1 30 October 2002 Former Five Points Outlying Field (OLF) Neighborhood Meeting October 30, 2002.

Slides:



Advertisements
Similar presentations
Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
Advertisements

Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
South Old Bridge Vol. Fire Co. Standard Operation Procedures for Hazardous Material Incidents.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
US&R Planning. US&R Planning Issues Establish authority and responsibility Assess vulnerability and hazards Identify resources Coordination of response.
BoRit Superfund Site Timeline
Hazardous Materials. Regulation of Hazardous Materials Over 1000 new man-made chemical enter commerce each year Pose a potential risk to life, health.
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
INTRODUCTION TO THE USE OF CERCLA FOR ENVIRONMENTAL CLEANUP PROJECTS USDA FOREST SERVICE Grants and Agreements Workshop February 28, 2002 Great Falls,
Unexploded Ordnance (UXO) -- A Major National Environmental Cleanup Requirement  Millions of Acres Potentially Contaminated  Hundreds of Sites / Locations.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
WWII Navy Bomb Disposal School , on AU campus for research & education CIVIL WAR Ft. Gaines & other forts located near SV area during Civil War.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
30 October 2001 Types of Ordnance Used at Five Points OLF.
Survey Results September Survey Information There is an error margin of ±3.6 on this survey. South Ogden City sent out 5,300 surveys and received.
2010 Long-Term Surveillance and Maintenance Conference Lessons Learned for Institutional Controls at the Weldon Spring Site.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Neponset River Capen Street Investigation Milton, MA Executive Office of Energy and Environmental Affairs (EOEEA) Department of Environmental Protection.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Phase I and Phase II Environmental Site Assessments Environmental Specialist Brownfields/Voluntary Cleanup Program June 2014.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
1 Arroyo Center R UXO Risk Assessment Methods: Critical Review Jacqueline MacDonald, Debra Knopman, J. R. Lockwood, Gary Cecchine, Henry Willis RAND.
Texas Department of Public Safety Division of Emergency Management Debris Management Overview.
2010 Agricultural Water Resource Development Workshop Series HOW TO APPLY FOR ASSISTANCE “PRELIMINARY SITE ASSESSMENT – THE PROCESS”
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
Brandon Real Estate Board - June 19/20031 Your Logo Here ENVIRONMENTAL SITE ASSESSMENTS Phase I ENVIRONMENTAL SITE ASSESSMENTS Phase I.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
La Center, Washington: Balancing Pipelines and Populations 1.
Survey conducted by: National Research Center, Inc th St. Boulder, CO (303) The National Citizen Survey™ LOWER PROVIDENCE.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Briefing for Orange County Board of County Commissioners
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
US Army Corps of Engineers BUILDING STRONG ® Texoma and Missouri Region JETS Training Symposium Resiliency Planning Through Hazard Vulnerability Analysis.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Amherst County Comprehensive Plan (Update)
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
30 October 2001 Five Points OLF History & Chronology.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
LESSONS LEARNED: A CALIFORNIA PERSPECTIVE Robert L. Elliott, Staff Counsel California Environmental Protection Agency, Department of Toxic Substances Control.
2009 STANDARDIZED HOSPITAL OVERHEAD EMERGENCY CODES Recommendations and Guidance for Policy or Operating Procedure Modification Prepared by the Florida.
1% Sales Tax Commission Board Meeting June 3, 2015.
Public Meeting October 21,  Open House6 - 7 PM  Presentations7 - 7:50 PM  Break7: PM  Q & A8 – 9 PM  Conclude9 PM.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Brownfields 2004 September 2004 NTC Orlando Using All the Tools.
1 Historic DoD Ocean Disposal Operations, Requirements, and Research Hawaii Robotics Initiative for Underwater Military Munitions Oahu, Hawaii October.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
RELEASE REPORTING OBLIGATIONS AND THE ENVIRONMENTAL PROFESSIONAL Mississippi Manufacturers Association October 15, 2015.
Early Property Transfer and Privatized Cleanup at Former Military Bases The McClellan Air Force Base Experience Kathleen Johnson, Federal Facilities and.
N. C. Department of Environment and Natural Resources Division of Waste Management Stony Hill Road Contamination Wake County.
Proposed Plan for No Further Action
Environmental Cleanup Program Status
Redevelopment Authority of the County of Washington O
Environmental Cleanup Program Status
Planning Commission Hearing
Hold Your Breath—Ohio EPA’s TCE Initiative
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
Brownfield Corrective Action with Revised RRS
Presentation transcript:

