Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.

Slides:



Advertisements
Similar presentations
Process Selection and Facility Layout
Advertisements

11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 13 Inventory Management McGraw-Hill/Irwin
Standard Costing and Variances
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Learning Curve Analysis
Process Selection and Facility Layout
Chapter 4: Elasticity of Demand and Supply
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Efficiency is a level of performance that describes a process that uses the lowest amount of inputs to create the greatest amount of inputs. 2.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Four Systems Design: Process Costing.
Section 23.1 The Role of the Buyer
3 CHAPTER Cost Behavior 3-1.
Stephen R. Lawrence Associate Professor of Operations Leeds School of Business University of Colorado Boulder, CO
Financial and Managerial Accounting John J. Wild Third Edition John J. Wild Third Edition McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies,
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 6 The Theory and Estimation of Production
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Acceptance Sampling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Standard Costing and Variance Analysis
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
© 2008 Prentice Hall, Inc.E – 1 Operations Management Module E – Learning Curves PowerPoint presentation to accompany Heizer/Render Principles of Operations.
Overhead and Marketing Variances Chapter Thirteen.
Learning Curves Chapter 4A. Objectives 1. Understand what learning curves are and how they can be estimated. 2. Apply learning curves to estimate the.
Human Resource Management chapter twelve Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
Operations Management
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Three Systems Design: Job-Order Costing.
Project Cost Management
Chapter 7 The Theory and Estimation of Cost. Copyright ©2014 Pearson Education, Inc. All rights reserved.7-2 Chapter Outline Importance of cost in managerial.
E - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall E E Learning Curves PowerPoint presentation to accompany Heizer and Render Operations Management,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Chapter SevenCopyright 2009 Pearson Education, Inc. Publishing as Prentice Hall. 1 Chapter 7 The Theory and Estimation of Cost.
The Nature of Costs Chapter Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright 2013 John Wiley & Sons, Inc. Chapter 8 Capacity, Scheduling, and Location Planning.
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Product Costing and Cost Accumulation in a Batch Production.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
ACC3200 STANDARD COSTING.
ME - 1© 2014 Pearson Education, Inc. Learning Curves PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Supplement 7 Learning Curves.
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
 Copyright, Ansari, Bell, Klammer and Lawrence, Management Accounting: A Strategic Focus, Irwin-McGraw-Hill, Production Methods v Craft v Mass v.
Linear Programming Technical Supplement 3 Learning Curves Copyright © 2014 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2013 Nelson Education Ltd.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Learning Curve Analysis Supplement I Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall I - 01.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Learning Curves Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Introduction to Operations Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Productivity McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Capital Investment Analysis
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a.
Overhead and Marketing Variances
The Theory and Estimation of Cost
Principles of Accounting 2002e
Learning Curves Guanyi Lu November 27, 2018.
Fundamental Cornerstones of Managerial Accounting Chapter Six
Standard Costing and Variance Analysis
7S Learning Curves.
Learning and The Learning Curve
E Learning Curves PowerPoint presentation to accompany
Presentation transcript:

Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.

You should be able to: 1. Explain the concept of a learning curve 2. Make time estimates based on learning curves 3. List and briefly describe some of the main applications of learning curves 4. Outline some of the cautions and criticisms of learning curves 5. Estimate learning rates from data on job times Instructor Slides 7S-2

Learning curve The time required to perform a task decreases with increasing repetitions The degree of improvement is a function of the task being done Short, routine tasks will show modest improvement relatively quickly Longer, more complex tasks will show improvement over a longer interval Instructor Slides 7S-3

Instructor Slides 7S-4

The learning effect is attributed to a variety of factors: Worker learning Preproduction factors Tooling and equipment selection Product design Methods analysis Effort expended prior to the start of work Changes made after production has begun Changes in work methods Changes in tooling and equipment Managerial factors Improvements in planning, scheduling, motivation, and control Instructor Slides 7S-5

The learning effect is predictable The learning percentage is constant Every doubling of repetitions results in a constant percentage decrease in the time per repetition Typical decreases range from 10 to 20 percent Instructor Slides 7S-6

Instructor Slides 7S-7

7S-8 90% learning percent means 10% decrease in unit time with each doubling of repetition 80% learning percent means 20% decrease in unit time with each doubling of repetition Question: What does 100% learning percent imply?

7S-9

Each time cumulative output doubles, the time per unit for that amount should be approximately equal to the previous time multiplied by the learning percentage. If the first unit of a process took 100 hours and the learning rate is 90%: UnitUnit Time (hours) 1= (100)= (90)= (81)= (72.9)= (65.61)= Instructor Slides 7S-10

Instructor Slides 7S-11

If the learning rate is 90, and the first unit took 100 hours to complete, how long would it take to complete the 25 th unit? Instructor Slides 7S-12

The learning factor approach uses a table that shows two things for selected learning percentages: Unit value for the number of repetitions (unit number) Cumulative value, which enables us to compute the total time required to complete a given number of units. Instructor Slides 7S-13

If the learning rate is 90, and the first unit took 100 hours to complete, how long would it take to complete the 25 th unit? How long would it take to complete the first 25 units? Instructor Slides 7S-14

7S-15 A contract calls for the production of 20 jets. The initial unit required 400 days of direct labor. The learning percent is 80%.

7S-16 Q1: Calculate the time of the 5 th unit Approach 1 – using the formula

7S-17 Q1: Calculate the time of the 5 th unit Approach 2 using the learning Curve Coefficients table (7S-1, page 346)

7S-18

7S-19 Q2 – Expected time for the 20 th jet T 20 = (400) X (.381) = labor days Q3 – Expected total time for all 20 jets T 1-20 = (400) X (10.485) = 4,194 labor days Q4 – Average time per jet: Average time = 4,194/20 = labor days

7S-20 Given T 2 = 10 and 80% learning percent, find the expected time for the 5 th unit T 2 = 10 = T 1 X (.8) T 1 = 10 /.8 = 12.5 T 5 = 12.5 X = 7.45

Useful application areas: 1. Manpower planning and scheduling 2. Negotiated purchasing 3. Pricing new products 4. Budgeting, purchasing, and inventory planning 5. Capacity planning Instructor Slides 7S-21

1. Learning rates may differ from organization to organization and by type of work Base learning rates on empirical studies rather than assumptions where possible 2. Projections based on learning curves should be regarded as approximations of actual times 3. Because time estimates are based on the first unit, care should be taken to ensure that the time is valid 4. It is possible that at some point the curve might level off or even tip upward Instructor Slides 7S-22

5. Some of the improvements may be more apparent than real: improvements in times may be caused by increases in indirect labor costs 6. In mass production situations, learning curves may be of initial use in predicting how long it will take before the process stabilizes The concept does not usually apply because improvement in time per unit is almost imperceptible Instructor Slides 7S-23

7. Users of learning curves fail to include carryover effects from previous experiences 8. Shorter product life cycles, flexible manufacturing, and cross-functional workers can affect the ways in which learning curves may be applied Instructor Slides 7S-24

Learning curves have strategic implications for: Market entry when trying to rapidly gain market share As volume increases, operations is able to move quickly down the learning curve Reduced cost  improved competitive advantage Useful for capacity planning Can lead to more realistic time estimates, thus leading to more accurate capacity needs assessment Instructor Slides 7S-25