17 th ATF2 Collaboration Meeting Summary Glen White, SLAC Feb 14, 2014.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Tests of DFS and WFS at ATF2 Andrea Latina (CERN), Jochem Snuverink (RHUL), Nuria Fuster (IFIC) 18 th ATF2 Project Meeting – Feb – LAPP, Annecy.
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
IPBSM status and plan ATF project meeting M.Oroku.
BPM Orbit Data Analysis with Wakefields Glen White, SLAC January 2013.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Summary of Status Towards Goal1 and Future Plans Glen White, SLAC 15 th ATF2 Project Meeting, KEK January
Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
J. Pfingstner Imperfections tolerances for on-line DFS Improved imperfection tolerances for an on-line dispersion free steering algorithm Jürgen Pfingstner.
Marc Ross T9 – Snowmass 2001 Closing Plenary T9 – Diagnostics M. Ross/R. Pasquinelli Thursday, July 19 RD: 1) determine mixing between z and x/y 2) determine.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Wakefield effect in ATF2 Kiyoshi Kubo
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
ATF2 Status Background for the installation planning of Collimator
ATF2 Status N.Terunuma, KEK
Beam Commissioning Adam Bartnik.
Special ATF Session - ATF/ATF2 day on 28th September -
ILC BDS Alignment, Tuning and Feedback Studies
Expected hardware status and Priority of the commissioning task
Intensity dependence of Beam size at IP and Wakefield in ATF2
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
ATF2 Recent Wakefield (Beam size Intensity dependence) Studies
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

17 th ATF2 Collaboration Meeting Summary Glen White, SLAC Feb 14, 2014

ILC Simulations… + …mountain site simulation added!

LINAC, DR, Alignment Considerable improvements in beam delivery to EXT through numerous improvements since summer: – Modulator replacement – Cooling water regulation system updated – Klystron replacement – DR air temperature regulation Corrective maintenance – DR injection kicker HV – Gun laser problems (5.6ns -> 2.8ns system restored) – DR XSR monitor Si mirror replacement New device: MS1X YAG:Ce screen Radiation inspection passed Oct/Nov 2013 – 40mA stored in DR and extracted with acceptable radiation loss Alignment [DR, EXT, FFS] – EXT, FFS alignment stable – DR changes due to temperature fluctuations Desire to find a way to align with magnets ON

DR Tuning Studies Fast & automated tuning techniques utilising turn-by- turn DR BPM system implemented by Yves being taken over by Jurgen Steady improvements in robustness of software, more work planned Beta, tune measurement and correction well in hand – Extend to dispersion and coupling correction – Hope to recover ~5pm emittance results achieved in earlier tests Work planned for non-expert (GUI) interface Some problems reported with 8 DR BPMs – Should be looked at by Fermilab?

EXT/FFS Optics Corrections Optics measurements & corrections in EXT as before – Dispersion correction with EXT quads/skew quads – Coupling correction by removing OTR tilts – Matching using data from mOTR system & Q1-10X Looking to extend to “intrinsic” emittance measurements Non-expert correction possible via mOTR GUI interface – Still see weekly drifts in extracted dispersion & coupling conditions Need more work with DR studies to hold EXT channel stable? Improvements to mOTR CAL system investigated OTR3X target mis-alignment identified and fixed Studies continuing to link EXT & FFS optics corrections to IP, including image waist conditions

FFS/ATF2 Goal 1 Progress Highest priority is restoration of stable 174-degree mode operations and tuning below 60nm. – Experience strongly suggests limiting factor is jitter/drifts in IPBSM laser system Many studies and improvements of laser stability, mainly involving cooling water & air stability Discovery of strong sensitivity of temp. control of harmonic generator identified Hope that situation is now improved for next run, but monitoring of this situation most important aspect of next operations period. Continuing statistical analysis of impact of IPBSM signal jitters including simulation work – Desire to understand large variation observed during different runs – Analysis indicates as much as ~15nm contribution during March period – Discussions on presenting estimates of systematic errors due to drifting behaviour during fringe scans (e.g. apparent sudden jumps)

FFS/ATF2 Goal 1 Progress Identified requirements for goal 1 instrumentation – IPBSM M fluctuation <5% – IPBSM C > 0.9 – IPBPM res. ~20nm – IPBPM dyn. range +/- 30um Desire to continue in immediate future with 10x1 FFS optics – Comparative studies with ILC Similar tuning difficulty in Y Easier in X -> desire to move to 1x1 optics in future… – Octupoles may help here with tail folding Priority further studies identified – Jitter studies – Intensity dependence

