G.Barber KEK Test Beam Update, Berkeley 9 Feb 20051 KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
G.Barber Mice Tracker Integration Jun Tracker integration.
Waveguides M. Yoshida (Osaka Univ.) MICE meeting at LBNL 09.Feb.2005.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status Update on Mechanical Prototype in Rome November 6,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Tracker Summary Alan Bross MICE CM October 10, 2007.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Ship Computer Aided Design MR 422. Outline 1.Classification and Regulation. 2.Tooling and Manufacturing. 3.Maintenance and Repair. 4.Levels of definition.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
MSD II Week 7 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
Tracker Summary M. Yoshida (Osaka Univ.) MICE 2005.Feb.12 th.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Preparation for Station Acceptance Test
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
as a prototype for Super c-tau factory
Presentation transcript:

G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors Patch Panel & Connectors

G.Barber KEK Test Beam Update, Berkeley 9 Feb Station Progress The 4 th station is now under construction. The layout has a total of 30 connectors, 10 per view. Each connector has 22 holes instead of the previous 18 but all of these are not used in every connector. All 3 planes are glued and the ‘connectorisation’ is under way and will be finished by the end of this week. It will then undergo extensive checking before being potted.

G.Barber KEK Test Beam Update, Berkeley 9 Feb Space Frame Components All of the components that make the space frame assemblies have been or are in the process of being manufactured. Tooling The jigs that align the space frames are all manufactured. One further development?

G.Barber KEK Test Beam Update, Berkeley 9 Feb Connector Map 126 Way 128 Way 125 Way View ‘W’ 211 Channels View ‘V’ 211 Channels View ‘X’ 211 Channels

G.Barber KEK Test Beam Update, Berkeley 9 Feb Connector 1 View ‘V’ 18 Way Bundles 2 – 19 To Bulkhead Connector - 1 Station connector Viewed from the polished face x x xx

G.Barber KEK Test Beam Update, Berkeley 9 Feb Bulkhead Connector 1 View ‘V’ 126 Way Bundles 2 – 127 in ‘V’ From Connectors C1 – C6 Station connector Viewed from the polished face x x

G.Barber KEK Test Beam Update, Berkeley 9 Feb Prototype Layout All of the components that make the space frame assemblies have been or are in the process of being manufactured. There is still detail design to do to complete the assembly a list of outstanding items is on the next slide

G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress To do list Final detail for the outer casing including the brackets to fix the assembly during transport and into the magnet. The modification that will allow the original prototype stations to be married to the new space frames A new patch panel to be made or the existing one modified. The space frames to be assembled Polishing of the 4 th station

G.Barber KEK Test Beam Update, Berkeley 9 Feb Conclusions There is still a number of items to design and detail and a few outstanding items to manufacture but overall we are in pretty good shape. In the next month we hope to complete and be ready to ship so that we/I can concentrate on the final tracker design.