Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
St. Croix River Crossing S. P
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Ohio Department of Transportation District 9 I RONTON -R USSELL B RIDGE R EPLACEMENT
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract E4 March 12, 2003.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Chapter 34 Bridge Construction.
Totally Precast Concrete Bridges
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Bridge Vulnerabilities Oct What puts bridges at risk? Ability to withstand seismic forces and displacements.
Multidisciplinary Office Building For Baker Architects Presented By Presented By:
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
There are many types of bridges including:
1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.
California Department of Transportation District 4 Oakland Seismic Retrofit Project Presentation to the California Transportation Commission July 26, 2007.
Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.
Risk Sanibel Island Bridges &Toll Plaza Case Study Doug Cox, PE.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Bridge Engineering Section Bridge Rehabilitation.
1 P H I L L I P S T O N Route 2 Over Route 2A SPMT Heavy Lift September 8, 2015| Leading the Nation in Transportation Excellence |
SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Intermodal PPPs and Availability Payments Focus Georgia 27 April 2007.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
Problem Statement High level of activity in region and state. Construction costs increased 20% to 50% over past year. Commodity price increases Commodity.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Constructability Workshop Nov. 20, 2002 In Bay.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Construction Notes Amer Bata, Area Construction Manager.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Overview of the “Recommended LRFD Seismic Design Specifications for Highway Bridges” Ian M. Friedland, P.E. Bridge Technology Engineer Federal Highway.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 November 30, 2005.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-bid Meeting February 5, 2003.
Contractor Alternate Design Serving the Public’s Best Interest.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003.
DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Beam Bridge. Sidney Lanier Bridge Under Construction.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Business Enterprise Outreach Program 2003.
STRESS RIBBON BRIDGE   1 1.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Project Purpose and Objective
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
Bridge Facts The Basics Bridge Replacement Budget Process
PROJECT DELIVERY METHODS
Southwood/Fargo Country Club Flood Risk Management Project
Presentation transcript:

Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS with Revised Bid Provisions Will delay project completion by 1 to 1.5 years Cost could be reduced if there are multiple bidders There are potential risks in re-bidding:  Current bidder does not resubmit bid  Costs could increase (steel, concrete, etc.)  Re-bid schedule could be delayed  Option #3 - Re-Design and Bid Design/Build Cable-Stayed Bridge Design Will delay project completion by 2-1/2 years to 4 years. Construction costs would be reduced from SAS Substantial risk in revising bridge design:  Substantial schedule impacts due to re-opening process for selecting design & environmental review, and permits  Design has not been completed for cable stay designs & seismic assessment has not been conducted ANALYSIS OF SAS BID OPTIONS - Summary of Findings

Option #4 - Re-Design and Bid Design/Build Skyway Bridge Design Will delay project completion by 2-1/2 years to 4 years (construction duration could potentially be reduced from cable stay design; however, actual construction duration is difficult to determine at this time). Construction costs would be reduced from SAS and Cable Stay bridge Substantial risk in revising bridge design:  Substantial schedule impacts due to re-opening process for selecting design & environmental review.  Substantial schedule impacts due to re-opening permit process, especially since Skyway design includes an additional set of piers in S.F. Bay.  Design has not been completed for Skyway design & seismic assessment has not been conducted  High potential of a single bidder since current Skyway contractor would have competitive advantage (mobilized at site for similar construction as current Skyway contract, has established yard for superstructure fabrication, etc.) ANALYSIS OF SAS BID OPTIONS - Summary of Findings

Self-Anchored Cable Suspension Bridge Bid Options

Cost Breakdown of Options 2 and 3

Cost Breakdown of Option 4

SFOBB East Span Replacement Project Approximate Span Lengths: Skyway6,850 feet Skyway6,850 feet SAS2,100 feet SAS2,100 feet

SFOBB East Span Segments SKYWAY SUSPENSION YBI TRANSITION OAKLAND TOUCHDOWN YBI TRANSITION SUSPENSION SKYWAY OAKLAND TOUCHDOWN