1 30 October 2002 Former Five Points Outlying Field (OLF) Neighborhood Meeting October 30, 2002

2 30 October 2002 AgendaAgenda Expectations for tonight’s meeting Site history and ordnance Activities since last year Results of new activities Soil sampling strategy Ordnance investigation

3 30 October 2002 Expectations for Tonight’s Meeting Discuss FUDS environmental investigations: –Soil sampling for potential chemical contamination –Engineering Evaluation/Cost Analysis (EE/CA) for ordnance and explosives hazards Will not discuss: –Real estate valuations –Seller’s disclosure obligations –Lawsuits

4 30 October 2002 Five Points OLF History & Chronology 1940 Navy acquired site (162 acres) ~1943 use changed from practice landing strip to practice bombing target Fall 1954 Army conducted ordnance surface clearance action July 1956 GSA conveyed property to private owners, when it was used for agriculture until… Early 1980s – Twin Parks Estates built Mid 1990s – South Ridge Hills developed.

5 30 October 2002 Project locator map of arlington

6 30 October 2002 Types of Ordnance Used at Five Points OLF M-47 Chemical Bombs (probably practice type, filled with water, or maybe real with white phosphorus) MK 23 practice bombs (shotgun shell with black powder) M38A2 practice bombs (filled with sand, rust, water, with black powder “spotting” charge)

7 30 October 2002 Examples of MK-23 Practice Bombs taken from Five Points OLF during early 1970s.

8 30 October 2002 Photos showing hollow interior of MK-23 Practice Bombs.

9 30 October 2002 Activities Since Last Year Completed Archives Search Report (ASR). Held Technical Project Planning (TPP) Workshop. (list of invitees) Interviewed various parties, including the former Major Dallas Lynch Acquired $1M funding for immediate actions. Completed Sampling and Analysis Plan (SAP) for soils. Completed first draft of the Engineering Evaluation /Cost Analysis (EE/CA) Report.

10 30 October 2002 Activities Since Last Year Developed project mailing list Mailed project fact sheet to 250+ people Established web site Established Information Repository at Arlington Public Library

11 30 October 2002 Results of New Activities Risk Assessment Code (RAC) score elevated from “2” to “1” (resulted in funding). Developed project close-out statement Clearance certificates refer to a single site (Five Points) Runways were paved with asphalt. M47 chemical bombs were likely practice. Evidence of live ordnance as late as 1970s. List of “contaminants of concern”. Sampling Plan.

12 30 October 2002 Hazard SeverityHazard ProbabilityRACs result from combination of Hazard Severity score and Hazard Probability score. Hazard Severity types of ordnanceHazard Severity score relates to worst mishap that could occur from the types of ordnance used or present. Hazard Probability accessibility of public to ordnanceHazard Probability score relates to accessibility of public to ordnance. Risk Assessment Code (RAC) Scoring

13 30 October 2002 Risk Assessment Code (RAC) Scoring Table (Oct 2001) FrequentProbableOccasionalRemoteImprobable Catastrophic Critical Marginal Negligible None Probability - Accessibility of Public to Ordnance Severity - Type of Ordnance

14 30 October 2002 Risk Assessment Code (RAC) Scoring Table (Feb 2002) FrequentProbableOccasionalRemoteImprobable Catastrophic Critical Marginal Negligible None Probability - Accessibility of Public to Ordnance Severity - Type of Ordnance

15 30 October 2002 Risk Assessment Codes (RACs) RAC 1 – Highest priority – recommend further actionRAC 1 – Highest priority – recommend further action RAC 2 – High priority – recommend further action RAC 3 – recommend further action RAC 4 – recommend further action RAC 5 – No Department of Defense Action Indicated Formerly Used Defense Sites (FUDS)

16 30 October 2002 Technical Project Planning Site Closeout Statement “Substantially reduce safety hazards from ordnance and also health risks from potential DoD environmental contamination so that the Former Five Points Outlying Field community feels and is safe living in the neighborhood.” - Technical Project Planning Team (Corps, TCEQ, USEPA, Tarrant County Health Dept., Arlington Police & Fire Depts., residents’ attorney, KBHome)

17 30 October 2002 Contaminants of Concern from DoD Activities Metals (from bodies of MK 23 practice bombs). Lead Zinc Explosives (from ordnance). TNT Tetryl Degradation products (DNT, etc.). White Phosphorus (from M47 chemical bombs).

