Non-Native Species in the Antarctic Workshop 10, 11 & 12 April 2006.

Slides:



Advertisements
Similar presentations
Sharon Gross U.S. Fish and Wildlife Service The U.S. Invasive Species Management Plan.
Advertisements

Invasive Species as a Trilateral Challenge Preventing the Introduction and Spread of Aquatic Invasives Species in North America Commission for Environmental.
ISPM 6: Guidelines for Surveillance
FOREST EUROPE Preparing the Sixth Ministerial Conference, including a possible legal instrument on forests EFI Annual Conference 15 September 2010, Dresden,
1 The Management of Invasive Species in Marine & Coastal Environments Module 6 The International Response.
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Risk Assessment and Prioritisation for Invasive Species John Kelly.
Risk and RACI: Defining Clear Roles
Introduction: Towards an Integrated Reporting System for Marine Protected Areas in the Baja to Bering Sea (B2B) Commission for Environmental Cooperation.
1 Brian Elliott Senior Project Officer for Environmental Protection European Policy Update. ESA Workshop 25th January 2010.
1 Bill C-42 Antarctic Environmental Protection Act Standing Committee on Energy, the Environment and Natural Resources September 2003.
Workshops for implementing the Strategic Plan for Biodiversity through the National Biodiversity Strategies and Action Plans Module 2 The Biodiversity.
THE EUROPEAN ENVIRONMENT STATE AND OUTLOOK 2010 Thomas Henrichs European Environment Agency.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Module 2: laying the foundations for effective national frameworks Developing legal and institutional frameworks for invasive alien species.
Introduction to Pest Risk Assessment. Presentation Overview  Purpose of Pest Risk Analysis (PRA)  Principles of Pest Risk Analysis  Components of Pest.
Britta Bierwagen 1, Roxanne Thomas 2, Kathryn Mengerink 2 & Austin Kane 2 1 Global Change Research Program National Center for Environmental Assessment.
OBLIGATIONS TO PROTECT MARINE ECOSYSTEMS UNDER INTERNATIONAL CONVENTIONS AND OTHER LEGAL INSTRUMENTS Transform Aqorau Scientific Symposium of the Reykjavik.
1 Biodiversity: A priority issue for business ?. 2 Outline  What is biodiversity and what is the problem?  Why is it an issue for businesses?  What.
GEF Expanded Constituency Workshop Windhoek, Namibia February 17-18, 2015 GEF 6 Programming Strategic Plan for Biodiversity,
1 The Management of Invasive Species in Marine & Coastal Environments Module 7 Developing a National Strategic Framework.
Natural England State of the Natural Environment, Strategic Direction refresh, and Manifesto Dr Helen Phillips, Chief Executive, Natural England.
1 The Management of Invasive Species in Marine & Coastal Environments Module 2 Goals & Principles of Invasive Species Management.
WWF – World Bank Management Effectiveness Tracking Tool What is Management Effectiveness Evaluation? Sue Stolton.
Non-Native Species in the Antarctic Workshop 10, 11 & 12 April 2006.
Workshop on Programming in support of Anti-Corruption Agencies Bratislava, 30 June - 1 July 2009 A methodology for capacity assessment of AC agencies:
1 History of the Environmental EU Legislation EU Environmental Legislation 2.VII.2008 Warsaw, Poland “Business Support Programme for Bulgaria, Romania,
INTERNATIONAL UNION FOR CONSERVATION OF NATURE Preparing Component Programmes January 2011.
Implementation of TARGET 2 of the EU 2020 Biodiversity Strategy Claudia Olazábal Unit – Biodiversity DG ENV European Commission Nature Directors Meeting.
A Decade of Working Together on Conservation & Sustainable Use of Canada’s Natural Assets CBS endorsed by FPT Ministers in April 1996 Federal, provincial,
Eight key directions for science in CI. Biome coverage of our baseline biodiversity data Currently: largely terrestrial alone Direction: terrestrial +
A Terrestrial Observing Network for local and continental management An Environmental Manager’s Perspective Images © Antarctica New Zealand Pictorial Collection.
Module 6 Early Detection and Rapid Response. Learning outcomes By the end of this module you should be able to: –Understand the role of early detection.
GiSP and the Convention on Biological Diversity ________________________________________ CBD requests to GISP - and the likely implications.
Module 5 Prevention. What is Prevention? –Minimizing the risk of moving alien species to countries or ecosystems where they may become invasive.
National Vulnerability and Risk Assessments Questions for Consideration (1) Tuesday, 24 th June th EIONET Workshop on Climate Change Impacts, Vulnerability.
Promoting Regional Green Development BRUNEI DARUSSALAM’S BRUNEI DARUSSALAM’SPERSPECTIVE ASEAN-China Environmental Cooperation Forum Naning, China 22 October.
Australia’s Import Risk Analysis Process Compared and Contrasted Mary Harwood Executive Manager Biosecurity Australia.
FSC National Standards Transfer Process The South African approach in summary January, 2016.
Economics in support of biodiversity conservation policy The EC experience Expert Workshop on Biodiversity and Economics, EEA 5 October 2006 Alexandra.
Working Group on Invasive Alien Species First meeting, 12 th June, 2015 Brussels Colette O’Flynn, Ireland.
Upcoming EU Regulation on Invasive Alien Species European Commission DG Environment MEETING OF THE STRATEGIC CO-ORDINATION GROUP FOR THE WFD COMMON IMPLEMENTATION.
The Convention on Biological Diversity Progress report Marjo Vierros Secretariat Convention on Biological Diversity ICRI General Meeting Palau, 31 October.
Thematic priorities Life sciences, genomics and biotechnology for health Nanotechnology Aeronautics Food quality and safety Sustainable development, global.
Regional Training – Legal Implementation of the Ballast Water Management Convention focusing on Compliance Monitoring and Enforcement 16 – 17 November.
LAW IS ORDER, AND GOOD LAW IS GOOD ORDER: THE ROLE OF GOVERNANCE IN THE REGULATION OF INVASIVE ALIEN SPECIES Dr Sophie Riley University of Technology Sydney.
University of Greenwich
European Policy Update.
Sustainable Development Goals (SDGs) and implications for South Africa
The Biodiversity and Protected Areas Management (BIOPAMA) Programme
NATIONAL REDD+ SECRETARIAT
Guidance on Natura 2000 and Forests – Scoping Document
EU Biodiversity Strategy to 2020 Towards implementation & monitoring
AN INTRODUCTION TO THE IUCN RED LIST OF ECOSYSTEMS
National Environment Policy Presentation
NGO priorities for environmentally sustainable aquaculture in the EU Ann Dom, Deputy Director Dublin workshop April 2014.
Invasive Alien Species Working Group 1 - Prevention
Task 1.2 Review existing and new financing instruments relevant for MSFD implementation.
Development of IAS policy Institutional state of play 3 September 2010
Report of the Strategic Plan Review Working Group Bruno Frachon
Water and Marine Directors meeting Spa, 2-3 December 2010
Council’s Biosecurity objectives and aspirations
THE POINTS OF GOAL 15 : Sustainably manage forests;
What is the place for biodiversity in the Catalan 2030 Agenda?
European Commission DG Environment 18th meeting of CGBN
EU strategy on invasive alien species
The Biodiversity and Protected Areas Management (BIOPAMA) Programme
Green infrastructure developments at EEA 2018
The Invasive Alien Species Regulation State of play
Introduction to biodiversity
Presentation transcript:

