor Lewis Lesley.
Greater Manchester Strategy Rebecca Heron and Rod Fawcett GM Integrated Support Team 12 April 2013.
Action for business, by business Action For Business – Tameside Friday 30 th November 2012.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
CHESHIRE & WARRINGTON SUBREGIONAL TRANSPORT STRATEGY Delivering & Sustaining a £35bn Economy.
Transport & Economic Growth Vibrant Cities - Private Sector View Nick Green Squire Sanders Hammonds.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Crossrail 2 London Assembly Regeneration Committee.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
Manchester Airport and the Northern Powerhouse April
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
Lancashire Business Park Supporting information January 2015.
High Speed Two Ltd responsible for developing and promoting the UK’s new high speed rail network
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.
 The 20 Year Plan for the SW Peninsula Rail Network Philip Heseltine Head of Transport, Infrastructure and Investment, Plymouth City Council On behalf.
Scotland Route Utilisation Strategy. Slide 2 What is a RUS? A blueprint for the future of the route  Provides a series of options that funders may choose.
TfN Freight & Logistics Strategy Chris Rowland Freight in the City Conference, Manchester, 3 March 2016 C Rowland MDST presentation.
TfN Freight AND RAIL UPDATE
Rail North Manchester Airport Transport Forum
MetroWest Phase 2 LGA PT Consortium Visit 7th September 2017
West of England Joint Transport Study
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
DFT Study: Future Potential for Modal Shift in the UK Rail Market
TAITH NORTH WALES REGIONAL TRANSPORT STRATEGY
Midlands Connect: A Pan Midlands Strategic Transport Partnership
A future benefit for the South Cheshire infrastructure
Peter Molyneux Transport for the North.
Great Western Railway GWR’s Rail Vision and Community Rail
A future benefit for the South Cheshire infrastructure
Delivering East West Rail
Highways UK Conference Liz Hunter West Yorkshire Combined Authority
East Coast Route Study November 2016 update.
KEYNOTE STAGE SPONSOR.
East Sussex Strategic Partnership Transport Update 20 March 2019
Head of Strategic Planning
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
Trans Wilts Conference
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

1 Northern Hub – the business case Duncan Law 26 June 2012

2 Why invest in rail – a reminder

3 The economics 1.Within city regions 2.Between city regions 3.To access international gateways ECONOMIC GROWTH Adequate capacity Reliable journeys Reasonable journey times

4 Constraints in meeting service aspirations Options for resolving constraints Service specification for new infrastructure Value of new specification Identification of economic outputs The economics – key corridors Identify the economic gap Compare the North GVA per capita to London & South East Identify how rail can contribute Connecting business Labour to jobs Moving goods

5 The economics – key corridors Timetable-driven passenger service benefit per unit Generalised Journey Time (GJT) improvement Crowding benefits per incremental AM peak seat Freight benefits per incremental freight path to Trafford Park.

6 Constraints in meeting service aspirations Options for resolving constraints Service specification for new infrastructure Value of new specification Identification of economic outputs The economics – analysis WEBTAG Revenue Value of time Non user benefits Crowding WEBS Agglomeration Labour supply Imperfect competition

7 The economics – analysis

8 Constraints in meeting service aspirations Options for resolving constraints Service specification for new infrastructure Value of new specification Identification of economic outputs The economics – Conditional outputs 1. Capacity and Flexibility 2. Carbon Reduction 3. Performance 4. Journey Times 5. Growth Centres in Greater Manchester 6. Connectivity to Deliver Economic Benefits 7. Manchester Airport 8. Trans Pennine 9. North South Links and High Speed Rail 10. Freight

9 Delivering faster, more frequent services

10

11 Funding for Northern Hub - Ordsall Chord

12 Further funding for Northern Hub

13 The evolution of the programme SERVICE OUTPUTSBUSINESS CASE INTERVENTIONS

14 HS2 and the Northern Hub

15 Manchester Victoria: before…..

16 ….and after

17 Electrifying across the North West… Phase 3 Phase 2aPhase 1 Phase 2b Phase 4

18 …and across the Trans-Pennine route Micklefield Junction Heaton Lodge Junction Copley Hill East Junction Colton Junction HUDDERSFIELD LEEDS STALYBRIDGE GUIDE BRIDGE MANCHESTER VICTORIA Mirfield East Junction Neville Hill Depot CORE ROUTE TO BE ELECTRIFIED EXISTING ELECTRIFIED EXISTING NON-ELECTRIFIED TRANS PENNINE ELECTRIFICATION CORE ROUTE ECML Ashburys West Junction Phillips Park Junction

19 Summary CP4 Northern Hub North West Electrification CP5 renewal and enhancement portfolio HS2 SERVICE OUTPUTSBUSINESS CASE INTERVENTIONS

20 Next steps HLOS summer