Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.

Slides:



Advertisements
Similar presentations
is a mobile protective steel barrier in a modular design.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
March 7, 2001 Air Resources Board - Rice Straw Supply Workshop1 RICE STRAW SUPPLY Recommendations for Ensuring the Consistency and Predictability in the.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
MTF Rail Development Forum
The design of a large and modern warehouse is very complex and requires a range of skills and disciplines.  operations  construction  materials handling.
WHAT IS “CLASS”? A BRIEF ORIENTATION TO THE CLASS METHODOLOGY.
Construction and Installation of the CLIC Experimental Area
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Tom MAZOUR IAEA, Division of Nuclear Power
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
Baseline Change Request BCR Title: EBD New 6 Ton Bridge Crane Installation BCR #: N/A Presenter’s Name: Robert Law CCB Presentation Date:
SLA – Oct. 07 BDS-KOM1 Installation Overview Acknowledgment: F. Peters, M. Munro, J. Kim G. Aarons, C. Corvin, P. Rodriguez Fred Asiri/SLAC.
Outstanding Issues on Infrastructure and Development Fraser Duncan SNOLAB/Queen’s University 4 th SNOLAB Workshop 15 August 2005.
Logistics and Practical Aspects of Construction of a Large LAr Tank in a Remote Location FLARE Workshop November 5, 2004 Elaine McCluskey Fermilab FESS/Engineering.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
IGD-TP Pilot Project on Operational and Construction Safety Status May 2014.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
Long-Baseline Neutrino Facility LBNF Integration - Interfaces, Config Mgmt and Requirements Jeffrey Dolph LBNF/DUNE DOE/SC CD-1 Refresh Review July 14-16,
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Template for DUSEL Meeting with Potential Experiments.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Project 29 September 2015.
News from LBNF C. J. Mossey, LBNF Project Director DUNE Collaboration Meeting - South Dakota School of Mines and Technology 19 May 2016.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Status N. S. Lockyer
Long-Baseline Neutrino Facility LBNF Far Site CF Scope Joshua Willhite Logistics Workshops August 11-13, 2015.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Long-Baseline Neutrino Facility LBNF Update: LBNF EVMS Implementation for CD-3a Elaine McCluskey, LBNF Project Manager Bob O’Sullivan, Project Controls.
Long-Baseline Neutrino Facility LBNF LBNF Project C. J. Mossey, LBNF Project Director 49 th Annual Fermilab Users Meeting 16 June 2016.
Long-Baseline Neutrino Facility LBNF LBNC: Far Site Update and Planning Mike Headley LBNF Far Site Facilities Project Manager January 11, 2016.
Long-Baseline Neutrino Facility LBNF Update on LBNF to Long-Baseline Neutrino Committee Elaine McCluskey, LBNF Project Manager 13 June 2016.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
MMT Retreat Technical Services across ESS Peter Rådahl
Long-Baseline Neutrino Facility LBNF Far Site CF Scope Joshua Willhite Interface and Logistics Workshops August 10-12, 2015.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Long-Baseline Neutrino Facility LBNF Elaine McCluskey, LBNF Project Manager Fermilab PAC Meeting 23 June 2015.
Experimental Hall in Mountain Regions
LBNF/DUNE Update Public Meeting Sanford Lab Update
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Capital Metro Downtown Station Improvements
FCC Cryo-magnet Logistics
LBNF Excavation Alternatives
Change Request Panel report
Optimization for Airport Facilities
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
Radwaste: status & way forward
The Project Overview and Status Report
Presentation transcript:

Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015

LBNF Overview Many, major activities occurring at SURF over next ~15 years  Operations and decommissioning of LUX  Assembly, operations, and decommissioning of MJD  Installation and operations of CASPAR  Installation and operations of the BHSU UG Campus and LBCs  Completion of Ross Shaft refurbishment and continued SURF Ops  Construction, installation, and start of ops for LBNF/DUNE  Installation and operations of LZ LBNF / DUNE to commence construction soon (Elaine to cover)  Currently in preliminary design, CD-3A planned for Dec 2015  Installation of waste rock handling systems  Late Excavation mobilization then outfitting and cryo install  mid-2020s – Commissioning and science operations begin Mike Headley | Logistics Workshop Summary2

LBNF Logistics Plan Scope Mike Headley | Logistics Workshop Summary3 Arup developing comprehensive logistics plan out to ~2030  Construction and installation plans including utilization of SURF and surrounding infrastructure, number and timing of deliveries, hours of required operation, parking, and warehouse and lay down space needs.  Plans for waste storage and removal from SURF.  Traffic management including loading, unloading, parking, planned access routes, capacity and utilization for transportation of materials, supplies, equipment, and staff.  Recommendations on facility infrastructure modifications or process changes to improve the efficiency of all activities.  Summary of risks specifically related to logistics plans.  Projection of personnel involved onsite throughout construction and installation and recommendations on staff support including housing  Site security and safety considerations.

LBNF Logistics Plan development schedule Mike Headley | Logistics Workshop Summary4 Logistics WorkshopAugust Draft Comprehensive Logistics Report DueSeptember 10 Stakeholder Feedback DueSeptember 25 Final Comprehensive Logistics Report DueOctober 9

LBNF Topics covered Mike Headley | Logistics Workshop Summary5 Infrastructure overview Surface and underground tours Presentations by SURF operations, LUX/LZ, Majorana, CASPAR, BHSU Underground Campus (low background counting) LBNF/DUNE presentations by CF, cryostat, cryogenic systems, FD Risk identification / analysis of items related to logistics Arup led discussion of the topics outlined in the logistics scope Presentation of information captured in excel-based toolset to track SURF infrastructure usage over time

LBNF Key items reviewed in evaluating infrastructure usage Mike Headley | Logistics Workshop Summary6 Each group provided a detailed presentation on schedule and infrastructure needs and a resource usage spreadsheet Key constraints  Shaft access  Big X  Governor’s Corner Shaft options for LBNF+DUNE  Ross only  Ross + Yates “as-is”  Ross + Yates “upgraded” (assume not feasible for now) We looked at Ross Shaft for ALL work on LBNF+DUNE only

LBNF Planning outputs - Assumes Ross Shaft only for LBNF/DUNE (draft) Mike Headley | Logistics Workshop Summary7

LBNF Draft schedule and Ross Shaft utilization (Excavation, BSI, and Cryostat phasing needs to be addressed) Mike Headley | Logistics Workshop Summary8

LBNF Top 15 risks identified – pre-mitigation scoring Mike Headley | Logistics Workshop Summary9

LBNF Mitigations to be considered Mike Headley | Logistics Workshop Summary10 Install concrete slick line borehole from surface to 4850L to remove concrete/shotcrete transport from the Ross Shaft Install boreholes for nitrogen and argon gas delivery to 4850L Assuming LBNF/DUNE utilize Ross Shaft for transport of long loads (up to 17m), modify Ross Headframe accordingly and/or evaluate shortening of cryostat steel beams to ease installation Utilize Yates Shaft as is – do not modify for long loads and avoid impacts to Davis Campus experiments Plan and conduct controlled blasting test program to evaluate impacts for LBNF excavation on other 4850L inhabitants Evaluate acceleration of phase 1 excavation to speed cryostat 1 installation and thus FD installation. Adjust EXC, BSI, and cryostat schedules to fix phasing of CF to cryostat installation