Non-Native Species in the Antarctic Workshop 10, 11 & 12 April 2006

Group 1, (Green badges) Chair: Dr. Alan Hemmings Reporter: Catherine Tisch

1)PREVENTION OF INTRODUCTIONS INTO THE ANTARCTIC (FROM OUTSIDE ANTARCTIC). DID NOT ADDRESS – FELT IT HAD BEEN WELL COVERED IN PRESENTATIONS a)Terrestrial / freshwater b) Prevention of marine introductions of non-native species into

2) PREVENTION OF SPREAD WITHIN THE ANTARCTIC ONCE NON -NATIVE ORGANISMS HAVE ARRIVED DID NOT ADDRESS

3) PREVENTION OF INTRODUCTION OF SPECIES THAT ARE NATIVE IN THE ANTARCTIC TO OTHER AREAS IN THE ANTARCTIC WHERE THEY ARE NOT NATIVE Pathways/taxa/situations/geographic areas include:Pathways/taxa/situations/geographic areas include: Marine- Circumpolar traffic between ports and bays; introductions via fouled vessels, small boats (tourism and science)Marine- Circumpolar traffic between ports and bays; introductions via fouled vessels, small boats (tourism and science) Transport of simpler life forms over terrestrial landscapes and inland waters such as isolated regions of the Dry Valleys or isolated nunataks, via hiking, surface vehicles (ATV’s), camping, sampling, air trafficTransport of simpler life forms over terrestrial landscapes and inland waters such as isolated regions of the Dry Valleys or isolated nunataks, via hiking, surface vehicles (ATV’s), camping, sampling, air traffic Currently, risk is addressed via case-specific EIA, management practices which have been established for specific regions; ASMA, ASPA; national legislation and practiceCurrently, risk is addressed via case-specific EIA, management practices which have been established for specific regions; ASMA, ASPA; national legislation and practice

