Managing Roanoke’s Stormwater Infrastructure Challenges.

Slides:



Advertisements
Similar presentations
STORMWATER UTILITY PRESENTATION December The City of Salisbury relies on over 60 miles of storm water pipes to control flooding. There are more.
Advertisements

What is a Storm Water Utility? A storm water utility is a method of financing the administration, planning, implementation and maintenance of storm water.
4/7/2015 Workshop: Development Sustainability & Stormwater Planning/Design Stormwater Infrastructure Financing: Getting Decision Makers on Board Mike Hall,
Tymber Skan Update Orange County BCC August 5, 2014.
Mechanicsburg Borough Town Hall Meeting October 15, 2014 STORM WATER AND STREET INFRASTRUCTURE.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
1. 2 Municipal Management Districts (MMD) are special districts that are: Self governed, but must be approved by the host municipality; and have the.
Beyond ERUs: Sustainable Stormwater Finance SC Stormwater Forum Jeff Hughes, Environmental Finance Center (919)
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Briefing Purpose 2 To submit the amended FY11 City Manager’s proposed FY10/FY11 Biennium Operating Budget and NEW five-year Capital Improvement Plan (CIP)
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
District of Columbia Stormwater Fees October 27, 2008 Apartment and Office Building Association of Metropolitan Washington Brendan Shane DDOE Office of.
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
FY2016 Proposed Budget March 17, Fiscal Year 2016 Proposed General Fund Budget $133.4 million No Tax Rate Increase Proposed Current Rate:
1 Storm Water Utility City of Durand. 2 Storm Water Runoff Rainwater flows across streets, parking lots, driveways, lawns Pollutants are picked up by.
State Financing Programs for Brownfield Redevelopment.
Financing Your CIP …and Planning Ahead for New O&M.
2014 Budget Department Presentations Infrastructure Funding Options.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
1 Impact Fees in Virginia Virginia Municipal League Annual Conference October 15, 2007 Jeffrey S. Gore Hefty & Wiley, P.C.
Providing world-class services for our customers and our environment March 2014 Stormwater Costs of Service and Rates.
Drainage Task Team Volusia County Public Works Judy Grim, P.E. Road and Bridge Director.
1. 2 Managing stormwater Stormwater runoff is generated when rain and snowmelt flows over land or impervious surfaces and does not percolate into the.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
March 12 th, 2013 Stormwater Rate Structure Discussion.
Community Meeting Atwater, California CFD 1-90 July 30, 2009.
FY Budget Briefing General Fund Operating Budget and Fees & Charges.
Julie Conroy, AICP, Senior Environmental Planner Metropolitan Area Planning Council.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
OVERVIEW Current Ordinance Has to Change Property Owners That Do Not Use The System Should Not Pay Property Owners That Use The System Receive a Benefit.
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Pennsylvania’s newest tool… Stormwater Management Authorities.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Overview Fiscal Year 2015 Recommended Operating Budget City Council Work Session March 25, 2014 City Manager and the Department of Budget & Evaluation.
City Council Meeting Presentations.  Part I – Regulations and Terminology May 17, 2011  Part II – Revenues June 7, 2011  Part III – Fund Descriptions.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
What are they and how are they calculated? May 2015.
1 City of Cocoa Michael Burton - President Andrew Burnham - Senior Vice President Ashley Venturoni – Project Consultant Presented by: FY 2013 Water, &
1 Transportation Impact Fees and Street Maintenance Fees Presented to the City Council by the Planning and Development Department January 21, 2010.
WHAT THEY ARE AND WHY WE NEED THEM.  What is Stormwater Management?  Storm Water Utilities.
The Town of Fort Myers Beach Stormwater Utility: Frequently Asked Questions Prepared by Tetra Tech September 2015.
City Council Storm Water Presentation March 6, 2014.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
1 Budget Presentation Fiscal Year 2011 May 10, 2010.
Storm Water Management A report to City Council March 2006.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Stormwater Utility City of Rowlett
Jefferson County Planning Commissioners Hearing June 26, 2013
Storm Water Utility City of Durand.
Fund Accounting Overview
Water and Wastewater Rates
CITY OF NEW SMYRNA BEACH
City of Madras System Development Charges
Presented by: Deborah Early Icenogle Seaver Pogue, P.C.
Rate Commission Meeting
December 10, BUDGET PRESENTATION.
The Wausau Wastewater Treatment Facility
Stormwater Local Assistance Fund
Stormwater Local Assistance Fund
2019 Second Quarter Financial Report Period Ending June 30, 2019
Presentation transcript:

