SYMPHOS Conference Industrial Management Segment May 10, 2013 Richard D. Harrison Professional Engineer – Florida, USA.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Slide 1 Are your Buildings Managing You? 2007 IASBO Conference May 16, 2007 Mike Steffens, Ameresco Jerry Brendel, Superintendent, Woodridge SD #68 Wendy.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
Operating under a lower G & A Carlos Garcia Owner/CEO KIRA National 8(a) Association Winter Conference 2015.
U.S. Conference of Mayors Urban Water Council Gulf Coast Water System Disaster Recovery June 29, 2006Walter Howard, SVP This document does not constitute.
Copyright Course Technology Chapter 11: Project Procurement Management.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Company overview Prepared for: MIT Class Construction Engineering and Management E-Commerce and the Internet in Real Estate and Construction By Jerome.
Name of the Nominee -ICAI Membership Number Name of the Nominee -ICAI Membership Number Category and Sub–Category of the Awards for which applying Category.
Profitability COPYRIGHT ©2007 Thomson South-Western, a part of the Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chapter 7 E-procurement
Profile CF industries is one of the leading Nitrogen fertilizer Producers in the U.S. CF is a significant producer of Phosphate fertilizer products as.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
A Typical Business Plan
Limited Proceedings Water & Wastewater Reference Manual1.
ARRA Project Oversight 2010 WTBA Contractor/Engineer Conference 1/21/2010.
L Q Earnings Conference Call April 30, 2009.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
CIVL202 Construction Engineering I Tutorial 5 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
King Fahd University of Petroleum & Minerals
Copyright © 2003 Pearson Education, Inc. Slide 11-0 Ch 11 Learning Goals 1.Operating, financial, and total leverage (causes & measures). 2.Business risk,
Documentation David M. Shapiro David M. Shapiro Disaster Planning and Recovery Consultants 4030 Wake Forest Road, Raleigh NC Tel: (919)
Copyright © 2008 by Robert B. Carton Value Systems, Value Chains and Value-Based Management The Essence of Organizational Performance Is the Creation of.
Research Report on Global and China Linear Accelerator Industry by QYResearch Group Explore all reports for “Machines & Equipment”
Contractor Alternate Design Serving the Public’s Best Interest.
Assessing a New Venture’s Financial Strength and Viability
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
BizBuilder Step 3: Business Plan Presentation. Entrepreneurship, 11 th Edition Mariotti and Glackin with NFTE © 2010 Pearson Education, Upper Saddle River,
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
10 W EEK P ROJECT S COPE OF S ERVICES March 13th, 2014.
بســــــــم الله الرحمن الرحيــــــــم. Chapter 7 Dr. Mohammed Owais Qureshi Hashmi.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
CITB Flexible and Structured Funds. IFR Objectives - CITB needs a new approach to funding that: Enables more employers to access the funding support Is.
Financial Statements A set of Financial Statements consist of four related accounting reports that summarizes the financial resources, obligations, profitability.
Profitability COPYRIGHT ©2007 Thomson South-Western, a part of the Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
Stock Market Terms What does everything mean?. 52-Week High The highest price for a stock during the past year.
Published :June 2016 Global Nitrogen Fertilizers Industry 2016 Market Research Report.
Published :June 2016 Global Solid Phosphate Fertilizers Industry 2016 Market Research Report.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
This presentation contains statements that are forward looking in nature and, accordingly, are subject to risks and uncertainties. Factors that could.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Global Feed Phosphate Market by Manufacturers, Countries, Type and Application, Forecast to 2022 Published: May 2017 Single User PDF: US$ 3480 No. of Pages:
Chapter 3: Cost Estimation Techniques
Third Quarter 2012 Earnings Conference Call October 18, 2012
Light Rail Transit Project
Estimating and Scheduling CEE 492
Cost Concepts and Design Economics
Potash Fertilizers Market Research Report- Forecast till 2023 Industry Survey, Growth, Competitive Landscape and Forecasts to 2023 PREPARED BY Market Research.
Heavy Duty Gantry Crane Manufacturer Algeria Rosava Engineering Group Connect With Rosava Engineering Group Web-
Entrepreneur Name/اسم رائد الأعمال
Chapter 3: Cost Estimation Techniques
CIVL 493 CONSTRUCTION MANAGEMENT
Chapter 3: Cost Estimation Techniques
Chapter 8 Profitability
Controlling Project Cost and Schedule
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
L 9 - Chapter 8 Profitability
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Richland Creek Water Supply Program Program Update
Chapter 3: Cost Estimation Techniques
Presentation transcript:

SYMPHOS Conference Industrial Management Segment May 10, 2013 Richard D. Harrison Professional Engineer – Florida, USA

2 Copyright Richard Harrison 2013 Richard Harrison ريتشارد هاريسون Professional Engineer مهندس محترف Began working in phosphate industry in 1990 for International Minerals and Chemicals بدأ العمل في مجال الفوسفات في عام 1990 للمعادن والكيماويات الدولية Have been working with PegasusTSI since 2006 العمل في بيجاسوس منذ ٢٠٠٦ عمان الأردن

3 Copyright Richard Harrison 2013 Business Activities: ◦ Process Studies ◦ Compare Alternatives ◦ Capital Cost Estimates ◦ Project Management ◦ Engineering ◦ Construction Management الأنشطة التجارية : ◦ عملية الدراسات ◦ مقارنة البدائل ◦ تقديا تكلفة راس المال ◦ ادارة المشاريع ◦ الهندسة ◦ إدارة البناء

