ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: –http://indico.cern.ch/categoryDisplay.py?categId=2957 The full shutdown planning.

Slides:



Advertisements
Similar presentations
André Augustinus 5 March 2007 Infrastructure status.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 7&8 A.Tauro
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
winter shutdown planning A.Tauro
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
LS1 planning meeting Comments on LS1 schedule Schedule reviewed last week with Yann + TC…  sequence after OD looked too squeezed  therefore.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ALICE 5 o’clock meeting Wk 49
Access system global tests M. Gruwé LHCCWG January 15 th 2007.
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
EYETS planning A.Tauro.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
ALICE 5 o’clock meeting Wk
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
LHCb & EYETS
ALICE 5 o’clock meeting Wk
Presentation transcript:

ALICE 5 o’clock meeting Wk 50

INDICO You’ll find this meeting here: – The full shutdown planning is here: –

15/12/105 o’clock meeting3 Access request Cavern and surface You should submit an ADI and a task procedure Two persons minimum Work breakdown structure – risk associated at each step ADI Task procedure Template EDMS Attach task procedure

15/12/105 o’clock meeting4 ALICE Christmas break schedule OpenExperiment TRD EMCal CloseExperiment Open L3 doors Close L3 doors

15/12/105 o’clock meeting5 UX25 access Rules for access restrictions: Removal/installation of shielding (restriction includes RB24 triplets) PX24 blocks: no access CR5 and UX25 PX24 beams (35t): no access CR1-5, Expo, and UX-25 All other blocks: no access to UX-25 LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25 Gas functional test (10/ hrs) – no access UX25 and CR1-5 AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25 DSO test (12-13/1) (Department Safety Officer) – no access UX25 No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)

15/12/105 o’clock meeting6 L3 (and MNF) access No Ventilation EMCal No Ventilation Wks 50 and 4: access (TPC) to be coordinated with TC (transport) Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day) When moving from low-beta to yellow platform: no access to MNF When inserting the module: no access L3 and MNF Watcher needed in wk 49 and from wk 4 onwards Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC) Evac.

Day-by-day schedule UX25 and MNF - Wk 50

15/12/105 o’clock meeting8 Access status: 8: :00: UX25 cavern in Restricted mode –No access UX25 (except Transport and TC) From 18:00 - Cavern in General mode No access L3 (no ventilation) Activities: ALTEAD: MNF shielding: O-side wall Lift PMD CROCUS SPIE: removal L3 ventilation Philippe: cut SPD pipe (chillers) Activities after 18:00: TRD: access to L4 racks T0: investigation broken chains Week /12 Monday

15/12/105 o’clock meeting9 Activities in UX25 - Week /12 Monday LV156 No access L3 (no ventilation) L3 ventilation LV156 MNF shielding

15/12/105 o’clock meeting10 Activities in MNF - Week /12 Monday No access L3 (no ventilation)

15/12/105 o’clock meeting11 Access status: 8: :00: UX25 cavern in Restricted mode –No access UX25 (except Transport and TC) From 18:00 - Cavern in General mode No access L3 (no ventilation) Activities: ALTEAD: MNF shielding: O-side wall Opening I-side door done Gas upgrade (SG2): stop all gas systems Ar, CO2, N2 and Neon done. The others must be done on January 11!!! –Evacuation all Ar/H2 bottles (Fayet, morning) –X-ray at night SPIE: new PMD ventilation (removal filter) –VIC at 10:00 Activities after 18:00: T0: investigation broken chains Week /12 Tuesday

15/12/105 o’clock meeting12 Activities in UX25 - Week /12 Tuesday Open I-side door No access L3 (no ventilation) LV156 MNF shielding (green bridges) PMD ventilation Visit 13:30 (Karel) T0

15/12/105 o’clock meeting13 Activities in MNF - Week /12 Tuesday No access L3 (no ventilation) T0

15/12/105 o’clock meeting14 Access status: Cavern in General mode Activities: ALTEAD: yellow-platform rails. Put YP on rails. Removal MNF staircase. Shielding on O-side gone TRD: test LV inside magnet TPC: replacement FE cards (C-side) Release all TOF crates supports (Yannick-Samuel) Gas upgrade (SG2): restart gas systems EN-CV: maintenance TRD cooling unit TPC laser: dismount back wall of laser hut + start removal laser VIP visit: Finance and Council Delegates – 16:45 (1hour) Week /12 Wednesday

15/12/105 o’clock meeting15 Activities in UX25 - Week /12 Wednesday Access in general mode TRD cooling TPC/TRD YP rails Release all TOF crates supports (Yannick- Samuel) Laser EMC

15/12/105 o’clock meeting16 Activities in MNF - Week 50 15/12 Wednesday Access in general mode Removal MNF staircase (access with ladder)

15/12/105 o’clock meeting17 Access status: Cavern in General mode Delivery to P2 of 2 (last) EMCal modules Arrival PMD team Activities: ALTEAD: yellow-platform rails Open O-side door – by afternoon SPIE: PMD ventilation Survey: baby-frame zero-measurement + TRD EN-EL: motorize L3-Dipole-Miniframe circuit breaker (T.Bourrel, VIC at 10:30) TRD: test LV inside magnet TPC: replacement FE cards (C-side) Release all TOF crates supports (Yannick-Samuel) EN-CV: maintenance TRD cooling unit TPC laser: removal laser + take out laser-hut back door. Take out old power supply EMCal: installation HV PS (CR4) and LV PS (L4-O-side) Week /12 Thursday

15/12/105 o’clock meeting18 Activities in UX25 - Week /12 Thursday Laser TRD cooling TPC/TRD EN-EL Release all TOF crates supports (Yannick- Samuel) PMD ventilation Open O-side door LV156 Access in general mode Survey

15/12/105 o’clock meeting19 Activities in MNF - Week /12 Thursday Access in general mode Disconnect PMD services

15/12/105 o’clock meeting20 Activities in UX25 - Week /12 Friday Laser Decoupling TPC-Space- Frame (Yannick- Samuel) TRD cooling Lower TRD 16. No access low-beta platform TPC FEC Access in general mode Survey

15/12/105 o’clock meeting21 Activities in MNF - Week /12 Friday Disconnect PMD services Access in general mode

15/12/105 o’clock meeting22 Activities in UX25 - Week /12 Saturday Laser Decoupling TPC-Space- Frame (Yannick- Samuel) Access in general mode

15/12/105 o’clock meeting23 Activities in MNF - Week /12 Saturday Disconnect PMD services Access in general mode

15/12/105 o’clock meeting24 Activities in UX25 - Week /12 Sunday Access in general mode TRD team at CERN: 19 (PM) to 23/12

15/12/105 o’clock meeting25 Activities in MNF - Week /12 Sunday Disconnect PMD services Access in general mode

15/12/105 o’clock meeting26 DCS plans Wk 50 –Mon 13/12 – Tue 14/12 (daytime): Force upgrades and patches to all remaining systems Systems unavailable for short (~hrs) periods, frequent reboots –Support to detectors restarting/testing their systems after upgrades Detectors shall test functionality as much as possible André / Peter

15/12/105 o’clock meeting27 AOB -