Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.

Slides:



Advertisements
Similar presentations
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Advertisements

Study Committee Representatives Annual Report December, 2012
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
CIGRE Paris Session Sunday 24 th – Friday 29 th August, 2014 Monday 25 th … General Assembly Tuesday 26 th … SC A3 meeting Wednesday 27 th AM …
AG.03: CIGRE SC A3 Green Book planning
O.Gjerde WG C2/C5.05 Development and Changes in the Business of System Operators Status report from WG C2/C5.05 Ole Gjerde, Statnett Convenor September.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Doc.: IEEE /0217r0 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
HIGH PERFORMING CHAPTER PROGRAM Presented by Ed Carlsen Awards & Resources Committee Chair Regions 1-7 Chapters Meeting Tampa, Florida June 24, 2007.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
9/4/20151 Cigre WG B1.41 Meeting Long term performance of soil and backfill of cable systems Milan, Italy Mar , 2013 Walter Zenger, USA Convener.
1 CNC-CIGRE Study Committee Report October 18-20, 2010 VANCOUVER CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure.
SC Websites Training of webmasters end of March/ beginning of April Validation of content in April Launching in May/ June (at the end of March, the hosting.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 November 13, 2014.
Electronic Engineering Department Final Year Projects September 2008.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
IEEE Working Group on Broadband Wireless Access Roger Marks, Chair IEEE /0041.
Doc.: IEEE c TG3c July 2007 R. Fisher, Oki Electric Industry co. LtdSlide 1 Project: IEEE P Working Group for Wireless Personal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
Proposed Work Item Title: Maintenance of ITI Profiles Published in 2015 and earlier Proposal Editor: Lynn Felhofer Work item “workers”: members of the.
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Doc.: IEEE Submission July 2006 Ho-In Jeon, Kyung-Won UniversitySlide 1 NOTE: Update all red fields replacing with your information;
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
WG Composition: WG Convener: Bjørn Gustavsen
ISO TC268 SC1 - Smart Community Infrastructures -
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
<SECTION> GOLD Affinity Group
WG Composition: WG Convener: W. A. Radasky
July 2014 doc.: IEEE /21/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
Timeline and Status report
<month year> doc.: IEEE <030158r0> March 2004
SARIF TC Timeline Proposed, approximate.
July 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted:
IEEE Rail Transit Vehicle Interface Standards Committee
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
平成30年12月 doc.: IEEE /424r1 January 2007
WG Technical Editor’s Report
Harmonisation Activity Progress report
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE r1 OWC TG Closing report for Jan.
IEEE 802 2nd Vice Chair last name at ieee dot org
<month year> doc.: IEEE <030158r0> January 2004
IEEE TGaf DRAFT Meeting Plan and Agenda
May 2015 ISO/IEC JTC1/SC6 IEEE 802 Head of Delegation report
Region 4 Secretary Bill Gorder - Secretary January 21-22, 2012
July 2014 doc.: IEEE /24/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
<month year> doc.: IEEE < e> <March 2019>
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
WG Technical Editor’s Report
<month year> doc.: IEEE < e> <March 2019>
International Symposium on Wireless Systems and Networks (ISWSN’03)
Presentation transcript:

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal Arc Testing Convener:Nenad Uzelac (USA) Secretary: Mietek Glinkowski (USA) Year of Kick-off: 2009 Number of Members:20 Regular Members: 19 Corresponding Members:1 Retiring Members: No retiring members New Members: Proposed for approval by SC A3 No new members A3-14(AG01)023-IWD

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 2 Technical activities & discussion items Meetings: First meeting in Delft, Holland (March 2009) 10 th meeting in San Sebastian, Spain (January 2013) 11 th (and Last) held in Stockholm, Sweden (June 2013) Attendance: 60% on average. Used Skype effectively.

Study Committee A3 HIGH VOLTAGE EQUIPMENT Progress of work: Completed short Tutorial (1 hour) Completed REV 11 of the technical brochure Submitted TB to Technical Committee Working Group Activity ReportWG A3.24 AR 2014Page No.: 3 Technical activities & discussion items (cont) 130 pages 7 ANNEXES 60 pages

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 4 Next Steps Publication on behalf of the WG (Title, way of publication, stage of preparation, approximate date of final version 1.Electra Paper – Q2, Poster for CIGRE Paris: Q IEEE paper 4.Tutorials Xian Jiaotong University 2.????

Study Committee A3 HIGH VOLTAGE EQUIPMENT Membership with approval of the last SC meeting Working Group Activity ReportWG A3.24 AR 2013Page No.: 5 Last NameFirst NameCountryCompanyStatus Del RioLuisSpainOrmazabalR DouchinJeromeFranceSchneiderR DullniEdgarGermanyABBR Feitoza CostaSergioBrazilCognitorR FjeldElinNorwayTelemark UniversityR GlinkowskiMietekUSAABBR (secretary) KimHong-KyuKoreaKERIR KriegelMartinSwitzerlandABBR (Past Convener) KweonKi-YeoungKoreaHYOSUNG CorporationRetired Lopez-RoldanJoseAustraliaPowerlinkR PaterRyszardCanadaHydro-QuébecR PietschGerhardGermanyRWTH AachenR ReiherThomasGermanySiemensR Robin-JouanPhillipeFranceArevaRetired SchoonenbergGerardNetherlandsEatonR SinghShailendraGermanySchneiderR SmeetsReneNetherlandsKEMAR UchiiToshiyuki (Toshi)JapanToshibaR UzelacNenadUSAG&WR (Convener) Van der SluisLouNetherlandsTU DelftC VinsonPaulFranceArevaR YoshidaDaisukeJapanMitsubishi Electric CorporationR