Memorandum of Understanding to Develop A Nationally Coordinated Leftover Paint Management System California Integrated Waste Management Board - December.

Slides:



Advertisements
Similar presentations
Product Stewardship Recommendations Report Solid Waste Management Coordinating Board January 28, 2009.
Advertisements

California Integrated Waste Management Board Contractor’s Report Framework for Evaluating End-of-Life Product Management Systems in California Presented.
Paint Product Stewardship Initiative December 9-10, 2009 Scott Cassel, PSI Executive Director/Founder.
Paint Product Stewardship Initiative Presentation to Retailers Scott Cassel, PSI Executive Director/Founder December 13, 2007.
Leftover Paint Collection - Why the Current System is Not Working Charlotte, North Carolina – September 2006 Government Perspective.
Financing Workgroup Presentation Meeting Sept Portland, OR.
Greenhouse Gases in Sacramento – Measurement and Action Obadiah Bartholomy Sacramento Municipal Utility District APPA Annual Conference Salt Lake City,
Paint Product Stewardship Initiative Sacramento, CA April 15-16, 2004.
Midwest Product Stewardship Council GLPPR/Great Plains P2 Conference Chicago, IL March 14, 2007.
1 Moving Ahead: Impacts of the U-Waste Sunset 10 th LEA/CIWMB Conference Bahia Resort, San Diego October 16, 2007 Cynthia Dunn, CIWMB.
Bringing Paint Product Stewardship to California © 2009 by the California Integrated Waste Management Board (CIWMB)
CONVENIENCE ANALYSIS OF THE OREGON PAINT MANAGEMENT PILOT PROGRAM Hedrick Strickland Advised by Dr. Lynn Maguire and Matt Keene, US EPA.
PaintCare Paint Stewardship Program Alison Keane, VP, Government Affairs, ACA General Counsel, PaintCare.
Managing Post-Consumer Paint Alison Keane, Counsel Government Affairs National Paint and Coatings Association.
Lifecycle Workgroup September 26-27, 2005 Portland OR – Paint Dialogue.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Paint Product Stewardship Initiative September 19-20, 2007 Scott Cassel, PSI Executive Director/Founder.
Meeting funded by: Thank you to our sponsors!. PSI Fluorescent Lighting National Dialogue Meeting © Product Stewardship Institute, Inc. July 2008 Fluorescent.
Education Work Group September 26-27, 2005 Portland Oregon Dialogue Meeting.
California Integrated Waste Management Board Tools and Models for Jurisdictions’ Implementation of AB 2449 Market Development and Sustainability Committee.
PSI Forum/NW NAHMMA Conference Tuesday, June 2, 2009 Product Stewardship Framework Legislation Sego Jackson Snohomish County Solid Waste Division, Principal.
California Integrated Waste Management Board 1 Waste Tire Manifest System.
California Integrated Waste Management Board 1 General Extended Producer Responsibility Policy Options September 11, 2007 Presentation by CIWMB Staff to.
Paint Product Stewardship Initiative Washington, D.C. June 29-30, 2004.
SWIS Digital Inspections Project Update (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board August 31, 2009.
Discussion And Request For Direction On Options For Expanding Board Awards Program Market Development and Sustainability Committee March 7, 2007.
Root Causes of Leftover Paint Work Group A April 15th and 16th, 2004 Sacramento, California Dialogue.
Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Mission: Design, implement and evaluate an industry led, fully funded statewide.
PSI Fluorescent Lighting National Dialogue Meeting © Product Stewardship Institute, Inc. July 2008 Fluorescent Lighting Product Stewardship Initiative.
© Product Stewardship Institute, Inc. October 8, 2009 Meeting sponsored by:
Product Stewardship and Mercury Automobile Switches Peggy Harris CA Department of Toxic Substances Control.
1 Emerging Lessons From the Race to the Top in Massachusetts Robert Curtin Director, Education Data Services Massachusetts Department of Elementary and.
Paint Product Stewardship Initiative Chicago, IL September 20-21, 2004.
Paint Product Stewardship Initiative Presentation to California Integrated Waste Management Board Scott Cassel, PSI Executive Director/Founder December.
September 26-27, Paint Product Stewardship Initiative Meeting #5 Portland Oregon.
Paint Product Stewardship Initiative Update – May 2007 PSI National Product Stewardship Forum California Integrated Waste Management Board – Glenn Gallagher.
California Integrated Waste Management Board Consideration Of Scope Of Work, Contractor, And Augmentation Of Contract Allocation For The At-Store Recycling.
California Integrated Waste Management Board Contractor Report Framework for Evaluating End-of-Life Product Management Systems in California Presented.
Implementation of Minnesota’s E-waste Law RAM/SWANA 2007 October 22, 2007 Garth T. Hickle Minnesota Pollution Control Agency.
The National Paint Product Stewardship Initiative NAHMMA / Northwest Conference Sept 22, 2005 Greater Tacoma Trade and Convention Center Presented by David.
A Better Way: Product Stewardship. Report to CIWMB: Framework for Evaluating End-of-Life Management Systems Case Studies 1.Rechargeable Battery Recycling.
Overview of the PSI Paint Product Stewardship Initiative May, 2010 Scott Cassel, Executive Director/Founder Product Stewardship Institute, Inc.
1 Heidi Sanborn, Project Manager Paint Product Stewardship CRRA Conference July 12, 2005 Los Angeles, CA.
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Consideration Of Scope Of Work And Agreement To Conduct Tire Forums FY 2005/2006 December 7, 2005 Victoria Rocha
California Integrated Waste Management Board 1 Consideration Of Applicant Eligibility, Project Eligibility & Evaluation Process for the Tire-Derived Product.
1 California Green Chemistry Initiative DTSC Director Maureen Gorsen Presentation to California Integrated Waste Management Board September 11, 2007.
Managing Post-Consumer Paint The Paint Product Stewardship Initiative (PPSI)
Thank you to our funder and sponsors.. © Product Stewardship Institute, Inc. November 2008 PSI National Dialogue on Fluorescent Lighting National Dialogue.
California Integrated Waste Management Board 1 Update on the Paint Product Stewardship Initiative March 17, 2009 Emily Wang Agenda Item 4
1/9/2004CIWMB - SB 20 Implementation - Payment System Workshop1 Proposed Phase 1 System for Covered Electronic Devices (CEDs) Authorized Recycler Waste.
Slide Show Staff’s Presentation. Carpet Stewardship MOU Update Voluntary Ten-Year Agreement Industry, Government & Non- Profits Seeks 30% Diversion by.
The overarching goal of the legislation is to have Ecology conduct research and develop recommendations for implementing and financing an electronic product.
May 3-4, 2006 PPSI Meeting - Sarasota FL1 Paint Product Stewardship Initiative Dialogue Meeting Sarasota, FL May 3-4, 2006.
California Integrated Waste Management Board 1 Rigid Plastic Packaging Container (RPPC) Informal Rulemaking Jerry Berumen Permitting and.
Smooth Sailing Ahead Partnering With Sustainability and Waste Compliance & Mitigation Fernando Berton, CIWMB.
1 NPCA Board Resolution. 2 September 2006 – PPSI Meeting State and Local governments requested a decision from NPCA at its March 2007 Board meeting State.
California Integrated Waste Management Board Consideration of a Memorandum of Understanding Between the California Integrated Waste Management Board and.
California Integrated Waste Management Board 1 Update And Request For Direction On The Determination Of The Co- Mingled Recycling Rate For The At-Store.
1 CIWMB E-Waste Update CIWMB Working Group December 2001.
PPSI Oregon Pilot Program Update Call 12/2/09 Oregon’s Paint Product Stewardship Law : 1 st in the Nation Abby Boudouris HHW Coordinator Oregon DEQ Alison.
1 Paint Product Stewardship Initiative Update PSI Forum, June, 2008 Shirley Willd-Wagner California Integrated Waste Management Board.
PaintCare MRRA Conference | May 3, PaintCare Inc. o Non-profit 501(c)(3) organization o Created in 2009 in response to Oregon paint stewardship.
Paint Product Stewardship Initiative April 30-May 1, 2008 Scott Cassel, PSI Executive Director/Founder.
Update On Progress Of Developing A Nationally Coordinated Leftover Paint Management System California Integrated Waste Management Board - July 2007.
1 after legislation: evaluation for continued improvement in EPR programs 2015 NAHMMA Annual Conference September 16, 2015.
2/10/05 California Integrated Waste Management Board1 Consideration Of A Report to the Legislature: Plastic Trash Bag Program And A Comprehensive Approach.
May 3-4, 2006 PPSI Meeting - Sarasota FL
Paint Product Stewardship Initiative
AHA 340B Good Stewardship Principles
Presentation transcript:

Memorandum of Understanding to Develop A Nationally Coordinated Leftover Paint Management System California Integrated Waste Management Board - December 2007

California Integrated Waste Management Board 2 Leftover Paint – Historical Concern CIWMB Active since 1987 in developing solutions to management of leftover paint CIWMB has participated since 2002 in the Paint Product Stewardship Initiative’s National Paint Dialogue

California Integrated Waste Management Board 3 California’s Participation CIWMB helped fund 3 projects: Recycled Paint Standard Paint Collection Infrastructure Study Product End Of Life Framework Report

California Integrated Waste Management Board 4 Concerns with MOU Measurable collection goals and performance standards be customized for each state and based on significant increase above that state’s baseline Alternatives on how to revise/improve system if goals are not met should be specified Voluntary system: need clarity on retailer involvement, level playing field

California Integrated Waste Management Board 5 Next Steps CIWMB will continue to press for specific measurable collection & performance goals Comprehensive evaluation of MN Project led by US EPA Lessons learned from Demo Project will be used to improve system Rolls out to OR, WA, VT in July 2009 California in July 2010

California Integrated Waste Management Board 6 MOU Options MOU is not ideal; but represents best current process to move Paint Stewardship forward Board staff recommends Option 1: sign the MOU (accompanied by statement of concerns) to continue Paint Product Stewardship Initiative forward through December 2010.