Managing Roanoke’s Stormwater Infrastructure Challenges

City of Roanoke – Engineering Division Stormwater Utility Fee What is a stormwater utility fee? Why is it needed? How will I be affected?

City of Roanoke – Engineering Division Stormwater Fee A stormwater fee (or utility) is similar to electric, telephone or cable TV charges. Fees are collected for specific services provided. Roanoke City Council authorized staff to develop a stormwater fee framework on July 20, 2009 City Council will consider the program in late fall 2009 Public Hearings will be held – November-December Planned adoption in early 2010

City of Roanoke – Engineering Division Dedicated Special Revenue Dedicated to Operation and Maintenance of public stormwater systems Real Property for capital improvements Engineering design Construction costs Monitoring of control devices Regulatory compliance and enforcement Pollution control and abatement Maintenance of stormwater facilities Program Administration

City of Roanoke – Engineering Division Stormwater Fee All developed properties contribute runoff and pollutants Fees are assessed in proportion to a property’s contribution to runoff Runoff is proportional to Impervious Surface Municipal Separate Storm Sewer System (MS4) is regulated for water quality Service area is the City of Roanoke

City of Roanoke – Engineering Division Stormwater Fee - Background Roanoke has 13 major rivers and streams 9 of these are listed as impaired for water quality by the Department of Environmental Quality (DEQ) The amount of runoff is related to the amount of impervious surface, that is, roofs, driveways, parking areas Runoff carries pollutants to our rivers and streams

City of Roanoke – Engineering Division Stormwater Fee Roanoke’s storm drain system is aging and has numerous improvement needs No major storm drain improvement projects have been undertaken in more than a generation Nearly 200 projects have been identified Current management approach may not allow Roanoke to meet minimum water quality standards There is an urgent and compelling need to upgrade Roanoke’s stormwater system immediately

City of Roanoke – Engineering Division Stormwater Fee Current budget provides funding for only most urgent issues Proposed stormwater fee provides necessary financial resources to protect the city’s water quality now and in the future Water quality improvement is a community responsibility. We all contribute to the problem, and we all need to work together on the solution

City of Roanoke – Engineering Division Roanoke’s Identified Stormwater Needs Capital Improvements $60+ million, approximately 200 projects Maintenance and repair of aging infrastructure Stormwater quality regulatory requirements for MS4 –VPDES Permit –TMDL –Impaired waterways

City of Roanoke – Engineering Division Typical Drainage Issues Delaware Avenue

City of Roanoke – Engineering Division Typical Drainage Issues Fresno Street

City of Roanoke – Engineering Division Typical Drainage Issues Cove Road Beverly Boulevard

City of Roanoke – Engineering Division Typical Drainage Problems Old Mountain Road Melrose Avenue

City of Roanoke – Engineering Division Proposed Stormwater Utility Cash funded program based on collected revenue Capacity to implement $3.0 million in new projects annually Build a maintenance reserve (5%) Offer incentives and /or credits for those willing to go beyond regulatory requirements or retrofit existing facilities

City of Roanoke – Engineering Division Proposed Projects Projects have been identified for the first three years of the program –Neighborhood Projects –Average project value $105,000 An incremental approach to correcting our stormwater problems

City of Roanoke – Engineering Division Projects $2.7M Projects $2.7M

City of Roanoke – Engineering Division Projects $2.9M

City of Roanoke – Engineering Division Projects $2.7M

City of Roanoke – Engineering Division Shovel Ready Projects Camille Avenue-Moomaw Avenue Westside Boulevard Andrews Road King Street and Belle Avenue

