Kick-off meeting, CERN, 2-Oct-08 M. Letheren 1 ACEOLE Marie Curie Initial Training Network Data Acquisition, Electronics and Optoelectronics for LHC Experiments.

Slides:



Advertisements
Similar presentations
Florent Bernard, PhD DG Research European Commission “People” Programme : The Marie Curie Actions in FP7.
Advertisements

Marie Curie Actions at CERN
Development of a DC/DC converter for low voltage power distribution in LHC upgrades. Stefano Michelis Supervisor: Federico Faccio ELACCO mid-term review.
1 Joint research training program for career development (research & complementary skills such as communication, industrial strategy, IPR, ethics, grant.
Slide 1 ACEOLE Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator ACEOLE kick-off meeting CERN 2 October.
Slide 1 CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
ESCAPE-15, 31 May 2005 Postgraduate Training and Research in PSE/CAPE through the European Marie Curie Programme Michael Georgiadis Imperial College London,
PROPHET Postgraduate Research on Photonics as an Enabling Technology 0.
The Preparatory Phase Proposal a first draft to be discussed.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
VGI RISK WORKSHOP FINANCIAL ISSUES OF EU FUNDING.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Robert McLaren CERN 25 th February 2009www.cern.ch/aceole/meetings This started as a one slide presentation: Messages from Brussels and finance info But....
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Work Package 2: ASIC building blocks for SLHC ACEOLE Twelve Month Meeting 1 st October 2009 CERN – Geneva, Switzerland Paulo Moreira.
M. Silari - The ARDENT ITN project 1EURADOS, Vienna, 7-10 February 2012 ARDENT February 2012 – January 2016 Advanced Radiation Dosimetry European Network.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Work Package 5 Data Acquisition and High Level Triggering System Jean-Christophe Garnier 3/08/2010.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project 15 TH SEPTEMBER 2012 This research project has been supported by a Marie.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Slide 1 ACEOLE Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator ACEOLE kick-off meeting CERN 2 October 2008.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ACEOLE Review Early Stage Researcher, WP5 Dan Octavian SAVU.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Ioannis.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
19 November ITN = Initial Training Networks ITN is an FP7 Marie Curie “host-driven” action. European Commission has issued a new call (Call 3) for.
Testability of Analogue Macrocells Embedded in System-on-Chip Workshop on the Testing of High Resolution Mixed Signal Interfaces Held in conjunction with.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Background Overview of the work Secondments, conferences.
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
Consortium building PHOENIX Training Course Laulasmaa, Estonia
CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI General Meeting CERN 14 November 2011.
Characterization of Semiconductor Lasers for Radiation Hard High Speed Transceivers Sérgio Silva, Luís Amaral, Stephane Detraz, Paulo Moreira, Spyridon.
EventsDuration of event (days) Dates (months after start) DeliverablesExternal participation (researcher-days, rd), total = 450 rd Kick-off meeting1m1-m2Protocol0.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Overview of the PicoSEC Project Etiennette Auffray, Network Coordinator CERN PH-CMX.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
CERN 1st October 2009www.cern.ch/aceole/meetings ACEOLE: WP6 From Annex I: “Work package 6 covers research contributions, transfer of knowledge and planning.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 The agenda Coordinator's Welcome 09:05.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Slide 1 CATHI Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ACEOLE WP4 Optical Transmission Systems.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Myself Training Technical Dissemination Impact.
11 Apr The Versatile Link Project CERN CERN Jan Troska, Francois Vasey, et al. Jan Troska, Francois Vasey, et al. Oxford Oxford.
WP5 1 year activity report Niko Neufeld CERN/PH. WP5 (people)  6 ESRs working in ALICE, ATLAS, CMS and LHCb  Adriana Telesca  Luca Magnoni, Dan Octavian.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
CERN 1sr October 2009www.cern.ch/aceole/meetings ACEOLE: Twelve Month Meeting  Welcome, news of upcoming events, EC related events  Reports from Work.
WPO – ITN management & HR Seamus Hegarty HR-RPM 12-month review,
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 ASIC Building Blocks for SLHC ACEOLE Mid Term.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Mid-term review presentation 3rd August 2010 Spyridon.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Final CALICE OsC meeting: Status and summary of project
CERN R&D plans and Infrastructures
ACEOLE WP4 Status Report
Marie Curie Research Training Networks Mid-Term Review Meeting
Work Package 5: Data Acquisition
Mid-term review presentation 3rd August 2010
AMICI WP1 – Management, coordination and dissemination
Presentation transcript:

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 1 ACEOLE Marie Curie Initial Training Network Data Acquisition, Electronics and Optoelectronics for LHC Experiments MILESTONES AND DELIVERABLES (as defined in Annex I, the Description of Work, appended to the Grant Agreement)

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 2 OVERVIEW History Grant Agreement Initial Training Network ACEOLE research work packages ACEOLE deliverables and milestones Training Working together

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 3 HISTORY of Marie Curie training projects at CERN (1/2) –A variety of Marie Curie actions at CERN Coordinated by CERN Marie Curie Steering Committee (MCSC) 6 Early Stage Training Projects 8 Other Marie Curie actions (RTN, Cofunding, individual fellowships…..) 89 Researchers 2M € training budget (not including living costs etc) –Two FP6 forerunners to ACEOLE: MITELCO (Microelectronics, Telecommunication & Controls Developments for expts) »Feb Jan 2009 »11 ESTs over 4 years ELACCO (Electronics, Acquisition & Controls Developments for Physics Experiments) »Jun May 2010 »13 ESTs over 4 years

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 4 HISTORY of Marie Curie training projects at CERN (2/2) –FP7 Initial Training Networks (ITN) 1st call for proposals 2006 Major differences with FP6 –Network with at least 3 partners –Partners in at least 3 countries –Researcher mobility (mandatory) –Involvement of industry (mandatory) –CERN coordinates 3 ITNs (ACEOLE, MCPAD, PARTNER) ACEOLE (Data Acquisition, Electronics and Optoelectronics for LHC Experiments) »Proposals (submitted May 07 & Sept 07; Kick-off today) »4-year project »Oct Sep »17 Researchers + 12 Visiting Scientists

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 5 ACEOLE PROGRAM OF WORK Grant Agreement, Annex I “Description of Work”: » Contractual commitment; Commission insisted on “Description of Work” identical to approved proposal (Sept. 2007); May need to review and update?

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 6 INITIAL TRAINING NETWORK (ITN) Initial Research Training Early Stage Researchers (ESR) experience < 4 yr Experienced Researchers (ER) 4 yr < experience < 5 yr Visiting Scientists (VS) experience > 5 yr ACEOLE = Monosite ITN CERN (the grant recipient and coordinator) + 9 Associated Partners General ITN Objectives International mobility Intersectorial experience (academia + industry) Complementary skills (language, communication & management, IPR issues etc.) Dissemination of results (workshops etc)

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 7 RESEARCH WORK PACKAGES (integrated into CERN’s approved R&D programme) (S)LHC Subsystem W.P. No. Work Package (Research Training Theme) N o. ESR N o. ER Detector 1 Pixel detector systems for particle tracking (and imaging).11 Electronics & Optoelectronics readout system Radiation-hard ASIC building blocks for detector data readout. Radiation & magnetic field tolerant power management systems for front-end on-detector electronics. Radiation-hard, non-magnetic optical transmission systems for data transfer, timing & trigger distribution, & control functions Data acquisition 5 Data acquisition and high level triggering systems.62 TOTALS =>125

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 8 W.P.1 TASKS & DELIVERABLES (Annex I, B.2.1) Work package number 1Start date or starting event:Month n Work package title Development of pixel detectors Leader Michael Campbell Person-months 54 Associated Partners PANalytical, VTT Espoo Objectives Develop techniques to assemble low cost, low mass, moderate to large area pixel detectors for photon counting X-ray imaging systems and particle tracking at the SLHC. Description of work 1. Development of experiments for tiling large areas with existing pixel detector tiles. 2. Study and evaluate tiling solutions for assembling moderate to large area pixel arrays. Deliverables D11 Report on low cost bump bonding solutions and design of test components D12 Report on the full evaluation programme D13. Report on tiling solutions suitable for HEP and materials analysis D14. Documentation and conference paper on tiling solutions attempted and conclusions

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 9 W.P.2 TASKS & DELIVERABLES (Annex I, B.2.1) Work package number 2Start date or starting event:Month n Work package title ASIC building blocks for SLHC Leader Paulo Moreira Person-months 36 Associated Partners INESC Porto Objectives Develop radiation-tolerant ASIC building blocks in 130nm CMOS technology for detector upgrades at the SLHC. Description of work 1. Establish functional and performance specifications of selected building block(s); 2. Design, fabricate and laboratory test prototype; irradiation testing. 2. Design, fabricate, test final version and carry out system-level integration tests. Deliverables D21.Sign-off specification document for ASIC (IP block) D22Completion of testing and irradiation of prototype ASIC with conference report or journal publication D23Complete testing/irradiation of final ASIC and system-level integration test. Final conference report and/or journal publication