4 Copyright Richard Harrison 2013 Most projects share these common steps: 1. Identify Scope 2. Document Scope 3. Issue Scope for Bid 4. Contractors Bid 5. Award Contracts 6. Track Progress 7. Complete Project معظم المشاريع تتواجد فيها العوامل المشتركه الاتية 1. تحديد نطاق المشروع 2. وثيقة المشروع 3. نطاق المشروع و المزايدة 4. المزايدة كمقاول 5. جائزة العقود 6. مسار المشروع 7. استكمال المشروع

5 Copyright Richard Harrison 2013

6

7

8

9

10 Copyright Richard Harrison 2013

11 Copyright Richard Harrison 2013

12 Copyright Richard Harrison 2013 Designed newest phosphoric acid reactor installed in USA for Simplot in Rock Springs, Wyoming تصميم أحدث مفاعل حمض الفوسفوريك أحدث مفاعل الولايات المتحدة الأمريكية في وايومنغ Designed newest phosphoric acid evaporators installed in USA for PCS Phosphates تصميم أحدث مبخرات حمض الفوسفوريك في الولايات المتحدة الأمريكية لفوسفات PCS

13 Copyright Richard Harrison 2013 The last phosphoric acid reactor installed in North America was designed in the offices of PegasusTSI in Tampa, Florida. It is a single tank design with built in flash cooler over the reactor. See next slide for photo. تم تصميم في مكاتبنا اخر مفاعل حامض الفوسفوريك المثبتة في أمريكا الشمالية في في تامبا بولاية فلوريدا. انظر الصفحة التالية للصور.

14 Copyright Richard Harrison 2013 Single Tank Reactor خزان مفاعل احادي Built in Flash Cooler لون فلاش مبني Lowest temperature variation أدنى درجة حرارة التغير

15 Copyright Richard Harrison 2013 مفاعل

16 Copyright Richard Harrison 2013 The last four phosphoric acid evaporators installed in North America were designed in the offices of PegasusTSI in Tampa, Florida. They included FSA recovery systems. See next slide for photographs. تم تصميم اخر اربعة مبخرات حمض الفوسفوريك في امريكا الشمالية وتم FSA باستخدام تقنية

17 Copyright Richard Harrison 2013 Photos compliments of The Roberts Company -

18 Copyright Richard Harrison 2013

19 Copyright Richard Harrison 2013 Define Project Objectives Define Alternatives +50%/-30% Cost Estimate Evaluate Alternatives Define Design Basis Size Equipment Request Equipment Quotes +30%/-20% Cost Estimate Material Quantities Refine Project Scope +/- 10% Cost Estimate Construction Fund Approval Detailed Engineering Order Long Lead Items 3 Dimension Model Review Request Contractor Bids Commissioning تحديد أهداف المشروع تحديد البدائل تقدير التكاليف +50%/-30% تقييم البدائل تحديد أسس التصميم حجم المعدات طلب معدات تقدير التكاليف +30%/-20% الكميات حدد نطاق المشروع تقدير التكاليف +/- 10% صندوق موافقة البناء الهندسة التفصيلية بنود النظام زمنية طويلة استعراض ثلاثي البعد نموذج طلب عدد المزايدات التكليف والتشغيل الأولي

20 Copyright Richard Harrison 2013

21 Copyright Richard Harrison 2013

22 Copyright Richard Harrison 2013  Total Installed Cost (TIC) exceeds plan  التكلفة الكلية المثبتة تتجاوزالخطة  Construction period takes longer than plan  فترة الإنشاء تتجاوز الخطة  Facilities do not achieve rated capacity  مرافق لا تحقق القدرة التقييمية  What is estimated impact of each month of delay?  ما هو تأثير المقدرة لكل شهر تأخير؟  About 5% of project cost per month  حوالي 5 ٪ من تكلفة المشروع في الشهر

23 Copyright Richard Harrison Location Risk موقع 2. Ore Quality Risk جودة 3. Logistics Risk سوقي 4. Operating Factor Risk التشغيل 5. Corrosion Risk تآكل 6. Reserve Life عمر 7. Investment Risk استثمار 8. Conclusions: Morocco is low risk

24 Copyright Richard Harrison 2013 Why should new fertilizer projects be considered? CompanyNet Profit / Sales CF Industries30.3% OCP29.0% Potash Corp26.2% Eurochem24.4% Mosaic17.4% Yara12.6% Agrium 9.0% Average21.3%

25 Copyright Richard Harrison Engineer DataTotalJacobsURSFluorWoodWorleyTechnipSNC L.KBRShaw Total Employees Revenue ($MM) Gross Profit ($MM) Net Earnings ($MM) Market Capital Market Cap / Revenue63%53%32%42%71%98%144%84%48%52% Net Earn / Market Cap.4.7%6.0%-15.4%6.1%9.3%6.3%5.1%6.2%10.9%-5.6% Revenue / Employee256,934172,458207,500542,646154,388168,205284,861256,584343,000219,926 Earnings / Employee ($)7,6015,498-10,13013,78610,17910,37021,03113,48817,778-6,481 Earnings / Revenue (%)3.0%3.2%-4.9%2.5%6.6%6.2%7.4%5.3%5.2%-2.9%

26 Copyright Richard Harrison 2013 Has the engineering company done this before? الشركة الهندسية فعلت هذا من قبل؟ What percentage of the team members are Professional Engineers? ما هي النسبة المئوية من أعضاء الفريق من المهندسين محترفين؟ How well have the engineer’s fertilizer projects performed for the owner? مدى اتقان المهندس لمشاريع الأسمدة التي أجريت لصاحب المشروع؟ How many years of fertilizer experience does the proposed team have? عدد سنوات الخبرة؟ What engineering company do North American phosphate producers choose for their major projects? ماهي الشركة الهندسية التي يتم الاستعانه بها لمشاريع الفوسفات

27 Copyright Richard Harrison 2013 Richard Harrison Professional Engineer Cell