City of Roanoke – Engineering Division Program Outline $3.00 per month per Equivalent Residential Unit (ERU) for residential properties Non-residential properties will be assessed on the measured impervious surface –$3.00 per month per 1,920 square feet of impervious surface Estimated annual revenue $3.6 million 1/3 residential, 2/3 non-residential

City of Roanoke – Engineering Division Current Stormwater Utilities in Virginia LocalityNPDES Phase I / Phase II Single-Family Residential Stormwater Fee (per month) Non-residential Stormwater Fee (per month) Total Annual Revenue Generated City of Norfolk, VA Phase I$8.08Non-Residential - $8.08/2000 ft2 of impervious area/day $10.6 million City of Virginia Beach, VA Phase I$6.05$6.05 per 2,269 sq. ft. of impervious area $15.0 million City of Portsmouth, VA Phase I$6.00$6.00 per 1,877 sq. ft. of impervious area $4.6 million City of Newport News, VA Phase I$5.10$5.10 per 1,777 sq. ft. of impervious area $8.5 million City of Hampton, VA Phase I$4.60$4.60 per 2,429 sq. ft. of impervious area $4.8 million City of Chesapeake, VA Phase I$6.83$6.83 per 2,112 sq. ft. of impervious area $6.2 million HRPDC/City of Suffolk Phase II$5.24$5.24 per 3,200 sq. ft. of impervious area $3.5 million

City of Roanoke – Engineering Division Proposed Stormwater Utility All developed properties pay the fee Exemptions –Follow the state code for required exemptions, generally public streets and City property –Vacant unimproved properties –“Self contained” drainage systems

City of Roanoke – Engineering Division Proposed Stormwater Utility Credits and Incentives –Development –Existing Properties Stormwater management facilities that exceed minimum requirements Credits must be proportional to the permanent reduction in runoff and pollutant loading

City of Roanoke – Engineering Division Schedule Milestones Authorize formal development July 20, 2009 Verify utility rates and revenues July - Oct 2009 Develop Credits and Incentives July – Oct 2009 Public Education/Information Sept – Nov 2009 Interim Progress Briefing Nov 2, 2009 Authorize public hearings Hold Public Hearings Dec 2009 Adopt Ordinance Jan 4, 2010 Begin Project Construction 1 st Quarter 2010

City of Roanoke – Engineering Division Issues We’ve Heard $3M/year will take too long to take care of $60M needs list. Why a new fee? Why not finance these projects with bond funds instead of doing other bond-funded projects like the amphitheater since City can't incur additional bonded debt for years to come. The average home-owner can't take on any more taxes or fees in this recession. Instead of calling it a fee, it needs to be called a tax so that it can be considered as a tax deduction. If property owners qualify for stormwater utility exemptions, will the public be able to FOIA this information to see who is getting these credits? If property owners apply for exemptions, will there be a timely review or an extensive wait? What is the potential for rates to continue to rise? If two-thirds of the program revenue will be paid by commercial and other nonresidential properties, those costs will simply be passed along to the consumers (i.e. residents). In other Virginia cities that have a storm water utility fee, do any provide exclusions for charitable agencies?

City of Roanoke – Engineering Division Issues We’ve Heard Are gravel parking lots considered pervious? This program seems to discourage paving those lots. The program should be, as discussed, accomplished without the addition of any additional employees or consultant expense. If credits are given for retrofit or extraordinary measures, there should be a method for timely, rapid evaluation and award. Impervious, as the primary basis for evaluation, should be fully defined in the new ordinance. The definition would eliminate possible ambiguity and legal testing. Churches, non-profits and businesses with extremely large exposure should be afforded and opportunity to phase this expense over a few years. The City should adopt codes and building standards that demand efficient storm water management and runoff reduction. Let’s not have to ask future generations to pay for our timidity, laziness or ‘politically’ directed engineering.