News from the lab Large size Micromegas chambers Saclay, 18-19 April 20131 Givi Sekhniaidze / Joerg Wotschack.

Slides:



Advertisements
Similar presentations
Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status of the ATLAS MM project
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Status Update on Mechanical Prototype in Rome November 6,
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
22/01/2014I° microEO meeting1 MICRO-COOLING CONNECTORS.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
PCB layout issues PCB alignment and spacing MMM meeting, 22/01/2014G. Sekhniaidze/ J. Wotschack1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP THERMO-MECHANICAL SIMULATIONS FOR THE MM WEDGES (TDR OPTIONS – SCREWED QUADRUPLETS) of June 2013 Patrick.
Irfu.cea.fr ATLAS-NSW SACLAY MMM WORKSHOP SIMULATIONS OF THE MM WEDGES WITH THE LAYOUT OPTION #3B of April 2013 Patrick PONSOT & Patrick GRAFFIN.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
Design Progress Allen Ellis 18-September
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
New results from MMSW Micromegas quadruplet 20/03/2015Michele Bianco RD51 week M. Bianco a, H. Danielsson a, J. Degrange a, R. De Oliveira a, F. Perez.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
MICROMEGAS CONNECTICS Electronics Boards And Readout Panels 25 JUNE 2013.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Experience with 1 x 1m 2 and 2 x 1 m 2 MM assembly CERN/PH/DT Hans Danielsson, Francisco Perez Gomez, Philippe Lenoir, Pierre-Ange Giudici, Francois Garnier,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Aristotle University of Thessaloniki QC – QA readiness at AUTh tooling and procedures D. Sampsonidis, P. Charalampous, S. Kompogiannis, and C. Lampoudis.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
GEM activities at LZU Xiaodong Wang ( 王晓冬 ) 09,25,2013.
Electron transparency studies with an exchangeable mesh Micromegas chamber Fabian Kuger 1,2 Paolo Iengo 2, Rui de Oliveira 2, Givi Sekhniaidze 2, Joerg.
1 TRACK CHAMBERS BASED ON PRECISION DRIFT TUBES HOUSED INSIDE 30 mm MYLAR PIPE A.Borisov, N.Bozhko, R.Fakhrutdinov, A.Kozhin, B.Leontiev, A.Levin.
DATABASE ARCHITECTURE PROPOSAL Fabien Jeanneau – 19 jan 2015.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
GRPC development in Lyon
Update on Pavia MM mechanical prototype
Studies on TH2 chamber Michele, Maria, Givi, Joerg
Integration issues at IHEP
Preliminary Performance of the L2 Chamber (Side A)
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
MicroMegas Mechanical Meeting --- Cern April 2014
Mechanical analysis of Foam and plastic honeycomb panels
After service guide for changing PCB
Presentation transcript:

News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack

Saclay, April On the 2.8 x 2.8 m² granite table was located thin plastic mesh for pressure distribution Covered with 175 μm thick mylar foil with ø3 mm holes Pump connectors

Saclay, April Gas distribution Mesh frame support frames

Saclay, April 20134

5

6 Cross-bars Long bars Sucking heads

Saclay, April x50 mm cross-bars – 1.2 m 50x80 mm long bars – 2.5 m Glued with Araldite sucking heads per bar

Long bars Metrologic Shims Stiff bars Planarity (in microns) 12 rectified bars with 4 or 5 suction cup

X 12 Vacuum Clarinet gas PCB Using Skin suction Tool Vacuum Expansive glue Vacuum Precise shim Saclay, April Skin

Saclay, April Mesh Cyanoacrylate Araldite 2011 Drift PCB

Saclay, April mm thick Aluminum frame mounted on the panel Mesh stretched and glued on the frame 3 special inserts for drift/read-out panel interconnection

Saclay, April M3 screw O-ring Pillars Insert Mesh

Saclay, April

Saclay, April

Saclay, April mm thick FR4 external skin 10 mm thick Aluminum honeycomb External Aluminum frames

Saclay, April

Saclay, April

Saclay, April Due to the deformation of the stiff-back structure the distance between the PCB and the “half” panel was not correctly defined and problems appeared with the gluing. Along of the external Al frame and in some small areas also in the central parts of the PCB the glue is not attached correctly We found gas leak in the drift panel of L2 chamber. In the new drift panels the gas leak problem has been solved. The drift “old” panel of the L2 chamber will be replaced next week