The Australian Energy Regulator Economic benchmarking TNSP outputs data.

Slides:



Advertisements
Similar presentations
Purpose overview of the form and use of the AER’s augex tool Not
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Opex base-step-trend 8 May 2013.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines General discussion of draft guidelines 2 September 2013.
Measuring TNSP Outputs for Economic Benchmarking AER Economic Benchmarking Workshop #5 2 May 2013 Denis Lawrence and John Kain.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Interactions with incentive frameworks.
Better Regulation Expenditure Forecast Assessment Guideline 12 February 2013.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
CISB444 - Strategic Information Systems Planning
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
Amount and cost of losses June 11 th Florence School of Regulation Jose Luis Mata.
Australian Perspective: EGSS Developments and Application Issues Peter Williams Assistant Director, Centre of Environment Statistics (P)+61 (0)
SEEA Experimental Ecosystem Accounts: A Proposed Outline and Road Map Sixth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
Role and Components of Project Evaluation
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Better Regulation workshop transmission outputs and environmental factors.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
Technical Conference on Net Metering Load Research Study November 5, 2014.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with FNQ consumers/stakeholders 15 January 2014.
Better Regulation: Expenditure assessment and incentives 29 April 2013.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013.
Measuring NSP Inputs for Economic Benchmarking AER Economic Benchmarking Workshop #6 7 May 2013 Denis Lawrence and John Kain.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Auditing requirements for RINs and economic benchmarking data 9 October 2013.
Contribution. Definition of contribution Contribution is the difference between sales revenue and variable cost Contribution is the difference between.
Better Regulation workshop distribution outputs and environmental factors.
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009.
The Australian Energy Regulator TasNetworks Public Forum Revenue Proposal 1 July 2014 to 30 June July 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
Distribution Efficiency Initiative: Calculator Review April 29, 2008 Regional Technical Forum.
The Australian Energy Regulator Economic benchmarking DNSP outputs and environmental factors.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Better regulation workshop Economic benchmarking inputs.
Proposed Consolidation of Albury and Victorian Access Arrangements 10 November 2015.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
1 ACCC Workshop on the DRP Incentive Mechanisms and Benchmarking.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
5-3-1 Load and line regulation. Learning Objectives: At the end of this topic you will be able to; explain what is meant by the terms load regulation.
Developing a national governance framework for health promotion in Scottish hospitals Lorna Smith Senior Health Improvement Programme Officer NHS Health.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
The Australian Energy Regulator Economic benchmarking Input data.
Top-down models of operating and capital expenditure.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 Calculation of the integrated energy performance of buildings.
Quality Framework Proposal
Agenda TSOG 8th November
Network Optimization Executive Seminar Track 1, Session A
Demand Control Field Trials
Economic Operation of Power Systems
Electricity Distribution Network Design Training & Courses
Chapter 6: Estimating demand and revenue relationships
The System of National Accounts and Policy Development
Changes to Reserve Level Declaration Guidelines
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

The Australian Energy Regulator Economic benchmarking TNSP outputs data

Agenda TimeItem 9:00Introduction 9:15Model specification 10:05Break 10:20Outputs data requirements 11:25Break 11:35Environmental factors data requirements 12:25Next steps

How does this fit into the broader consultation? This is the 5 th workshop on economic benchmarking techniques – three more to come Draft guidelines and explanatory statement in August Final by 29 November

Economic benchmarking workshops DateSubject 13 MarchDNSP outputs and environmental factors 14 MarchTNSP outputs and environmental variables 20 MarchNSP inputs 30 AprilMeasurement – DNSP outputs and environmental variables 2 MayMeasurement – TNSP outputs and environmental variables 7 MayMeasurement - NSP inputs 22 MayPrescription in the EFA guideline & potential application techniques 30 MayExpenditure setting process

Context for this workshop First phase of economic benchmarking workshops on inputs, outputs and environmental factors completed Now we will consider data and definitions for economic benchmarking Final workshops will outline the application of economic benchmarking and the expenditure framework as a whole

Objective of this workshop To explain and discuss technical issues on how to incorporate outputs into modelling Weighting of outputs against each other Incorporating reliability Whether to use peak demand or capacity To discuss data requirements for outputs & environmental factors Is the data list comprehensive? Are the preliminary definitions suitable?

Structure of this workshop This workshop has been split into three parts 1. Consideration of the model specification (with a presentation from Economic Insights) 2. Discussion of data required to measure outputs 3. Discussion of data to measure environmental factors

Why focus on data collection? The AER must publish annual benchmarking reports Economic benchmarking will be incorporated into the benchmarking report The EFA guideline must set out data requirements for expenditure assessments

Why collect a broad range of data? Multiple perspectives on model specification Sensitivity analysis Data requirements for the mechanics of economic benchmarking – ie weighting inputs and outputs

Overlap with category analysis There is overlap between the data required for economic benchmarking and category analysis We aim to collect data that is consistent and can be used for both We will release consolidated draft data requirements with our draft guideline

Briefing note responses A number of points were raised in response to the briefing note. Three high level comments: Stakeholders would like to see the AER’s modelling for economic benchmarking It is unclear why the data is required Stakeholders consider that more environmental factors should be included in the data requirements The workshop on 22 May will cover application We will discuss the data today – and consider additional environmental factors

Economic Insights presentation

Discussion: Model specification issues Discussion topics Incorporating reliability How to weight outputs The use of peak demand, network capacity or neither

Outputs data requirements Ideally one data request that will be the main source of information for category analysis and economic benchmarking Data for primary model specification Data for sensitivity analysis, which requires a broader data set Question: is all the relevant data collected? Question: are the definitions suitable?

Revenue TUOS revenue can be used to calculate output weights but a functional outputs approach is preferred. Revenue data by component will be used for sensitivity analysis and may provide useful information in forming functional output weights Revenue by chargeable quantity eg. fixed customer charges, on-peak energy delivery charges (p.17) Revenue by customer type of connected equipment eg. distribution networks (p.17)

System Capacity O/H and U/G circuit length by voltage level (p.18) Installed transmission system transformer capacity Transmission substations Terminal points to DNSP systems Transformer capacity for directly connected end-users owned by the end-user

System Demand Non-coincident and coincident peak demand (p.20) Planned capacity on 50% and 10% POE (p.21) Transmission achieved capacity. (p.21)

Reliability Performance to STPIS components Service component Average circuit outage rate (p.21) Loss of supply event frequency Average outage duration Proper operation of equipment Market impact Network capability

Briefing note responses The VCR should not be used to weigh outages because the STPIS does not attempt to reflect customers’ valuation of outages STPIS values and thresholds are set with respect to TNSPs’ historical performance. Hence benchmarking on the basis of these parameters may be inaccurate The market impact parameter may have been prematurely dismissed

Briefing note responses definition of different ‘small’ and ‘large’ loss of supply event thresholds for different TNSPs The “number of protection system failure events” measure does not well reflect TNSPs’ ‘secondary deliverables’

Energy Delivered Total energy delivered Energy delivery by chargeable quantity Energy received from TNSP by time of receipt Customer type or class Delivery time period definitions

System losses Line losses as a percentage of purchases

Environmental factors Data not just sought from TNSPs- data may also be collected from other agencies Many differing environmental factors, however it may be that only a few can be incorporated. Hence there is a need to select the most material factors Question: is all the relevant data collected? Question: are the definitions suitable?

Comments in submissions The briefing note does not consider the different transmission responsibilities in Victoria compared to other NEM jurisdictions and how this is taken in to account.

Economic Insights presentation