ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.

Slides:



Advertisements
Similar presentations
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Advertisements

July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Competition Effects of the Renewable Energy Policy Reform in Flanders: Is the Flemish market for Green Electricity Certificates working properly? Annemie.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
GB Queue The GB Queue – Problems and possible solutions Mark Copley.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
World Forum on Energy Regulation IV Athens, Greece October , 2009 Energy Market Design and Promotion of Efficient Emissions Reductions John Tamblyn.
Project Discovery Transmission Workstream, 4 March 2010 Ben Woodside.
Exchange A1: The support required to make Energy Performance Contracting a viable energy and carbon solution (TEC) Steve Creighton, Senior Relationship.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Code Administrators Working Group Introduction 28 August 2008.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
EHV generation charging methodology change Harvey Jones.
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Medium-term TEC Trading ARODG Seminars Glasgow & London February 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
© Energy UK April 2012 Transmission Workgroup – 4 th April Financial Commitment for Incremental Capacity Presentation by Energy UK
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
All Island Single Electricity Market IWFA Update Laura Brien
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Optimisation ARODG Seminars Glasgow & London February 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Economic regulation of electricity and gas network businesses Mark Feather, Acting Executive Director 23 November 2011.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
1 ST Market Engagement Session 3 rd October 2014 RE-PROCUREMENT OF CUSTODIAL TENANT DEPOSIT PROTECTION SCHEME Presentation by Ruth Hayes.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workgroup 4th October 2012
An Introduction to Balancing Services Use of System Charging (BSUOS)
Assessment of the GTAC: Nova’s perspective
SO Incentives from April 2010
PARCA Security and Termination Amounts
Joint Office Presentation for Modification 0678
Development of Entry Capacity Substitution
Proposed Transitional Gas Exit Arrangements
Entry Capacity Transfer and Trade
Options for the Development of a Demand Side Response Mechanism
Ofgem presentation to Gas Transmission Workstream
Pixie Energy ECO Switch
Presentation transcript:

ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007

ARODG 2 Purpose  To take stock of developments in transmission access since the ARODG  To allow parties to air a number of new developments  To consider developments as a package and identify what else users think needs to be done  To consider what role parties think Ofgem/ NGET/ licensees/ industry should play in this process

ARODG 2 Agenda  – Coffee  – Welcome & Introductions  – An overview of the ARODG – Mark Copley  – Developments since the ARODG – Mark Copley  – The Government’s View – Phil Baker  Coffee  – Capacity Trading – Adam Brown  – Lunch  The GB Queue – Mark Copley  – Queue Optimisation – Phil Collins  – Discussion  – Way forward and Close

ARODG - 2 The Access Reform Options Development Group - Overview Mark Copley

ARODG 2 Purpose  Convened in early 2006 to: –consider the enduring applicability of transmission access arrangements. –Highlight the potential problems with these arrangements –Develop a range of options for amending those arrangements.  The Group published its report in May along with a covering letter

ARODG 2 Assessment Framework  Security  Restricted Rights  Unrestricted rights

ARODG 2 Security  Problems –Parties can apply for connection without incurring significant cost –Can create potentially onerous financial burdens, which can be both large and volatile –Creates an uncertain environment for investment in generation –Not the most effective method of focusing transmission investment where it is most needed –Unclear governance arrangements

ARODG 2 Restricted Rights  The period between the completion of a connection to the system and the completion of wider works.  Problems –Does the range of products currently available make best use of available system capacity? Vary compensation, duration, degree of firmness etc –Are there sufficient opportunities for parties that value capacity more highly to obtain it? How can trading be facilitated?

ARODG 2 Unrestricted Rights  The rights which are granted once the transmission system is compliant with security standards  Problems –The reservation of capacity inherent in TEC in its current form. Is this pro competitive and does it allow efficient investment? –Are the transmission licensees incentives to connect generation to the system in a timely manner sufficiently strong?  The Group developed options involving different combinations of rights and obligations. Many included more certainty about the delivery date of capacity.

ARODG 2 Ofgem’s covering letter  Highlighted what we saw as desirable facets of an access regime: –Greater certainty over connection date and level of financial commitment for new generators –Ongoing protection for consumers against stranded assets –Case for changing the level and allocation of security arrangements –Merit in arrangements which enable the strongest projects to identify themselves –Consider developing access products which maximise available capacity and consider how access rights can be reallocated

ARODG - 2 Developments since ARODG Mark Copley

ARODG 2 Interim Generic User Commitment  Introduced in summer 2006  Voluntary alternative to Final Sums  Allows users to choose to fix liabilities, or opt for FSL  Securities ramp up to 10 years worth of TNUoS over 4 years.

ARODG 2 CAP131 – User commitment for new and existing users  Seeks to address several issues raised by ARODG, primarily in the securities building block. –Non-refundable holding fee means holding a connection offer is no longer a costless option –Generic user commitment regime gives certainty over securities. Charges ramp up over a 4 year period to 6 x the TNUoS tariff. –User commitment of 2 years required from existing players, may increase information available to transmission licensees –Greater certainty over delivery. –Clear methodology for determining securities

ARODG 2 CAP143 – Interim TEC  Raised by the SSE to create a new product giving a restricted access right –A generator can purchase a new product, Interim TEC –ITEC gives the same rights as TEC in most cases –BUT, for a given number of periods in the year, NGET can constrain the generator for a fixed price.  ITEC seeks to make better use of the existing system. The details are currently being developed by a CUSC working group.

ARODG 2 CAP142 – TEC Trading  Raised by British Energy to allow trading between existing parties  At working group stage  NGET also developing proposals for trading between existing parties and existing and new parties –But more of that later

ARODG 2 Ofgem’s TPCR  Ofgem provided funding for major transmission enforcements through the TIRG process in  In our recent TPCR we also provided funding for significant amounts of system reinforcement.  In addition, we developed mechanisms which would automatically adjust revenues if more generation connects.  Transmission companies have strong incentives to connect as much generation as possible during the period.

ARODG - 2 Mapping developments to problems Mark Copley

ARODG 2 Problems and Developments - Security Access Building Block ProblemPossible Solution SecurityUnpredictable levels of Securities IGUC & Fixed level of security (CAP131) Volatility of securitiesGeneric scheme independent of others High levels of securitySecurities in aggregate lower under generic regime Risk of inefficient investment User commitment for all Unclear governanceMethodology in CUSC

ARODG 2 Restricted & Unrestricted rights Access Building Block ProblemPossible Solution Restricted RightsLimited range of products CAP143 - ITEC Limited trading opportunities NGET developing proposals Unrestricted rightsReservation of capacity by existing parties None proposed Weak incentives to invest TPCR funding & revenue drivers

ARODG 2 Questions & Discussion points  Have we correctly characterised the problems?  Would recent developments have a positive impact?  Are there any outstanding issues or other issues to address?  If so, how should they be addressed?

ARODG 2 Promoting choice and value for all gas and electricity customers