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 10 W.P.3 TASKS & DELIVERABLES (Annex I, B.2.1) Work package number 3Start date or starting event:Month n Work package title On-detector Power Management schemes Leader Jan Kaplon Person-months 36 Associated Partners AGH Krakow Objectives Develop radiation-tolerant ASIC components compatible with efficient power management in SLHC detectors and evaluate them in system level demonstrators. Description of work 1. Design, prototype and lab characterization of selected rad-tolerant ASIC block. 2. Evaluate its performance in the radiation environment expected at SLHC trackers. 3. Integrate ASIC block into full ATLAS tracker demonstrator ASIC. 4. Participate in preliminary system tests using the full ATLAS tracker ASIC. Deliverables D31Deliver proto detector module using shunt regulator D32Report or conference paper on performance of shunt regulator in the prototype detector module D33Delivery of full ATLAS SCT readout chip D34Report/conf. paper on test results of detector module incorporating the shunt regulator.

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 11 W.P.4 TASKS & DELIVERABLES (Annex I, B.2.1) Work package number 4Start date or starting event:Month n Work package title Optical transmission systems for SLHC experiments Leader Francois Vasey Person-months 126 Associated Partners INESC Porto, SCK.CEN, UCL, VTT Oulu Objectives Develop radiation-tolerant, low-mass, non-magnetic, high-density, multi-Gigabit/sec optical interconnect solutions for massively parallel data transmission, global clock and trigger distribution, control and monitoring functions in SLHC experiments. Description of work 4.1. Architecture studies, evaluation of PON networks for application in SLHC experiments Characterization of semiconductor lasers (standalone and embedded in optical package) Radiation resistance and reliability; test setups, measurements, analysis, ageing Electro-optical & environmental characterization of optical packages. Deliverables D411 Report on extendibility of PON concept to HEP D412 Conference report on demonstration of PON protocol for HEP application D413 Documentation on hard, soft and firmware, system test results D421 Report on laser electrical impedance measurements and models D422 Report on proposed matching networks, recommendations to designers and experimental results D431 Report on analysis of high fluence test data and proposed methodology D432 Conference report on irradiation tests D433 Conference report on irradiation and reliability tests D441 Report on environmental, EMI and thermal impedance testing D442 Conference report with comparisons between different module types D443 Documentation on hard, soft and firmware, system test results

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 12 W.P.5 TASKS & DELIVERABLES (Annex I, B.2.1) Work package number 5Start date or starting event:Month n Work package title Data Acquisition for (S)LHC experiments Leader Niko Neufeld Person-months 240 Associated Partners Force10, INFN-LNL Objectives Profiling & performance optimization of DAQ networks of the LHC experiments; fault tolerance for the DAQ systems. Evaluation of multi-Gigabit/s technology for DAQ in SLHC Description of work 1. Network ramp-up to full production size; techniques for profiling network performance; optimization of the routed network. 2. Include fault handling in the DAQ systems in order to achieve high data taking efficiency. 3. Optimise the networked data storage system for data reliability and storage virtualization. 4. Studies for DAQ upgrades for SLHC experiments: tracking of networking technology and an R&D effort on constructing an event collection system with multi-Gbps links. Deliverables D51 & D52 Intermediate report/conference papers on network optimization / data storage systems / fault tolerance in run control / design of DAQ for future SLHC upgrade. D53 Prepare final report/conference papers

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 13 W.P.6 - DISSEMINATION OF RESULTS; TRANSFER OF KNOWLEDGE (Annex I, B.2.3) Work package number 6Start date or starting event:Month 0 Work package title Workshops, training courses, dissemination of results & transfer of knowledge Leader ACEOLE Coordinator + Management Committee (+ Researchers) Person-months 15 (visiting scientists) Associated Partners AGH Krakow, Force10, INESC Porto, INFN-LNL, PANalytical, SCK.CEN, UCL, VTT Objectives Promote transfer of knowledge, contribute to S&T & complementary training, and dissemination of results. Description of work 1. Visiting scientists’ contributions to the research work. 2. Plan, prepare and deliver dedicated training courses (by visiting scientists) 3. Organize workshops to promote training and dissemination of results Deliverables 1. Training courses and seminars at CERN as defined in table 8 in section Three workshops on electronics & optoelectronics ( Sept 2009, 2010, 2011) 3. Three DAQ workshops (at CERN and/or in association with CHEP) 4. (Opto)electronics & DAQ sessions at IEEE-NSS (2011) & a project wrap-up workshop.

