1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Insertion Device Toshi Tanabe, ID group leader 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
BROOKHAVEN SCIENCE ASSOCIATES ASAC Review of the NSLS II Project, October , Status of the NSLS II Storage Ring Magnets Prepared by John Skaritka.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Accelerator Commissioning
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES ASAC Meeting NSLS-II Project July , 2008 G. Ganetis Power Supplies & Electrical Utilities ASAC Meeting National Synchrotron.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Anthony Guadagni NSLS-II Procurement Manager March 25, 2009.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
O. Kester, NuSTAR annual meeting, 27/02/2013
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Ferdinand Willeke Director, NSLS-II Accelerator Systems NSLS-II PAC Meeting November 20, 2007.
ELENA installation progress F. Butin / ELENA collaboration.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
WP High Beta Cavities Delivery
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Installation Procurement Package
On behalf of the Accelerator Project Phase II Team
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
X-ray Pump-Probe Instrument
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Production Management
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Overview of Procurement Process Review Significant Procurements in Process Current Status Contract Award Status (Baseline vs. Current) Next Milestone Delivery Schedule Challenges Delivery, Storage & Assembly Upcoming Procurements Conclusion

3 BROOKHAVEN SCIENCE ASSOCIATES Overview of Sig. Procurement Process Process StepTypical Timeframe 1. SOW, Specification & Supporting Documents3-6 weeks 2. ASD, PPM, QA & ESH Review2-4 weeks 3. Evaluation Criteria & Purchase Requisition1-2 weeks 4. Package to PPM for Review1-2 weeks 5. Request for Proposal (RFP)1-2 weeks 6. BSA Review2-3 weeks 7. DOE Review (> $5 mil)2-3 weeks 8. Out for Bid2-6 weeks 9. Technical Evaluation2-3 weeks 10. Negotiation1-3 weeks 11. BSA Review1-2 weeks 12. DOE Review (> $5 mil)1-2 weeks 13. AwardTotal weeks

4 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Magnets Current Status Quads & Correctors – Contracts issued Sextupoles – DOE Approved Large Aperture – In negotiation with vendor Dipoles – Technical review (10/19) Contracts spread to spread risk; can shift Next Milestone – Issue all contracts; Track vendor progress BL Contract Award Date – Aug/Sept, 2009 Current Contract Award Date – Oct/Nov, 2009 Delivery Schedule – On schedule for mid-2011 Challenges – Complexity, Resources, First major ASD procurement Will produce Lessons Learned

5 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Girders Current Status SOW signed Finalizing & checking drawings Next Milestone – RFQ/RFP, Send out for bid BL Contract Award Date – Oct, 2009 Current Contract Award Date – Jan, 2010 (deliberate to avoid girder storage onsite) Delivery Schedule – Compressed, but still end-2010 Challenges – Alignment analysis, Verifying with lattice, RFQ vs. RFP

6 BROOKHAVEN SCIENCE ASSOCIATES Linac Current Status SOW & Spec signed RFP in BSA review Next Milestone – Send out for bid BL Contract Award Date – Jan, 2010 Current Contract Award Date – Feb, 2010 Delivery Schedule – Beg-2012 (commissioned by vendor) Challenges - Resources

7 BROOKHAVEN SCIENCE ASSOCIATES Booster Current Status Specification & SOW in final review, awaiting feedback Drawings & Appendixes being completed Next Milestone – Sign off Spec & SOW, RFP creation BL Contract Award Date – March, 2010 Current Contract Award Date – March, 2010 Delivery Schedule – Beg-2013 (commissioned by vendor), Compressed, On Critical Path Challenges – PPM consumed with magnet procurement, Semi-turnkey added complexity

8 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Chamber Extrusions Current Status Multipole – Contract issued Dipole – Out for bid Next Milestone – Award Dipole contract BL Contract Award Date – Aug, 2009 Current Contract Award Date – Oct, 2009 Delivery Schedule – Compressed, On schedule for end-2009 thru mid-2010 Challenges – Limited interest from vendors, Changed multipole profile, Vendor ability to hold tolerances, Long prototype phase

9 BROOKHAVEN SCIENCE ASSOCIATES Damping Wigglers Current Status Spec & SOW in process Addressing vendor exceptions Another national lab is potential vendor Next Milestone – Sign Spec & SOW BL Contract Award Date – Sep, 2009 Current Contract Award Date – Feb, 2010 Delivery Schedule – Late, mid-2011 instead of beg-2011, Delivery date dependant on vendor selection Challenges – Feasibility of specifications, Limited vendors

10 BROOKHAVEN SCIENCE ASSOCIATES Other Procurements Ultrasonic Cleaning Facility – Out for bid Vacuum System Bimetallic Flanges – Contract issued Environmental Enclosure – Out for bid Hall Probe Bench – Contract issued Moving Wire Bench – Spec in process Precision Current Transduce r – Contract issued

11 BROOKHAVEN SCIENCE ASSOCIATES Delivery, Storage & Assembly Dedicated Receiving Area Plan Started to Link Area Needed to Delivery Schedule Storage locations being identified Locations identified & secured for assembly of: Magnets Process Water System Front Ends RF Electrical Systems Diagnostics & Instrumentation

12 BROOKHAVEN SCIENCE ASSOCIATES ProcurementAwards Vacuum Chamber MachiningBeg-2010 Vacuum Components Power Supplies, Amplifiers & ControllersMid-2010 Equipment Racks & Heat ExchangersMid-2010 Beam Position Monitors & Receivers Front EndsMid-2010 Process Water SystemMid-2010 RF Cavities & Power System Cryogenic System Personal Protection SystemsMid-2010 Some Upcoming Procurements

13 BROOKHAVEN SCIENCE ASSOCIATES Conclusion Much progress made, but some procurements are late due to resource and technical reasons Booster is most pressing PPM seems overloaded, but the load should lighten Ways to makeup for delays being identified Systems, procedures & templates in place Delivery, storage & assembly plan in progress Future procurements should go quicker due to experience