Evaluation of Potential Impacts of Uranium Mining on Drinking Water Sources in the Roanoke River Basin Assessment Approach Presentation to Roanoke River.

Slides:



Advertisements
Similar presentations
Use of reference biospheres to prove long-term safety of repositories for radioactive waste Workshop, Berlin, August 2008.
Advertisements

Use of a hydrodynamic model to
Hydrologic Statistics
CHARACTERISTICS OF RUNOFF
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
Rainfall Climatology Average annual precipitation 30-year normal precipitation.
Continuous Hydrologic Simulation of Johnson Creek Basin and Assuming Watershed Stationarity Rick Shimota, P.E. Hans Hadley, P.E., P.G. The Oregon Water.
Upper Brushy Creek Flood Study – Flood mapping and management Rainfall depths were derived using USGS SIR , Atlas of Depth Duration Frequency.
Issues Surrounding Uranium Mining in Pittsylvania County, VA Virginia Conservation Network Environmental Assembly 2010 Environmental Assembly 2010 September.
Lecture ERS 482/682 (Fall 2002) Precipitation ERS 482/682 Small Watershed Hydrology.
Start Audio Lecture! FOR462: Watershed Science & Management 1 Streamflow Analysis Module 8.7.
Regional Climate Change Water Supply Planning Tools for Central Puget Sound Austin Polebitski and Richard Palmer Department of Civil and Environmental.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Kostas Andreadis1, Dennis Lettenmaier1, and Doug Alsdorf2
Apalachicola/Chattahoochee/Flint Focus Area - USGS WaterSMART NIDIS SE Climate Forum Lake Lanier Islands, GA December 2, 2011.
Hydrological Modeling FISH 513 April 10, Overview: What is wrong with simple statistical regressions of hydrologic response on impervious area?
HEC-RAS.
Extreme Value Analysis, August 15-19, Bayesian analysis of extremes in hydrology A powerful tool for knowledge integration and uncertainties assessment.
Climate, Change and Flood Planning CCTAG April 2013.
Kansas City Industrial Council Hydrology and Hydraulics
Water Management Presentations Summary Determine climate and weather extremes that are crucial in resource management and policy making Precipitation extremes.
Analyses of Rainfall Hydrology and Water Resources RG744
Green River Water Rights Distribution Model (MODSIM) Update By Division of Water Rights
FNR 402 – Forest Watershed Management
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
DICKINSON BAYOU WATERSHED GALVESTON COUNTY, TEXAS Jason Christian, P.E. National Flood Workshop October 24-26, 2010 – Houston, Texas PROBABILISTIC FLOODPLAIN.
Evaluation for the Effects of Flood Control
Prospects for river discharge and depth estimation through assimilation of swath–altimetry into a raster-based hydraulics model Kostas Andreadis 1, Elizabeth.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Analysis of Raleigh’s Drought Triggers May 8, 2013 and.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment SedFlume.
Analysis of Slide Impacts on the North Fork Stillaguamish River Floodplain For Snohomish County May 5, 2014.
Uranium Mining in Roanoke River Basin Presentation to Virginia Beach City Council November 25, 2008.
Design Guidance for Low-water Crossing in Gravel Rivers Xing Fang Lamar University.
Water resources engineering Giannis Kleopa. What is a water resources engineering? Water resources engineering is the profession that is responsible for.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
HEC-RAS Version 3.1 Overview
Flooding. A Spring Green Community Forum Flooding in Spring Green: A Community Forum We have listened very closely to your concerns, questions and issues.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Surface Water Virtual Mission Dennis P. Lettenmaier, Kostas Andreadis, and Doug Alsdorf Department of Civil and Environmental Engineering University of.
Hydrological Forecasting. Introduction: How to use knowledge to predict from existing data, what will happen in future?. This is a fundamental problem.
Tim Cohn USGS Office of Surface Water Reston, Virginia Flood Frequency Analysis in Context of Climate Change.
Potential for estimation of river discharge through assimilation of wide swath satellite altimetry into a river hydrodynamics model Kostas Andreadis 1,
INTRODUCTION TO ENVIRONMENTAL MODELING. EIA Scientific Tools and Techniques2 Lesson Learning Goals At the end of this lesson you should be able to: 
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.
CONEWAGO CREEK GROUND WATER STUDY Base Flow and Impervious Cover November 7, 2007 Watershed Alliance of Adams County Joe McNally, P.G. GeoServices, Ltd.
Virginia Smith CE397 – Spring 2009 Sediment in the Trinity River Basin 1 Virginia Smith CE 397.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Sanitary Engineering Lecture 4
Analyses of Rainfall Hydrology and Water Resources RG744 Institute of Space Technology October 09, 2015.
HEC-ResSim 3.3 New Features to Support Complex Studies
Presentation to Roanoke River Basin Bi-State Commission March 31, 2010
Agriculture University in Kraków Department of Water Engineering
Precipitation-Runoff Modeling System (PRMS)
Looking for universality...
Hazards Planning and Risk Management Flood Frequency Analysis
Precipitation Analysis
Hydrologic Statistics
Overview of Models & Modeling Concepts
Surface Water Virtual Mission
Flood Frequency Analysis
Lower Susquehanna River Watershed Assessment
Floods and Flood Routing
Preciptation.
WRE-1 BY MOHD ABDUL AQUIL CIVIL ENGINEERING.
Enforcement Advocacy Stewardship Education
Presentation transcript:

Evaluation of Potential Impacts of Uranium Mining on Drinking Water Sources in the Roanoke River Basin Assessment Approach Presentation to Roanoke River Basin Bi-State Commission March 31, 2010

Background Uranium in Virginia – Leases were issued for uranium mining in the past – Coles Hill site in Pittsylvania County may have a large reserve – Uranium reserves are located upstream of drinking water supplies – Communities are concerned that uranium mining may impact their drinking water sources

Climate and landscape features in Virginia produce much greater precipitation than western US. Why the concern?

Project Description Coles Hill

Probable Maximum Precipitation Events in Virginia – Nelson County – August – 31 inches in 8-hours – Madison County – June inches in 14 hours

Extreme Flooding and PMP Events Average stream flow in VA – 1 cfs per square mi USGS Extreme Floods – 50 to 300 cfs per square mi

Project Description Phase I Assessment: – Assume a PMP-type catastrophe and sediment release – Estimate of contaminated sediment to reach Kerr Reservoir – Assess potential increase in background radiation levels in Kerr Reservoir Phase II Assessment: – Detailed analysis based on Phase I results (if deemed necessary).

Project Description Phase I Assessment: – Banister and Roanoke Rivers will be modeled – One-dimensional numerical model will be used – CCHE1D: National Center for Computational Hydroscience and Engineering (NCCHE) at the University of Mississippi – CCHE1D simulates unsteady flows and sediment transport in dendritic channel networks – CCHE1D also simulates transport and fate of radionuclide's

Project Description Phase I Assessment: – A number of containment failure scenarios will be run to represent: Release quantities - small and large Release durations – short and long – HEC-RAS model will also be run to address model uncertainty in sediment transport – Model will assume certain amounts of sediment release from hypothetical catastrophe – Phase 1 to be complete in Fall 2010

Banister River Watershed

Dan River Watershed

Roanoke River Watershed

One Dimensional Modeling Objectives Following a hypothetical PMP-event which releases certain quantities of mill tailings and effluents into the Banister or Roanoke Rivers: What amount of radionuclide-contaminated sediment and water might reach Kerr Reservoir? In the short term (i.e. during the high-flow caused by the extreme precipitation event that triggered the failure) and In the long term (during subsequent high-flow events of lesser magnitude, but higher frequency) What would be the potential increase in background radiation levels and other contaminants levels in Kerr Reservoir?

SENSITIVITY ANALYSIS Modeling parameters: Manning’s roughness, adaptation coefficient, sediment transport capacity formula, etc. Meteorological Parameters: Two different extreme events (500-yr & 100-yr storm events will be considered for short-term impact simulations) Small and large released tailings Short and long duration releases This sensitivity analysis will provide information about the relative impact of each variable on the results.

UNCERTAINTY ANALYSIS Three variables will be considered: Volume of the sediment released Initial radioactivity level of the tailings and the effluents The distribution coefficient, K d.

Independent Expert Review Panel Specialized in key disciplines:  Uranium Milling/Disposal of Milling Waste/Geotechnical  Surface/Sub-Surface Water Contamination  Sediment Transport, Unsteady Hydrodynamic Modeling  Hydrology  Water Chemistry/Treatment Assist in development of the approach for the Phase 1 Review adequacy of data collected, critique the assumptions and the Phase 1 assessment design Review, Critique and Evaluate Phase 1 report and conclusions