18 30 October 2002 Substances Not of Concern from DoD Activities Herbicides (asphalt runways) Fuels (no fueling operations) PCBs (no power) Solvents (no maintenance activities) Pesticides (no structures) Other (no causative activities)

19 30 October 2002 Soil Sampling Strategy Examine areas most likely to be contaminated Central target area (~17.5 acres) Historical drainage areas Top two feet of soil (disturbed site) Examine additional areas of concern. Selected lots with “health issues” Soil at six feet in depth

20 30 October 2002 The Former Five Points OLF - Jan Note faint outlines of old runway boundaries. Mobile home park built in 1980s. N S EW

21 30 October 2002 The Former Five Points OLF, Jan Property boundary in green. Runway outlines in red. Target area outlined in blue. Target center is marked as red bulls eye. All line locations are approximate. N S EW

22 30 October 2002 Five Points OLF in 1943 N

23 30 October 2002 Five Points OLF in 1943 N Target area outlined in blue. Target center is marked as red bulls eye. All line locations are approximate.

24 30 October 2002 Five Points OLF in 1943 N Target area outlined in blue. Target center is marked as red bulls eye. All line locations are approximate. Historical drainage shown in yellow.

25 30 October 2002 Approximate soil sample locations shown as colored dots.

26 30 October 2002 Approximate soil sample locations shown as red and blue dots.

27 30 October 2002 Approximate soil sample locations shown as red and blue dots.

28 30 October 2002 Approximate soil sample locations shown as red and blue dots.

29 30 October 2002 Field Sampling Activities Target Area – 69 locations Non-target area – 48 locations Total117 locations Drainage Areas – 46 locations Non-drainage areas – 71 locations Total117 locations

30 30 October 2002 Field Sampling Activities 117 Sampling locations –117 soil samples at 0” – 24” (top two feet) – 9 soil samples at 60” – 72” (5 – 6 feet) –126 Total soil samples 468 Chemical tests (4 tests x 126 samples) –Lead –Zinc –Explosives –White Phosphorus

31 30 October 2002 Examples of Hydraulic Sampling Equipment

32 30 October 2002 Soil Testing Results Lead and Zinc will be compared to State “average” levels Explosives and white phosphorus will be evaluated by a presence/absence test Any deviations will result in additional sampling

33 30 October 2002 Expectations for Tonight’s Meeting Discuss FUDS environmental investigations: –Soil sampling for potential chemical contamination –Engineering Evaluation/Cost Analysis (EE/CA) for ordnance and explosives hazards

34 30 October 2002 Engineering Evaluation/ Cost Analysis (EE/CA) Purpose: Evaluate ordnance hazards Perform risk evaluation of hazards Perform institutional analysis Identify and evaluate potential response actions to reduce risks from ordnance Recommend one or more response actions

35 30 October 2002 Preliminary Draft EE/CA Preliminary draft still under internal review Final draft expected early 2003 Final draft will be available for public review and comment

36 30 October 2002 Preliminary Draft EE/CA Response Action Alternatives: 1 - No action 2 - Institutional controls (legal, engineering, educational) 3 - Removal of surface ordnance + institutional controls 4 - Removal of surface and subsurface ordnance + institutional controls

37 30 October 2002 Preliminary Draft EE/CA Recommendation: Alternative 4 – Removal of surface and subsurface ordnance + institutional controls Cost: ~ $600K Cleanup Schedule: Start 2003 ($500K funds in budget)

38 30 October 2002 Ordnance Safety DO NOT TOUCH! DO NOT MOVE! Note/record location Call 911 or local law enforcement

39 30 October 2002 Questions?Questions?