1 The Future of SAPP, WAPP, CAPP, and EAPP – With Inga IEEE GM 2005 San Francisco June 15, 2005 PURDUE UNIVERSITY F. T. Sparrow Brian H. Bowen Zuwei Yu.

Slides:



Advertisements
Similar presentations
WinDS-H2 MODEL Wind Deployment Systems Hydrogen Model Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower Walter Short Nate Blair.
Advertisements

Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Resource Adequacy in PJM
SOUTHERN AFRICAN POWER POOL SAPP REPORT TO 5 TH COORDINATION MEETING OF POWER POOLS IN AFRICA Harare, ZIMBABWE 6-7 May 2010.
Electric Transmission and Economic Opportunities Richard W. Caperton Senior Energy Policy Analyst.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Electricity Infrastructure: Overview and Issues (2) H. Scott Matthews February 19, 2003.
Powering Africa – SAPP Strategies
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Ten Things Journalists Need to Know About Africa’s Energy Sector.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
North American Strategic Infrastructure Leadership Forum October 12, 2011.
Gas Development Master Plan Scenarios for the GDMP Capacity Building Workshop Bali, 1-2 July 2013.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Africa Programme for Energy Infrastructure Development NPCA Role By Prof M.M.Elmissiry Head Energy Programmes NEPAD Agency,NPCA Midrand,South Africa Africa.
Overview of the SAPP and the Energy Network in Southern Africa
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Prospects for the African Power Sector Asami Miketa International Energy Workshop, June 19-21, 2012 Cape Town, South Africa.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Discussion of Resource Plans Michael Schilmoeller for the Northwest Power and Conservation Council Wednesday, June 10, 2009.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
Scenarios for a South African peaking CSP system in a short term Stellenbosch University Energy Postgraduate Conference 2013 Cebo Silinga Supervisor: Paul.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
PJM©2013www.pjm.com Deployment of smart-grid technologies – Technology and market challenges Stu Bresler VP, Market Operations PJM Interconnection University.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Demand-Side Management Models & Practices in California Innovating for Sustainable Results: Integrated Approaches for Energy, Climate, and the Environment.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Competition or Reliability in Electricity? What the Coming Policy Shift Means for Restructuring Diana L. Moss, Ph.D. Vice President and Senior Research.
AFRICAN DEVELOPMENT BANK GROUP ENERGY STRATEGY 17th UPDEA CONGRESS Hammamet - 29th May 2012 AMADOU Zakou Manager, Energy Division 1.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Updated 1/28/2011.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
Resource Adequacy Steering Committee Meeting October 4, 2011.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
The Australian Market Evolution Dr Brian Spalding Chief Operating Officer NEMMCO.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
The Southern African Power Pool
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
GETTING ENOUGH COAL: MORE THAN A THREE LEGGED STOOL DAY ONE KEYNOTE: NOVEMBER 2, 2006 COAL NEEDS POWER COMPETITION TO SUCCEED John E. Shelk.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Renewable Energy Resource Assessment and Planning Tijana Radojičić IRENA – Country Support and Partnerships Dar es Salaam, 9 March 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
PJM: Managing Grid Evolution Through Markets
Data Tables for the OPO Technical Report August 2016.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
The GridSolar Project Presentation – NRCM January 21, 2010
Planning Reserve Margin
Presentation transcript:

1 The Future of SAPP, WAPP, CAPP, and EAPP – With Inga IEEE GM 2005 San Francisco June 15, 2005 PURDUE UNIVERSITY F. T. Sparrow Brian H. Bowen Zuwei Yu

2 Establishment of Africa’s Power Pools

3 Sub-Sahara Regional MW Totals

4 Southern African Power Pool SAPP Major new lines for increased trading SAPP – well along in their Operation (1995)

5 West African Power Pool WAPP Major new lines for increased trading WAPP – moving into Operational phase (2000)

6 Central African Power Pool EAPP now in the process of identifying needed HV lines (2005) DRC-Inga with future exports to SAPP, WAPP, EAPP, Egypt

7 East African Power Pool EAPP Just getting organized expecting a launch late 2005

8 Proposed Future Africa Grid International transmission links within power pools International transmission links between pools During next 10 years development of lines CAPP to SAPP &WAPP CAPP to Egypt & EAPP CAPP becomes central link with vital role for Inga site

9 North American Trading Between Interconnects System designed for reliability, not economy trades Result – very little load carrying capability between regions Pacific DC HV Inter-Tie 3,100MW, 800miles

10 Total Gross Transactions Between 4 NERC Regions Trade represents 8.8% of total U.S. peak demand

11 The Feasibility of Grand Inga The underlying question – is there enough demand in Africa to justify the enormous up-front dam construction cost? The average historic demand growth has averaged about 2% per year over the last ten years Is there enough suppressed demand to justify the much higher growth rates projected by member nations?

12 Forecast Growth in Electricity Demand Average Historical Growth for:- Egypt = 2.6% Nigeria = 2.4% S. Africa = 1.4% Forecasting 5% + What are low and high scenarios?

13 Assumptions for Inga Feasibility Analysis All demand growth in likely export markets for Inga (SAPP, WAPP, EAPP, Egypt) will be met by Inga power, not local construction Growth rates in the range of 2% to 4% per year Electricity will be sold at 3.5 cents/kWh (otherwise markets will generate their own electricity) Inga construction and transmission line costs are $16 Billion The cost of capital is 10%

14 Demand Values & Export Revenues 58,556MW + Egypt capacity 18,000MW = 76,556MW total Assume base year demand with 80% capacity factor = (76,556 x 0.8 x 8,760) MWh Year 1 revenues resulting from increase in demand growth of 2%, electricity price of $30/MWh = $(76,556 x 0.8 x 8,760 x 0.02 x 30.0) = $322M

15 Inga – Question & Answer Q: When will the annual net revenues from export sales cover the annual capitalized cost of the Inga project? A1: Never if the growth rate is 2% A2: In 19 years if the growth rate is 4% Does this mean Inga should be abandoned? NO – Just broken down into smaller pieces

16 Inga Annual Net Revenue Stream

17 With economies of scale in construction and a given growth rate in demand, “the higher the cost of capital, then the smaller will become the optimal size of each installation” Alan Manne Stanford University Growth in Demand & Cost of Capital

18 Low & High Demand Growth Rates Low Growth High Interest Rates High Growth Low Interest Rates Demand & Capacity Demand & Capacity Time