IPBPM Progress System critical for Goal 2 but also very likely to be of importance to Goal 1 – Strong desire to have fully implemented system asap Installation of IP BPM triplet & mover systems complete IPBPM system still in commissioning stage – First resolution estimates ~30nm Discrepancies with different analysis methods need to be solved – Worries about dynamic range Appears to be ~3um, require 30um – Suspect gross misalignments of doublet block Hindering resolution calculation efforts May need to re-fabricate or live with 2 BPM system and uncertainties over resolution? Mover setting adjustment presented to clarify situation Continuing studies to directly measure vibration stability of mover systems… Immediate action required on: – Implementing permanent readout to controls system – Understanding of linearity limitations restricting dynamic range – Clarify BPM co-alignments

Intensity Dependence / Wakefields Measurements this run confirm still strong dependence of IPBSM modulation on beam intensity. Beam orbit through EXT & FFS better than ever (~100um offsets measured by BPM systems). Also <200um alignment of beamline devices. – Cannot explain intensity dependence with studied wakefield sources even with 2X experimentally determined wake potentials for known sources (require 5-6X) Emittance growth vs. charge measured in DR and EXT -> small compared with IP measurements. Longitudinal wakefields considered -> found to be insignificant Many things improved in beamline, has not made significant difference – bellows shielding, change to symmetric ports, moving devices from high-beta regions… Proposal to implement “wake-free steering” – May be difficult to implement due isolating small orbit effects due to wakes from other jitter sources – Orbit-based study important however and very welcome New proposal to study pitch of beam (head-tail offset) – Use tilt signal from IPBPM Pitch needs to be large compared to incoming beam angle -> better to use multiple BPMs – Consider direct manipulation of pitch with deflecting RF cavity C-band RF cavity exists at ATF but need C-band RF source Proposal to shield vacuum ports in Feb/March timeframe Also some possibility to address flange gaps- fill some of them on the above timescale.

Beam Stability / Goal 2 Blurring lines of distinction between goal 1 and 2 due to desire for stable beam operations for maximum fringe modulation stability. Start thinking about moving to 2-bunch operations and upgrading beam diagnostic systems to routinely work in this mode. EXT/FFS orbit jitter studies continuing – Try to isolate jitter sources 1 main source somewhere in early EXT -> need higher res. orbit analysis in that area to pinpoint. Another source possibly close to FFS beginning 2-bunch feedback – Factor 3 jitter reduction with u/s FB MFB1FF – System becoming more “turn-key” – Need to understand reduced FB performance at IP Check optics of U/S system and model propagation to IP and investigate improvement possibilities – Need to start work implementing FB IP How to mesh with ongoing IPBPM commissioning effort? Efficient to split signals and proceed in parallel?

R&D Items / New Proposals Halo/collimation studies – Progress on characterisation of halo & design of new collimation system Looks promising to reduce backgrounds at IP Further work to calculate wake estimates and perform more sophisticated background propagation simulations with showering processes. Ground motion FB studies – Primary difficulty lies with incoming jitter removal – New jitter subtraction technique shows promise, plus inclusion of U/S FONT FB yields further improvements – Requests for higher-resolution beam monitoring in EXT and intentions for further FD jitter studies OTR/ODR systems – <1um OTR measurements old LW IP – New proposals on combined OTR/ODR system to find ultimate limit on spot size measurement capability Positron source R&D – Optical cavity work by KEK and LAL groups – Shown ability to store high beam power in cavity – DR beam lifetime dependence on stored power demonstrated – Fundamental studies required to understand limitations in stored power and laser profile – New conventional positron source R&D effort proposed (test of beam-loading compensation ATF)

Immediate next (technically driven) steps are clear… Solve IPBSM laser stability issue Restore stable 174-degree mode fringe scan operations. Try and tune <65nm and find beam size limit with all 1 st and 2 nd order tuning knobs – 10x1 optics, 1E9 Q In parallel, continue IPBPM commissioning which may be critical for next steps Also in parallel, pursue solution to intensity dependence issue Next steps depend upon what we learn… what is the limiting factor for spot size? – Beam jitter? Go directly to 2-bunch, jitter studies, b-b feedback etc -> need IPBPM Need high charge -> wake issues – IPBSM systematics? – Something more fundamental with optics/tuning system?

finally… どうもありがとうございました ! Many thanks to our hosts here at ATF2 and KEK for supporting this meeting and the research activities of all foreign collaborators.