DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
TPC electronics meeting, /14 Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
The Control System for the ATLAS Pixel Detector
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Naming and Code Conventions for ALICE DCS (1st thoughts)
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
IDE DCS development overview Ewa Stanecka, ID Week, CERN
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
ATLAS MDT HV – LV Detector Control System (DCS)
The LHCb Run Control System
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV FSMs FEE FSMs FEE FSMs Databases Databases Summary Summary Interaction point FMD3 FMD2 FMD1 Christian Holm Christensen 30/06/07

Installed detectors 2 Christian Holm Christensen FMD3 installed mid April Subsequent commissioning. FMD2 installed end of June.

FMD3 Commissioning 3 Christian Holm Christensen Systems exercised: Trigger (from TPC partition, no busy-box) ‏ Trigger (from TPC partition, no busy-box) ‏ DAQ DAQ `High'-voltage (~130V) control. Not via PVSS project. `High'-voltage (~130V) control. Not via PVSS project. Lab low-voltage power supplies, since no CAEN modules available. Lab low-voltage power supplies, since no CAEN modules available. FEE control via dedicated `expert' control. FEE control via dedicated `expert' control.

Finite State Machine Hierarchy 4 Christian Holm Christensen FMD DCS CU DU LU FMD1 Innerbottom HV [0-4] LV [0-3] RCU FEELV [0-1] Innertop HV [0-4] LV [0-3] Innerbottom HV [0-4] LV [0-3] RCU FEELV [0-1] Innertop HV [0-4] LV [0-3] Outertop HV [0-9] LV [0-3] Outerbottom HV [0-9] LV [0-3] FMDX[2-3] FMD rack 2 FMD rack 1 HVPS [1-2] LVPS

LV & HV Finite State Machine 5 Christian Holm Christensen Done: main controls + monitors Done: main controls + monitors To do: To do: Database: store & restore values for HV/LV settings Database: store & restore values for HV/LV settings Include DCS: Access Controls, Titles, Standard panels Include DCS: Access Controls, Titles, Standard panels High-Voltage channel Low-Voltage channel

LV & HV Half-ring Finite State Machine 6 Christian Holm Christensen Inner Half-ring Outer Half-ring Done: main controls & monitors Done: main controls & monitors To do: To do: Panels for FMDx and FMD_DCS Panels for FMDx and FMD_DCS Test w/real power supplies and fans Test w/real power supplies and fans Include DCS: access control, titles, standard panels Include DCS: access control, titles, standard panels Test FSM for all HV & LV modules w/real hardware Test FSM for all HV & LV modules w/real hardware

FEE Finite State Machine 7 Christian Holm Christensen Have: Have: Expert GUI based on PVSS COM extension. Expert GUI based on PVSS COM extension. Need: Need: FSM & controls for RCU LV FSM & controls for RCU LV FSM & controls for FEE configuration. FSM & controls for FEE configuration. Monitor FEE (RCU) parameters (error/status, active FECs, state?) ‏ Monitor FEE (RCU) parameters (error/status, active FECs, state?) ‏ Archive FEC parameters (temperature, voltages, currents, state?). Archive FEC parameters (temperature, voltages, currents, state?). Maybe reuse TPC stuff. Maybe reuse TPC stuff.

FEE Control/Monitoring Architecture 8 Christian Holm Christensen PVSS send high-level commands to InterCom Layer (ICL) ‏ PVSS send high-level commands to InterCom Layer (ICL) ‏ ICL uses CommandCoder for configurations ICL uses CommandCoder for configurations ICL forwards monitoring from FeeServer ICL forwards monitoring from FeeServer Rcu++ encodes/decodes requests/results. Rcu++ encodes/decodes requests/results.

Top-level Finite State Machine (configuring) ‏ 9 Christian Holm Christensen Mostly implemented Mostly implemented Need to take care of order (first LV, then FEE conf, and finally HV) ‏ Need to take care of order (first LV, then FEE conf, and finally HV) ‏ Maybe need to move RCU up in hierarchy Maybe need to move RCU up in hierarchy Collaboration with Alexander Kurepin (INR) on this. Collaboration with Alexander Kurepin (INR) on this.

Databases 10 Christian Holm Christensen DB schema for FEE defined (need approval by IT) ‏ DB schema for FEE defined (need approval by IT) ‏ Transparent access via RcuDB/RcuConf in both DCS and DAQ domain. Transparent access via RcuDB/RcuConf in both DCS and DAQ domain. Store “tag” as datapoint – later used by DA/Offline SHUTTLE to retrieve settings. Store “tag” as datapoint – later used by DA/Offline SHUTTLE to retrieve settings. Focus on size & referential safety (3 rd normal form) ‏ Focus on size & referential safety (3 rd normal form) ‏ Never delete Never delete DB schema for LV/HV not clearly defined. DB schema for LV/HV not clearly defined.

Summary 11 Christian Holm Christensen Implemented and tested Lower level finite state machines for LV & HV Lower level finite state machines for LV & HV FEE access architecture FEE access architecture To be done Test finite state machines for LV & HV w/real hardware – especially CAEN LV supplies. Test finite state machines for LV & HV w/real hardware – especially CAEN LV supplies. Implement finite state machine for FEE Implement finite state machine for FEE Implement monitoring of FEE Implement monitoring of FEE Implement sub-detector finite state machine Implement sub-detector finite state machine Get IT approval of FEE DB schema, and populate DB Get IT approval of FEE DB schema, and populate DB Formulate LV & HV schema Formulate LV & HV schema Test/Implement rack access Test/Implement rack access Integrate TPC cooling state into finite state machine Integrate TPC cooling state into finite state machine DA for retrieving FEE settings for Offline DA for retrieving FEE settings for Offline

12 Christian Holm Christensen