3) (cont). Gaps and means to address:Gaps and means to address: Establish baseline conditions, via reporting and information sharing Establish baseline conditions, via reporting and information sharing -Reporting vectors within continent from all operators and science parties -Define biogeographical boundaries -Determining relative isolation of biogeographic regions Risk assessment Risk assessment Increase awareness, which leads to cooperation and action. Develop Vessel Monitoring System beyond CCAMLR Increase awareness, which leads to cooperation and action. Develop Vessel Monitoring System beyond CCAMLR

4) PREVENTION OF INTRODUCTION OF ANTARCTIC SPECIES INTO OTHER AREAS (that is, NORTH of the AT area) WHERE THEY ARE NOT NATIVE Pathways: ● Ballast water and tank sediment (esp. Arctic) ● Soil, propagules on equipment, containers vehicles, waste ● National operator + tourist traffic linking Ant and sub-Ant ● Airlinks, ● IUU Addressed by ATS/other instruments: No formal obligations, general biosecurity obligations by state Gaps: ● Genome recycling (sub-glacial lakes, anthrax, spanish flu virus) ● Lack of standard approaches and guidelines to quarantine ● Disease on sub-Ant territory may impact on local economy

5)PROTECTION OF ANTARCTIC VALUES AGAINST NON-NATIVE SPECIES IMPACTS, WHAT ARE WE TRYING TO ACHIEVE? 1) Generate list high value/high risk areas (HMI,PEI models) 2) Set standards and precedents-proactive rather than reactive 3) Avoid degrading the environment Ramifications- Need to acquire baseline data, management procedures, caveats: selling this will not be easy, marine environments particularly difficult How to increase awareness- Ideas- Assemble information from states with ongoing biosecurity programs, examples from subantarctic, work with stakeholders from beginning Implementation- Bring to the attention of Antarctic bodies- SCAR Open Science, SCAR subantarctic conf., Census Antarctic Marine Life, regional bodies. Target information to “low awareness” states Raise awareness with field groups, tourism, others etc.

6) LEGAL / INSTITUTIONAL ISSUES. Goes beyond just the ATS – important as that is Within ATS: graduated response – step 1 Guidelines 2006 – establishment ICG through CEP (scoping issues) 2007 – report back to CEP – risk assessment (SCAR, state or states?) 2009 – advice to ATCM, draft guidelines 2010 – guidelines (and any associated Measure?)  Biosecurity expertise into national positions/delegations?  Engagement with extra-ATS institutions  Using existing tools – Protected Areas & EIA systems

7)SCIENCE AND RESEARCH What do we need to know for management & conservation? Baseline biodiversity and how it is distributedBaseline biodiversity and how it is distributed What values do we want to protect?What values do we want to protect? What are the values at risk? Places at risk?What are the values at risk? Places at risk? Risk Management - relative risk of IAS vs. other management priorities; cost-benefit analysesRisk Management - relative risk of IAS vs. other management priorities; cost-benefit analyses How to balance risk management vs. scientific researchHow to balance risk management vs. scientific research Priorities for increased efforts? Taxonomic expertiseTaxonomic expertise Baseline biodiversity and how it is distributedBaseline biodiversity and how it is distributed Risk Assessment - quantifying vectors, pathways, consequences, likelihoodRisk Assessment - quantifying vectors, pathways, consequences, likelihood Protecting areas – how many? how big?Protecting areas – how many? how big? Sharing existing knowledgeSharing existing knowledge

8) FUTURE CONSIDERATIONS New pathways: ● New bases, tourist/science activities and sites, logistic lines ● Autonomous rovers, unmanned aircraft, balloons ● Globally distributed GMOs/nano particle hybrids Conflicts: ATS (terrestrial), CCAMLR (marine); ATS/non-ATS Climate change: ● New colonisation sites – marine (extinctions?); terrestrial (extended range, alien species life cycle completion) ● New sites for human activities – science/bases/logistics ● Persistent aliens become invasive aliens New threats for research and logistics: Key service (algal blockage), science + intrinsic values, reallocation of funds Appropriate strategies (eradication?, control?) ● Depends! ● Prepare contingency plans (rats). ● Marine environment a problem. ● New technologies may help medium term?

9) OTHER: Are there other questions which should be considered /addressed?  How we set priorities – not just between the risks posed by non-native species, but between this and other key env issues, given costs and opportunity costs posed?  What level of risk to accept?  How to technically conduct the risk analysis process (who, sources, uncertainties, etc)  How to arrive at agreed position across differing national/cultural norms of Antarctic states? (process issues within states, between states/IG and NG organisations and within CEP & SCAR)  How to fund

Summary of KEY Points: 1.Knowledge base (limited, needs development) 2.Risk Assessment – determining priorities 3.Timeline 1.To develop understanding that it is an issue 2.To acquire data 3.To develop responses