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 14 EXAMPLE OF TIMESCALE & MILESTONES (see Fig. 1 and Table 5 of Annex I for all WPs; May need updating) 1 Development of pixel detectors D11 Report on low cost bump bonding solutions and design of test components RPublic10 M11Low cost bumping test structure designORestricted16 D12Report on the full evaluation programmeRPublic18 W1n Organize a workshop on pixel detectors (Medipix collaboration related) n.a.12, 24,36 D13Report on tiling solutions suitable for HEP and materials analysisRPublic12 M12Design of various tiling solutionsORestricted24 D14 Documentation and conference paper on tiling solutions attempted and conclusions RPublic36 Theme number Del. no. Titles of the Research Training Themes and description of deliverables and milestones Nature Dissemination level Delivery date (month)

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 15 TRAINING Hands-on research training complemented by formal training: Individual training allowances ( 600 € /month ) CERN Training Programmes »Academic Training »CERN Seminars »CERN Computing School »Technical Training International Conferences »TWEPP, CHEP, IEEE NSS-MIC, IEEE Real-Time……… Training during secondment »Up to 30% of contract duration Complementary Training »CERN Management and Communication courses »Other external training courses

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 16 Training by Visiting Scientists (Annex I, Table 8) Associated Partner Visiting Scientist Visit length (months) W.P. Training topic No. training hours AGH Krakow Senior Physicist (W. Dabrowski) 13 Architectures, performance requirements and limitations to implementing front-end electronics for silicon tracking detectors at the SLHC and/or other relevant topics 10 INESC Porto Senior Engineer (H. Salgado) 24.2 Optical sources (laser diodes, EOM, EAM); Device characterization & fibre optic measurement techniques. Extraction of laser diode parameters. S-parameters/ network analyzer measurements. 6 INESC Porto Senior Engineer (J. Machado da Silva) 12 Redundancy & DFT & BIST techniques of RF, analogue & mixed-signal ASICs; Dynamic characterization of A/D converters. 6 LNL Legnaro Senior App.Physicist (G. Maron) 35Control and monitoring of large and widely distributed systems.15 PANalytical Senior Engineer (J. Bethke) 11 Principles and techniques of x-ray materials analysis using diffraction and fluorescence. 10 SCK.CEN Senior Engineers (M.Van Uffelen+P.Leroux) Reliability and radiation-tolerance qualification of optoelectronics components for extremely high dose applications 8 UCL Senior Engineer (I. Darwazeh) Network architecture, traffic, switching; Optical networks & topologies, Optical network standards, WDM networks & technologies. Communications circuits and ASIC design. 10 UCL Senior Engineer (J. Mitchell) 14.1 Core & access optical networks, Multiplexing technologies, transmission technologies, switching technologies, Devices & implementation, Network performance & measurements, optical networks for radio applications. 10 VTT OuluSenior Engineer ( P Karioja) 24.4Photonic packaging and integration.8 VTT Espoo Senior Research Engineer (I. Suni) 11 High-density array interconnect technology, Heterogeneous integration by direct silicon wafer bonding 3

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 17 WORKING TOGETHER (1/2) ACEOLE partners –Pre-existing relationships and/or collaborations –CERN services tailored to support international collaborations EU funding covers People: –Researcher salaries + social conditions –Training & Mobility –ITN Management –Organization of workshops, conferences »See Seamus’ presentation –It does not cover research project costs »That’s why ACEOLE research projects have been integrated into CERN’s approved R&D programme

Kick-off meeting, CERN, 2-Oct-08 M. Letheren 18 WORKING TOGETHER (2/2) Supervisory Board (Kick-off + 6 months, then ~ once per year) Approve and oversee implementation of training programme for scientific, technical and complementary skills; Co-ordination of the network-wide training activities; Monitor/evaluate overall progress of research training program; Management Committee (At least twice per year) Overall management of research programme; Implement training activities with associated partners; Management & follow-up progress of the individual projects; Organization network-wide training (courses, workshops, etc); Overview integration of Researchers into research team(s); Review of the Personal Career Development Plans; Dissemination of best practice and project results. Sharing information Use of SharePoint tool ( >> Robert’s presentationwww.cern.ch/aceole Deliverables 1. Annual S&T and management/financial reports 2. Prepare workshops & training events Supervisory Board (coordinator +MCSC chair +HR) Assoc. partners invited Management Committee Coordinator Work Package Leaders (Assoc partners invited) Administrative unit CERN HR and FI Departments Selection Committee