GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico1 from ANNEX 02 to NCR/FM/INFN/RM2/003 26.5 cm/tile 4.24 m/layer.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM1/3 PSR, April 20, 2005 GLAST LAT Tracker Tower-1/3 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
You can take a breath of Helium to change the sound of your voice and demonstrate how density affects the spread of sound. As you talk or sing after.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TART recommendations implementation and qualification program results Alessandro.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
SCANNER THOUGHTS AND DESIGNS NN Group Dmitriy Beznosko| Stony Brook.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
NMOS FABRICATION 1. Processing is carried out on a thin wafer cut from a single crystal of silicon of high purity into which the required p-impurities.
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
TRD straws status report from 14/03/ AMS-02 acceptance for lepton flux N. Nikonov.
Project management Topic 2 Planning.
Testing Hypotheses about a Population Proportion Lecture 29 Sections 9.1 – 9.3 Wed, Nov 1, 2006.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
Hypervelocity Impact Technology Facility (HITF)/SN3 NASA Johnson Space Center GLAST ACD Meteoroid/Debris Shielding Initial Test and Analysis Results NASA.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
HOW TO MAKE AN Spring 2012 Origami Balloon By: SondraVojvodich.
TUTORIAL 1 7/3/2016.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Entrance Muon Counter (EMC)
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
TOWER 3 CONFIGURATION Configuration:
Naotoshi Seo, Hiroshi Toyoizumi Performance Evaluation Laboratory
Mini-Tower test results
Comparison of GAMMA-400 and Fermi-LAT telescopes
Basswood Lengths and Quantities 12” (305 mm) Bottom Horizontals
We have no new trays for tower 4!!
Investigation on tray MID 063 Back
Test box for ProtoDUNE SP – Integration Test
Project 2: Straw Tower Situation: We should build a tower to support some weights. Design brief: To design and make a straw tower for practicing purpose.
Agenda for today: Laser cavity design
GLAST Large Area Telescope:
Memo Report – 1 per TEAM (80 points)
CALET-CALによる ガンマ線観測初期解析
Target Position Guide Plate Target Ladder Rod Adjustment Screws
Modeling Lungs 1. Question:
Presentation transcript:

GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico1 from ANNEX 02 to NCR/FM/INFN/RM2/ cm/tile 4.24 m/layer ~34 m total length of tower0 preventive cut Preventive Cuts (Pcut) Procedure originally thought to prevent delaminations in TVAC only performed on 8 tower0 trays on W-side (8layers)

GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico2 Small ( 1mm) using an edged scalpel Insulation test (OL) with an ohm-meter between tray and shield plane Used for tower0 trays and # TowerA trays Estimate of total bubble-cut for tower0 = 17layers x 2bubbles x 2mm <~ 7cm Bubble Cuts (Bcut) Procedure

GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico3 Tower Position Tray S/N Tray typeWPcutBcut (side)HV Short (side)layers Comments 18001TOPSand-Blasted (SB)NFAIL TVAC Y17No Si 17048MIDSBNY(T/B) X16-X17No Si 16047MIDSBNFAIL TVAC Y15-Y16No Si 15004MIDHand-Blasted (HS)YY(T/B) X14-X15No Si 14017MIDHSYY Y13-Y14No Si 13012MIDHSYY(T)Y(B) X12-X13HV-short on bottom 12011MIDHSYY(T/B)Y(B) Y11-Y12HV short on bottom 11008MIDHSYY(T/B)Y(B) X10-X11HV short on bottom 10006MIDHSYY(T)Y(B) Y9-Y10HV short on bottom 9046MIDSBNY(T)N X8-X9OK 8007MIDHSYY(B)N Y7-Y8OK 7010MIDHSYY(B)N X6-X7OK 6009HEAVYHSYY(T/B)N Y5-Y675 disc. ch. 5008HEAVYHSYY(T/B)N X4-X5183 disc. ch. 4035HEAVYSBNY(B)N Y3-Y4249 disc. ch. 3011HEAVYSBNY(T)N X2-X31319 disc. ch. 2023LIGHT NY(T/B)N Y1-Y2OK 1015LIGHT NY(B)N X0-X121 disc. ch. 0002BOTTOM NY(T)N Y0OK Tower0 trays summary chart

GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico4 0 short on shield lines 4 HV short on trays Pcut and Hand-Sanded W 23 layers OK on HV line (6 Pcut, 15 Bcut) 27 layers OK on shield line (8 Pcut, 17 Bcut)  all shorts due to W whiskers generated from tiles hand-sanding which entered long, deep Pcuts – such whiskers were actually observed on towerA:  NO Pcuts  W tiles are etched and primed, therefore very flat, clean and whiskers-free  Bcuts are superficial (see procedure) Let’s calculate anyway a conservative HV-short probability: a HV short would cause 1 ladder loss (on tower0 trays with HV-short we disconnected HV resistors on MCM boards for all 4 ladders to avoid current flow) Conclusions – risk assessment Prob(1ladder-loss/Bcut) = 4 / 34 m x 2mm = , i.e. 1ladder-loss every 4250 Bcut or 1 ladder with HV-short every 2150 ladders (assuming 1 Bcut every 2 ladders)

GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico5 Conclusions – schedule constraints type TrayI D Bcut - bottomBcut - topMCM pocket B003NA10ready B004NA6,10,11 H0126,10,116,7,15ready H0107,10,116,7,10,11ready H0206,7,11,12 ready H00610,116,7,9,10,11ready H00510,1111ready H0377 small H018 11,15small L01377,11,12,16small L01377,11,12,16small L004106,10small M042 II test article typeTrayID Bcut - bottom Bcut - top MCM pocket M small M ,12,10,14,15ready M05167,10small M077 assembled M063 ready M050 assembled M053 7assembled M0666,107,11ready M079 assembled M0647,8,127,12ready M0817,10,14,15 ready M0802,7,1511,10ready M small M062106,7,9,10,1small M00211 ready T0026,10NANCR List of available trays 3 trays without Bcut and MCM pocket deep enough to hold MCM  GA flow will be slowed until new trays are available without Bcut