Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.

Slides:



Advertisements
Similar presentations
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Advertisements

Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
CENTRAL CORRIDOR TRANSIT ACCESS STUDY Citizens for Modern Transit March 27, 2014.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
U.S. 33 Northern Connector Alternative
The Mystic River Corridor Strategy Project Metropolitan Area Planning Council Boston Redevelopment Authority City of Chelsea City of Everett City of Malden.
Commuter Rail Vehicle Technology Analysis | 1 May 2007 Commuter Rail Vehicle Technology Analysis May, 2007.
City of Charlotte Southeastern Rail-Highway Safety Conference Collaborating for Success With Railroads Carolyn Flowers, CATS CEO November 7, 2012.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Environmental Assessment Public Meeting
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
What is a master plan? Creates the long-term vision for the University’s land and physical resources. Lays foundation for development plan, but is not.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Dr Lina Shbeeb Minister of Transport. Jordan
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
1 RTD TOD Program University of Denver November 2004.
SUBWAY SYSTEM IN NEW YORK CITY The Magical Subway.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
January Transportation Economic Outlook.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
Beverly A. Scott, Ph.D. MBTA General Manager MassDOT Rail & Transit Administrator Richard A. Davey MassDOT Secretary and CEO Chairman of the MBTA Board.
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
The Southern Gateway IH 35E/US 67 Transportation Study November 18 & 21, 2002 The Southern Gateway IH 35E/US 67 Transportation Study Public Meetings.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Land Use Study for the Community of Winchester July 9, 2012.
Effective Transportation Planning City of Seattle, WA.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Confederation Line West LRT Extension Maintenance and Storage Facility Planning and EA Study Community Information Session September 21, 2015.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Background B Case Studies & C. Public Improvement Plan Presented by: Erin Newton.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
The Reno Streetcar March 8, 2016 RTC 2040 Regional Transportation Plan Economic Development Forum.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Willow Meadows Civic Club Meeting September 13, 2011
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Draft Transportation Element September 6, 2017
Construction Management & Inspection
Capital Programming Committee South Coast Rail Phase 1 Service
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Southwest LRT METRO Green Line Extension
Chicago to Council Bluffs-Omaha
Presentation transcript:

Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006

Project Location Green Line Extension

3 Project Purpose Implement enhancements to transit services for residents in the communities of Somerville, Medford and Cambridge –Improve corridor mobility and regional access –Boost transit ridership –Improve regional air quality –Ensure equitable distribution of transit services –Support opportunities for smart growth initiatives and sustainable development

Green Line Extension 4 Project History Numerous past studies Beyond Lechmere Northwest Corridor Study – MIS/AA (2005) –Nine initial alternatives narrowed to five –Green Line, commuter rail, bus rapid transit –Extensive stakeholder involvement –No preferred alternative identified

Green Line Extension 5 Environmental Review Process Department of Environmental Protection issued regulations related to State Implementation Plan (SIP) for air quality Green Line extension is the mandated alternative for the corridor Single Environmental Impact Report (SEIR)

Green Line Extension 6 SEIR Alternatives No Action Green Line Extension –extension from relocated Lechmere Station –to Medford Hillside (Lowell Line) –with spur to Union Square Somerville (Fitchburg Line)

Green Line Extension 7 Green Line Right-of-Way Along Lowell Line to Medford Hillside –From relocated Lechmere to before Mystic River –Relocate Commuter Rail tracks to east side –Two Green Line tracks on west side of ROW –ROW width sufficient in most areas except Between Medford St. and School St. (east side) Between Central St. and Lowell St. (east side) Between Broadway and Winchester Place (east side) Between Winthrop St. and North St. (west side) In the vicinity of most stations (west side)

Green Line Extension 8 Green Line Right-of-Way (cont.) Along Fitchburg Line to Union Square –From relocated Lechmere to vicinity of Union Square –No change to Commuter Rail tracks –Two Green Line tracks on north side of ROW –ROW width sufficient except In the vicinity of Union Square station (north side)

Green Line Extension 9 Support Infrastructure Embankment removal and construction of retaining walls Strom water drainage systems Fencing Concrete intrusion barrier between Green Line and Commuter Rail Overhead catenary and support structures Electrical systems and substations Signals and communications systems

Green Line Extension 10 Station Locations Stations proposed in the vicinity of: –Winthrop Street, Medford –College Avenue/Medford Hillside –Broadway/Ball Square, Somerville –Lowell Street, Somerville –Medford Street/Gilman Square, Somerville –Washington Street, Somerville –Union Square, Somerville

Green Line Extension 11 Proposed Station Locations

Green Line Extension 12 Station Facilities No parking facilities Bus access and passenger drop-off area Station access from bridges - stairway and ramp Center platform Charlie Ticket vending machines On-board fare payment Additional right-of-way needed near most stations

Green Line Extension 13 Roadway Bridges Inadequate Clearance Possibly Adequate Clearance Adequate Clearance Medford St.College Ave.North St. Lowell St.Central St.Cedar St. BroadwaySycamore St.Cross St. Winthrop St.School St.McGrath Highway (Lowell Line) Walnut St.McGrath Highway (Fitchburg Line)

Green Line Extension 14 Railroad Bridges Washington St. –Adequate width –Condition must be evaluated Harvard St. –Adequate abutments –Needs structure for two additional tracks Medford St. –Adequate abutments –Needs structure for one additional track

Green Line Extension 15 Storage and Maintenance Facility Lechmere Station relocation project –New “Yard 8” storage facility –Parallel to O’Brien Highway south of Washington St. Green Line Extension –Expand Yard 8 storage facility –Construct maintenance building –Land owned by MBTA and Guilford

Green Line Extension 16 Environmental Impacts Land Transportation Historical/Archeological Resources Other

Green Line Extension 17 Land Impacts 54 acres of previously altered land New impervious surface at stations New buildings <2 acres Stormwater issues along alignment –Especially Medford Hillside area –Stormwater management plan will be developed to mitigate impacts

Green Line Extension 18 Transportation Impacts Estimated reduction of 9,600 daily vehicle trips Relocation of up to 4 miles of commuter rail track 4.4 miles of double track beside active rail line Impacts on Green Line operations –Central subway capacity –Signal and power systems Removal/relocation of freight trackage or elimination of trackage rights

Green Line Extension 19 Transportation Impacts (cont.) Changes in local bus services No new roadways No parking at stations – drop-off only Employee parking at maintenance facility Pedestrian and bicycle facilities at stations Coordination with Somerville Community Path

Green Line Extension 20 Historical/Archaeological Susan Russell House - 58 Sycamore St. Adjacent to right-of-way No alterations anticipated

Green Line Extension 21 Other Possible Impacts Recreation facilities adjacent to right-of-way –Tufts Alumni Fields –Trum Field Playground –Hoyt-Sullivan Playground Wetlands –No impacted wetlands –Wet area near Lowell St.

Green Line Extension 22 Other Possible Impacts (cont.) Hazardous sites –Numerous nearby underground storage tanks –Numerous nearby hazardous materials sites Utilities –Bridge modifications may impact water and sewer –Electrical substation relocation behind Somerville HS near Union Square

Green Line Extension 23 Green Line Extension Schedule Expanded Environmental Notification FormOctober 2006 SEIR Scoping SessionOctober 2006 SEIR Notice to ProceedMay 2007 SEIR/Preliminary Design CompleteNovember 2008 Final Design CompleteMay 2011 Start of ConstructionNovember 2011 End Construction/Begin TestingJune 2014 Begin ServiceDecember 2014