2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.

Slides:



Advertisements
Similar presentations
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
Advertisements

TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1 ALICE: Progress and Plans Progress on - Selected Detector Systems - Infrastructure in Point 2 - CERN Hostlab responsibilities 6 th ST Workshop, C.W.
Progress with the TPC gas monitor Dariusz Antończyk Outline : Motivation Simulations Measurements Summary & Outlook.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
22/07/2003TOF Gas System PRR (C. R. Gregory) 1 TOF GAS SYSTEM Production Readiness Review SYSTEM INTEGRATION.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Demineralised water cooling system
Technical Design for the Mu3e Detector
Pre-installation and Functional Tests
cooling and supports of the forward endcap EMC
Structure and etc Shoji Uno (KEK) at B2GM
Mini-drawers, FE-ASIC , Integrator
List of changes and improvements for the next generation CLIC module
Toward the final design of a TPC for the ILD detector
Alice TPC DCS.
TRD GAS SYSTEM PRR Gas System Integration Gas building
Pierluigi Paolucci - I.N.F.N. Naples
TPC Detector Control System
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Presentation transcript:

2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring Urgent Attention Participants: S. Evrard/EST D. Gabriele /EST R. Gregory/EST F. Hahn /EP S. Haider /EP S. Maridor/EST Meuller /ST L. Leistam/EST M. Pimenta dos Santos /ST P. Szymanski/EP

2-3rd. September 2002TPC Collaboration Meeting2 MINI SPACE FRAME Original concept Access Now more detail

2-3rd. September 2002TPC Collaboration Meeting3

2-3rd. September 2002TPC Collaboration Meeting4

2-3rd. September 2002TPC Collaboration Meeting5

2-3rd. September 2002TPC Collaboration Meeting6

2-3rd. September 2002TPC Collaboration Meeting7

2-3rd. September 2002TPC Collaboration Meeting8

2-3rd. September 2002TPC Collaboration Meeting9

2-3rd. September 2002TPC Collaboration Meeting10

2-3rd. September 2002TPC Collaboration Meeting11 BACK FRAME General Layout Access ROC Installation tool

2-3rd. September 2002TPC Collaboration Meeting12

2-3rd. September 2002TPC Collaboration Meeting13

2-3rd. September 2002TPC Collaboration Meeting14

2-3rd. September 2002TPC Collaboration Meeting15

2-3rd. September 2002TPC Collaboration Meeting16

2-3rd. September 2002TPC Collaboration Meeting17 COOLING Work package & Units Detailed design Installation schedule Cost estimates

2-3rd. September 2002TPC Collaboration Meeting18

2-3rd. September 2002TPC Collaboration Meeting19

2-3rd. September 2002TPC Collaboration Meeting20

2-3rd. September 2002TPC Collaboration Meeting21

2-3rd. September 2002TPC Collaboration Meeting22

2-3rd. September 2002TPC Collaboration Meeting23

2-3rd. September 2002TPC Collaboration Meeting24

2-3rd. September 2002TPC Collaboration Meeting25

2-3rd. September 2002TPC Collaboration Meeting26

2-3rd. September 2002TPC Collaboration Meeting27 CABLES Low Voltage High Voltage Control & Read-out

2-3rd. September 2002TPC Collaboration Meeting28 CABLES (LV)

2-3rd. September 2002TPC Collaboration Meeting29 CABLES (LV) Cont. * 40m length

2-3rd. September 2002TPC Collaboration Meeting30

2-3rd. September 2002TPC Collaboration Meeting31 CABLES (LV) Cont. Companies recommend Cables outside L3 magnet & Bus Bars inside (economic reasons) Heat dissipation from Bus Bars a worry (cooling will be necessary)

2-3rd. September 2002TPC Collaboration Meeting32 TEMPERATURE (0.18) Anna Mueller ST/CV

2-3rd. September 2002TPC Collaboration Meeting33 VELOCITY FIELD (0.18) Anna Mueller ST/CV

2-3rd. September 2002TPC Collaboration Meeting34 TEMPERATURE (0.24) Anna Mueller ST/CV

2-3rd. September 2002TPC Collaboration Meeting35 CABLES (HV) 100kV on both RB24 & RB26 sides HV (FEE ?) both sides Control cables for HV both sides

2-3rd. September 2002TPC Collaboration Meeting36 CABLES (control) DDL Cal. Pulser Gating Pulser Temperature sensors Clock/Trigger DCS/Profibus Other?

2-3rd. September 2002TPC Collaboration Meeting37 GAS STSTEMS Work packages Limits of supply Construction of units has commenced Testing with dummy load May 2003

2-3rd. September 2002TPC Collaboration Meeting38 WORK PACKAGES Mixing,circulation,purifier & CO 2 separation units (GWG) Primary supplies & interconnecting pipework (EST/GDS) Integration (ALICE Team) GOOFI unit (???)

2-3rd. September 2002TPC Collaboration Meeting39 LIMITS of SUPPLY Up to a flange on the distribution manifold (front face of the TPC Field Cage) Field cage Manifold Flange Flexible Pipe from GOOFI unit Limit of supply

2-3rd. September 2002TPC Collaboration Meeting40 SYSTEM TESTS Starting Spring 2003 –In SGX2 –With 90m3 dummy load Is it required to test TPC before lowering to UX25? –If so where?

2-3rd. September 2002TPC Collaboration Meeting41 ITEMS REQUIRING URGENT ATTENTION LV Cable Cooling ROC Insertion Tool