GRAIN HARVESTER REPAIR AND MAINTENANCE COSTS Saleh A. Al-Suhaibani Mohammed F. Wahby King Saud University Saudi Arabia.

Slides:



Advertisements
Similar presentations
Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
Advertisements

Significance Testing.  A statistical method that uses sample data to evaluate a hypothesis about a population  1. State a hypothesis  2. Use the hypothesis.
National Injury and Fatality Data for Aging Farmers John R. Myers Larry A. Layne Suzanne M. Marsh National Institute for Occupational Safety and Health.
1 An analysis of the labour market, employment income and low-income employees in Hong Kong 16 December 2005.
Summary of “Factors Affecting Construction Practices in Makkah, Saudi Arabia” Written by: Sami Barhamain October 1986 (CEM 520) Presented by: Ehab A. Qahwash.
YIELD AND YIELD COMPONENT ANALYSIS OF ONION CULTIVARS GROWN IN ARID REGIONS ABDULLAH A. ALSADON Department of Plant Production, College of Agriculture,
Hulless barley (Hordeum vulgare L.) resistance to pre-harvest sprouting: diversity and development of method for testing of breeding material L.Legzdiņa,
By Saleh A. Al-Hassoun Associate Professor Department of Civil Engineering College of Engineering King Saud University Riyadh, Saudi Arabia
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
Copyright © Cengage Learning. All rights reserved. 8 Tests of Hypotheses Based on a Single Sample
SUMMER Internship Marks Allocation 2 Marking CriteriaMarks Allocated Workshops (4 in total)4*5 = 20 marks Academic Supervisor Attendance5 Report.
Assemblies Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
CONSTRUCTION INDUSTRY OVERVIEW AND FACTS. VALUE OF CONSTRUCTION Construction put in place during June 2002 was estimated at a seasonally adjusted annual.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
بسم الله الرحمن الرحيم. King Saud University College of Engineering Department of Industrial Engineering King Saud University College of Engineering Department.
Kingdom of Saudi Arabia King Saud University College of Engineering Industrial Engineering department ERGONOMICALLY DESIGN, DEVELOPMENT, AND IMPLEMENTATION.
Inventory Management for Independent Demand
University Center Research Team Dr. Scott Dempwolf, Ph.D., EDA Center Director Zhi Li, Ph.D. student Matthew Earls, Ph.D. student Kerry Li Fang, Ph.D.
Ibrahim Almutaz 1, AbdelHamid Ajbar 2, Emad Ali 3 1 Chemical Engineering Dept., King Saud University, Riyadh, Saudi Arabia
Case 1: Optimum inspection and maintenance rates (wind turbine is available during inspection) Case 2: Optimum inspection and maintenance rates (wind turbine.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 9 Cost Concepts in Economics.
TIME SERIES by H.V.S. DE SILVA DEPARTMENT OF MATHEMATICS
Measurement of Agricultural Output in the Australian System of National Accounts: Methods and Issues Authors: Rick Brunton and Carol Trickett Presenter:
African Centre for Statistics United Nations Economic Commission for Africa Chapter 6: Chapter 6: Data Sources for Compiling SUT Ramesh KOLLI Senior Advisor.
Preliminary study For Saudi footwear standardization Done by : Bandar AL-Ghamdi & Qassem A. AL-Akkam Supervised by : Dr. Mohamed T.Ibrahim El-Wakad.
Statistics for Business and Economics Chapter 1 Statistics, Data, & Statistical Thinking.
1 Mortality Compression and Longevity Risk Jack C. Yue National Chengchi Univ. Sept. 26, 2009.
Maintenance Workload Forecasting
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
Copyright © 2005 Brooks/Cole, a division of Thomson Learning, Inc Chapter 10 Introduction to Estimation.
Chapter 8 : Estimation.
Hospital Based Surveillance to Estimate the Burden of Rotavirus Gastroenteritis Among European Children Younger than 5 Years of Age Johannes Foster, Alfredo.
MARKET APPRAISAL. Steps in Market Appraisal Situational Analysis and Specification of Objectives Collection of Secondary Information Conduct of Market.
Copyright © 2010 Pearson Addison-Wesley. All rights reserved. Chapter 9 One- and Two-Sample Estimation Problems.
Advisor : Tzu-Yao Tai Advisee : Lung-yu Chang Department of Mechanical Engineering & Institute of Nanotechnology, Southern Taiwan University of Science.
IENG 217 Cost Estimating for Engineers Product Estimating.
Lecture PowerPoint Slides Basic Practice of Statistics 7 th Edition.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
CHARACTERIZING CLOUD COMPUTING HARDWARE RELIABILITY Authors: Kashi Venkatesh Vishwanath ; Nachiappan Nagappan Presented By: Vibhuti Dhiman.
Above and Below ground decomposition of leaf litter Sukhpreet Sandhu.
PSAA Curriculum Unit Physical Science Systems. Problem Area Energy and Power Systems.
Lactation Number Effects on the Genetic Variability of the Stearoyl Coenzyme-A Desaturase 9 Activity Estimated by Test-Day Model V. M.-R. Arnould 1, N.
Monday, June 23, 2008Slide 1 KSU Females prospective on Maternity Services in PHC Maternity Services in Primary Health Care Centers : The Females Perception.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
Occupational safety and health of different industrial sectors in Khartoum State, Sudan–II- Analysis of occupational accidents and injuries.
Introduction Data Statistical Methods Table 1: Prevalence of Prior Hip Fracture and Incidence of New Hip Fractures and Fractures of Any Type.
Summary of presentation Introduction of the dissertation.
Studio 4. Project Planning and Literature Review
IMPLEMENTING LEAN SIX SIGMA IN THE PALESTINE POULTRY COMPANY
Test of independence: Contingency Table
Xiaoli Zhao, Ye Fan, Ming Fang
Parametric calibration of speed–density relationships in mesoscopic traffic simulator with data mining Adviser: Yu-Chiang Li Speaker: Gung-Shian Lin Date:2009/10/20.
Studio 4. Project Planning and Literature Review
Copyright (c) 2005 John Wiley & Sons, Inc.
Introduction to Expert Systems
“Cost Driver” (the activity) Owning a car
Models for estimate yield losses due to wheat rusts and powdery mildew By Dr.Gamalat Abd-Elazize& Dr. Mohamed Abdelkader Wheat Diseases Research Department.
On the equality of resistivity fractal dimension and geometric relaxation time fractal dimension of induced polarization for characterizing Shajara Reservoirs.
Parametric calibration of speed–density relationships in mesoscopic traffic simulator with data mining Adviser: Yu-Chiang Li Speaker: Gung-Shian Lin Date:2009/10/20.
خشنه اتره اهورهه مزدا شيوۀ ارائه مقاله 17/10/1388.
Chapter 9 One- and Two-Sample Estimation Problems.
CHAPTER 1 Exploring Data
Off-Road Equipment Management TSM 262: Spring 2016
CHAPTER 1 Exploring Data
CHAPTER 1 Exploring Data
CHAPTER 1 Exploring Data
Dr. N. S. Harding Chemical Engineering 477 March 8, 2018
1.03 Write internal and external business correspondence to convey and obtain information effectively.
CHAPTER 1 Exploring Data
CHAPTER 1 Exploring Data
Presentation transcript:

