2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland.

Slides:



Advertisements
Similar presentations
NCHRP 350 Crash Test Program NCHRP 350 CRASH TESTING OF WORK ZONE DEVICES 1997 FHWA started requiring work zone devices to be crashworthy. New purchases.
Advertisements

ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Corridor Management Strategies Pilot in Region 4 Findings and Recommendations Reported to HMT May 2013 By: Martin Matejsek, Laura Wipper, Steve Lindland.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Safety Conversation: NLTAPA Conference Michael S. Griffith Director Office of Safety Technologies Federal Highway Administration.
“You Could Learn a Lot About Guardrail From a Dummy…
Funding Programs Surface Transportation Program (STP) Transportation Alternatives Program (TA) Congestion Mitigation / Air Quality (CMAQ) Highway Safety.
57 th Traffic Conference. The National Problem — ,200 Fatalities 2.68M Injuries $230.6B / year $820 per person 3.3 Million Deaths Since 1928.
Lec 33, Ch.5, pp : Accident reduction capabilities and effectiveness of safety design features (Objectives) Learn what’s involved in safety engineering.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
Maintenance of Traffic (MOT)
Small City Funding Opportunities Transportation Improvement Board June 2010.
Part 3 – Markings. Dotted (not broken) lane lines shall be used for non-continuing lanes:  Lane drops  Auxiliary lanes  Deceleration lanes  Acceleration.
CRTPA FY FY 2017 Priority Project Lists UPDATE.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Safety Audit Components Safety assessment for risk Management.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Module 13: Highway-Rail Grade Crossings (HRGC)
Design Exceptions Presented by David Joe Polly PE, PLS, WRE Senior Standards Engineer Roadway Engineering Unit
Design Exceptions 101 Ed Fischer, State Traffic-Roadway Engineer Mike Morrow, FHWA Field Operations Engineer Kent R. Belleque, Senior Interchange Engineer.
Transportation Safety Issues on our Indian Reservations Dennis Trusty Director- Northern Plains TTAP 2009 Transportation Safety Conference Pierre, SD.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
Trail Funding Sources & General Information
"The Use of Condition Assessments to Improve Maintenance Level of Service in Texas" Joe S. Graff, P.E. Texas Department of Transportation.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Local Government Section
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Vegetation Control For Safety Russ Johnson – Maintenance Supervisor - WSDOT Don Petersen – Safety/Design Engineer - FHWA.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Louisiana Local Road Safety Program
Bridget Malinowski February 2013 ROADWAY TRAFFIC CONTROL & COMMUNICATIONS MANUAL 1.
Recent Guideline Changes 1 Recent AT Guideline Changes Existing Documents New Technical Documents Bridge Structure Design Criteria Bridge Design Bulletins.
2010 ROADWAY CONFERENCE 1R PROGRAM Steven Lindland.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Grade Separation Inspection & Ratings Grade Separation.
Successes in Reducing Highway Fatalities Kathy Harvey, MoDOT State Design Engineer July 16, 2008 Albuquerque, N.M.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
Geometric Design: General Concept CE331 Transportation Engineering.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Capital Plan Update FMCB Meeting February 26, 2016 Pre-Decisional – Draft for discussion only.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Publication No. FHWA-HRT Bicycle and Pedestrian Planning.
FEDERAL LANDS ACCESS PROGRAM UT FLAP Prospective Applicant Webinar Thursday, March 31, 2016 Chris Longley, FLAP Program Manager Morgan Malley, FLAP Lead.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
5/8/02FHWA Office of Safety1 Funding Resources for Highway Safety (FY2001 Fed-Aid) $1.4 $5.6 Min. Guarantee Bridge Surface Transp. Program National Hwy.
Huston, Texas | June Jing Zhang, AICP, PTP, LCI, LEED AP ND AccommodatingCyclists in Accommodating Cyclists in Highway Maintenance Projects -- an.
Transportation Engineering Business Development Workshop Department M
Rating Grade Separations
The I-465 West Leg Reconstruction Project
The Key Elements of Developing a Traffic Control Plan
Scoping for Performance-Based Solutions; CR E2 ACEC Conference March 5, 2012 Tom O’Keefe Metro District Program Delivery.
Public Information Meeting NW 100th Street Reconstruction Project
ALDOT Pavement Preservation Policy
Overcoming Barriers to Implement Research Projects
Connected Vehicle Activities at MnDOT
Presentation transcript:

2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland

1R Technical Bulletin

1R Program Pave Only Projects Striping – Gravel Shoulders –Signal Loops

Eligible Projects Preservation Projects Single Lift Non-Structural Overlays or Inlay

Eligible Projects Grind & Inlay Plus an Overlay Allowed with a Design Exception

1R Projects Can Not Adversely Impact A Safety Feature

1R Program FHWA Preventative Maintenance Program

Statewide Traffic Barrier Inventory Completed 2008

Statewide Traffic Barrier Inventory

230 Transition

1R Safety Fund $6 million per year for Traffic Barriers

1R Safety Fund Upgrade Substandard Traffic Barriers Using a Statewide Strategic Process

High Priority Barrier Features 1 - Un-connected Transitions 2 - Pre 230 Terminals 3 - Pre 230 Transitions 4 - Tongue & Groove Concrete Barrier 5 - Pre 230 Type 1 and 1A Guardrail 6 - Pre 230 Type 2 Guardrail 7 - Pre 230 Impact Attenuators 8 - Rebar Pin & Loop Concrete Barrier Loop Pin & Loop Concrete Barrier Transitions Impact Attenuators

Cost to Upgrade High Priority Features HIGH PRIORITY FEATURENUMBERCOST UN-CONNECTED TRANSITIONSIncluded in Pre-230 Terminals PRE-230 TERMINALS11,100 units $45,000,000 PRE-230 TRANSITIONS 1,000 units $ 6,000,000 T&G CONCRETE BARRIER 7 miles $ 3,000,000 PRE-230 Type 1 GUARDRAIL 140 miles $19,000,000 PRE-230 Type 2 GUARDRAILIncluded in Pre-230 Type 1 PRE-230 IMPACT ATTENUATORS 60 units $ 3,000,000 TOTAL $76,000,000

1R Roadside Inventory u ROADWAY TYPICAL SECTIONS u DESIGN CONSIDERATIONS (ADT – Speed) u STRUCTURES u SIGNS u GUARDRAIL u DRAINAGE FACILITIES u PEDESTRIAN & BICYCLE FACILITIES u SPECIAL PROBLEMS (Clear Zone Safety Hazards)

1R Projects Vertical Clearance Standard Traffic Mobility Standards Still Apply

Approval of Applying 1R Standard Region Pavement Services Unit FHWA

1R Program Benefits Helps to Meet Pavement Condition Targets

1R Program Benefits Shorter Project Delivery Timeline

1R Program Benefits Established a New Program to Upgrade Substandard Traffic Barriers

Questions