U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29,

Slides:



Advertisements
Similar presentations
Managing Compliance Related to Human Subjects Research Review Joseph Sherwin, Ph.D. Office of Regulatory Affairs University of Pennsylvania Fourth Annual.
Advertisements

1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
Course Material Overview of Process Safety Compliance with Standards
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
SENIOR MANAGERS TRAINING FOR USE WITH
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D 2012 Annual PERT Workshop Best Practice.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Environmental Management Systems An Overview With Practical Applications.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
Regulatory Body MODIFIED Day 8 – Lecture 3.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Project Execution.
OH&S Management System
Massachusetts Municipal Environmental Stewardship & EMS in Public Schools Grant Programs Massachusetts Department of Environmental Protection April 28,
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Basics of OHSAS Occupational Health & Safety Management System
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Slide 1 Nick Salazar Operations Support.
University of Miami Office of Research Compliance Assessment Lynn E. Smith, JD, CIM, CIP Johanna Stamates, RN, BA, CCRC With assistance from Elizabeth.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Accident Investigation Board (AIB) for the Test Site 9920 Event 1 SAND P.
Important informations
1 Resuming Operations at WIPP Frank Marcinowski Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
1 General Supervision. 2 General Supervision (and Continuous Improvement) 1.What are the minimum Components for General Supervision ? 2.How do the Components.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
1 Status of PSC recommendations (January December 2007) Portfolio Committee on Public Service and Administration 14 March 2008.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
1 IMPLEMENTING DOE ORDER ENVIRONMENTAL MANAGEMENT SYSTEMS U.S. Department of Energy Richland Operations Office.
WIPP National TRU Program
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Sonya Barnette, DOE-HQ Office of Quality Assurance Policy and.
V Energy Facility Contractors Group (EFCOG) Safety Working Group Regulatory & Reporting Technical Subgroup Enforcement Letter: Suspect Documentation October.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED Classified Information Security Event EFCOG Fall Workshop.
WIPP Integrated Performance Measurement Baseline Workshop
1 Energy Communities Alliance Meeting WIPP Recovery and Greater-than-Class C Disposal Update February 17, 2016.
Streamlined Penalty Enforcement Program Board approved Waste Tire Hauler Streamlined Penalty Enforcement Program implementation in January 2009 Approval.
U.S. Department of Education Office of Special Education Programs Building the Legacy: IDEA General Supervision.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
OH&S Management System
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
SACSCOC Fifth-Year Readiness Audit
Low Level Radioactive Waste Forum, Fall 2014 Meeting
Accident and Incident Investigation
The Path Forward for WIPP: A State and Local Perspective
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
DOE NNSA CAS EFCOG/DOE CAS Effectiveness Task Team Sharon Steele Office of the Chief Defense Nuclear Safety (NA-511) November 16, 2016.
Safety Accountabilities
Overview of Waste Disposition Activities Fall 2017 LLW Forum Meeting
OH&S Management System
Charles Simpson Washington River Protection Solutions May 2018
System Safety Regulation
Presentation transcript:

U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29, 2015 Christine Gelles Associate Deputy Assistant Secretary, Waste Management EM HQ U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29, 2015 Christine Gelles Associate Deputy Assistant Secretary, Waste Management EM HQ

 Processing of Legacy TRU has been suspended since May 2014  Operations in TA-54, Area G currently limited pending additional safety analyses  EM and NNSA Field Offices collaborating closely on waste management and safety oversight matters  DOE Accident Investigation Board/WIPP Event Phase 2 EM-LA and NA-LA reviewed conclusions and Judgments of Need (JONs) from the AIB Report of the February 2014 incident at WIPP 22 JONs related or directed to LANL to: o Address systemic issues o Improve requirements definition o Implement improvements o Ensure compliance and improve oversight Los Alamos TRU Waste Program Status

 Implementing NMED-Approved Isolation Plan Over-packed storage in Permacon Regular monitoring  Temperature Control Implemented supplemental cooling as compensatory measure  Planning for Future Treatment of Waste Integrating all scientific, safety, regulatory and project activities over the next two years Over-packed RNS drums in the Permacon within Dome 375 Safely Managing Nitrate Salts

 Administrative Compliance Order (December 2014) Technical teams identified required correction actions In May 2015, DOE and NMED agreed on Principles of Agreement for Settlement Includes Supplemental Environmental Projects in lieu of fines/penalties  Extent of Condition Completed Evaluated extent of potential regulatory non-compliances of non-nitrate salt wastes processed since 2005 Written disclosure provided to regulator August 31  New Mexico Environment Department personnel engaged in planning for future nitrate salt treatment Regulatory Considerations

 Detailed Corrective Action Plans developed An integrated schedule of all EM-LA, NA-LA and LANS corrective actions tracks status of each organization’s progress to completion  Joint NNSA/EM Corrective Action Plan submitted to HQs September 15, 2015  LANS’ Corrective Action Plan submitted and under DOE review, though many actions completed or in process: Robust procedure development process to ensure effective SME and management review Formal engineering change control process Technical basis documents completed LANS hired senior QA manager  Resumption of TRU processing conditioned on specific actions Corrective Action Plans 5

 Developing the Technical Basis and Baseline Plan for Safe Storage and Future Treatment  Preliminary Plans developed Testing necessary for developing the technical basis for treatment (including processing variables) Regulatory approvals needed  Treat remediated nitrate salts to eliminate the hazards associated with incompatible materials  Treat unremediated nitrate salts  Potentially, process other above grade stored TRU Looking Forward 6