The Owner’s Perspective

Slides:



Advertisements
Similar presentations
Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
W E L C O M E.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Lessons Learned: CM at Risk & Design Build
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
A Match made in Heaven? Connecting you with a builder.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
CTC-470 Construction Administration Project Management Concepts.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Presentation Outline Background Problem assessment Idea development Proposed program Future efforts.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
TEAM 1 Share All Project Risks. Implications - DBB ArchitectContractorClient/Owner Risk LevelLowHighMedium BehaviorDelivery and DoneLowest cost and fast.
Orientation to Architecture J. Bradley Satterfield, AUA, AIA Campus Architect Georgia Institute of Technology.
DESIGN-BUILD CM Perspective Owner’s Expectation – DB is Master Builder Stakeholder’s Expectation – DB must satisfy their requirements DB’s Expectation.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Applying Business Process Re-engineering
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Design for Energy Star Martha Layne Collins High School Shelby County School District Shelbyville, Kentucky.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.
Graphical Detailing in Construction and the Built Environment
What you need to know about handling major school works 5 th July 2013.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Listen engage advise deliver The Facilities Master Plan Process Dorothy McCarty, AIA, LEED AP October 12, 2016 ICCCFO FALL CONFERENCE.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
Class #1 Contract Delivery Systems
Topics For PRT Proposals
Project Management Institute
BIM in Education: North Carolina A&T State University School of Technology Ben Obinero Uwakweh.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
CAPITAL PROGRAM OVERVIEW
Project Delivery Systems
Green Line Extension Project
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Chapter 2 – Review ‘construction management’
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

The Owner’s Perspective Design-Build Process from All Sides The Owner’s Perspective Joel Swift, Architect, AIA, LEED AP Manager, Facilities Design and Construction UC Davis Health System County of Placer (‘92-’98,’07-’13) UC Davis Architects & Engineers (‘98-’07) UC Davis Health System (‘13-present)

The Owner’s Perspective Design-Build Process from All Sides The Owner’s Perspective South Placer Adult Correctional Facility

The Owner’s Perspective Design-Build Process from All Sides The Owner’s Perspective

The Owner’s Perspective Design-Build Process from All Sides The Owner’s Perspective Multiple delivery methods: Design-Bid- Build, CM advisor, CM at Risk, Design Build, Job Order Contracting, Lease/Lease buyback, in house workforce, volunteers… Opportunity to work on teams that drafted master documents for both the UC and counties D/B is a major topic in both subsectors – different agencies are at different levels UCD Health System – assess best delivery method for project

What can owner do to help insure a competitive bid? Design-Build Process from All Sides What can owner do to help insure a competitive bid? (Actually, more than a bid, a Best Value Proposal)

What can owner do to help insure a competitive bid? Design-Build Process from All Sides What can owner do to help insure a competitive bid? (Actually, more than a bid, a Best Value Proposal) Start early Understand your project Communicate Build a team  

What can owner do to help insure a competitive bid? Design-Build Process from All Sides What can owner do to help insure a competitive bid? You can have all the components of a winning team All the preparation, game plan Might even have a hall of fame quarterback like John Elway But you still have to keep the band off of the field. Manage the Process Prepoposal – listen to the community Proposal -secure meetings, feedback loop Award – communicate award criteria. Manage your team

What can owner do to help insure a competitive bid? Design-Build Process from All Sides What can owner do to help insure a competitive bid? Technically more than a bid – Best Value, complex assessment   Start early, understand your contract Mechanics of bid/award criteria/stipends Right sizing the documents to the project Define project and team Build a team CM AE Contracts/legal/RM/labor compliance/sustainability Make it part of your culture (San Diego County , UCI) Communicate your intentions Internal to owner, cultivate and maintain buyin FDC, POM, IT, Risk, Sustainability Officer All levels of organization, financial,CEO, elected officials Manage expectations Master architect/CM/criteria team How many times has project changed to D/B midstream? D/B community Listen Manage the Process Prepoposal – listen to the community Proposal -secure meetings, feedback loop Award – communicate award criteria. Provide and Maintain Vision

Use of Prescriptive vs. Performance standards? Design-Build Process from All Sides Use of Prescriptive vs. Performance standards?

Use of Prescriptive vs. Performance standards? Design-Build Process from All Sides Use of Prescriptive vs. Performance standards? The Short Answer: Both

Use of Prescriptive vs. Performance standards? Design-Build Process from All Sides Use of Prescriptive vs. Performance standards? The Long Answer: What is right for the project? Gauge the best documents for the specific parts of the project scope Start with as much Performance criteria as possible Prescriptive where necessary to maintain project vision

Use of Prescriptive vs. Performance standards? Design-Build Process from All Sides Use of Prescriptive vs. Performance standards? Related topic: How far do you take the proposal documents? From criteria to bridging documents How far is too far?

Use of Prescriptive vs. Performance standards? Design-Build Process from All Sides Use of Prescriptive vs. Performance standards? How clear are your program documents?

Use of Prescriptive vs. Performance standards? Design-Build Process from All Sides Use of Prescriptive vs. Performance standards? How far is too far?

Design-Build Process from All Sides Can I Make Changes?

Design-Build Process from All Sides Can I Make Changes? Of course, I am the owner

Design-Build Process from All Sides Can I Make Changes? But perhaps the real question should be: How dearly do I want to pay for it?

Design-Build Process from All Sides

Design-Build Process from All Sides Can I Make Changes? Change Management Post Award – Owner v Contractor changes Post Award – Timing of owner’s changes Post design - degree of owner involvement

What is most important? Cost or Final Product? Design-Build Process from All Sides What is most important? Cost or Final Product?

What is most important? Cost or Final Product? Design-Build Process from All Sides What is most important? Cost or Final Product? Short Answer: Yes  

What is most important? Cost or Final Product? Design-Build Process from All Sides What is most important? Cost or Final Product? Long Answer: It’s really about Cost, Scope and Schedule

What is most important? Cost or Final Product? Design-Build Process from All Sides What is most important? Cost or Final Product? Scope, Budget and Time

Design-Build Process from All Sides My time is up Thank you