GRAIN HARVESTER REPAIR AND MAINTENANCE COSTS Saleh A. Al-Suhaibani Mohammed F. Wahby King Saud University Saudi Arabia

INTRODUCTION Several studies on R&M costs for combines had been worked out. Most of the studies resulted with exponential models as a function of engine operating hours, Bowers and Hunt (1970), Fairbanks et al (1971), Rotz and Bowers (1991), ASAE standards (1993), Gliem et al (1989) Abdulmotaleb (1993). Al-Suhaibani and Wahby (1999), Wahby (1995), Wahby and Al-Suhaibani (1995) More research studies needs to be done of the details of the cost components to improve the cost models for better estimate. The components of R&M costs for any machine could be classified according to the type of job performed for the machine..

Objectives 1.To classify types of repair and maintenance events. 2.study the effect of the combine age (working life) and cutting width on repair and maintenance costs.

Materials and Methods 1.Repair and maintenance data of grain harvesters collected by HADCO (Hail Agricultural Development Company), Saudi Arabia, were used in this study. 2.The data of 15 harvesters out of 40 owned by the company were used. 3.Each WJO included the following data: date of the job, harvester serial number, machine power, type of work done, number and cost of the parts used, total labor requirement and the related cost, and the total cost of the WJO. 4.The data covered the period from 1988 to 1993.

Saudi Arabia Map

Hail Agricultural Development Company (HADCO) Map

Sample of the work job order

Data for 352 WJO obtained from HADCO were sorted and classified as repair or maintenance according to the ASAE Standard. The statistical package SAS was used in the analysis of the classified data, and the results were examined to get the significance between repair and maintenance cost.

Results Table 1: Grain harvester's characteristics

Figure 1: Grain harvesters repair and maintenance work orders ratios. Repair (71.9%) Maintenance (28.1%)

Table 2: Grain harvesters work orders and type of job.

Table 3: Grain harvesters repair and maintenance mean total cost*. * 1US$ = 3.75 SR** Cost/ p. price.

Both figures show that the costs of either repairs or maintenances were increasing gradually for some years until reaching a maximum value, then started to decrease after a major repair or maintenance. It was noticed from figures 2 and 3 that there was a close relation between repair and maintenance in term of costs; for example, when the annual mean total costs of repairs were at high value, the annul mean total costs of maintenance went to a low or moderate value.

Figure 2: The distribution of mean annual repair costs as related to harvester's age.

Figure 3: The distribution of mean annual maintenance costs through the harvester's age.

Figure 4: The relationship between harvester age, cutting width, and mean annual R&M costs.

Conclusions 1. Of all work job orders received, about 72 % were for repairs and 28% for maintenance. 2. Mean total costs were significantly higher than maintenance costs, and represented 83.8% of mean total costs. The most common repairs were pre-harvest followed by general and engine repairs. The most common maintenance was in the following order: engine, electrical, general, and pre-harvest maintenance. 3. Pre-harvest repairs were usually executed every year before harvesting season. The pre-harvest repairs reduced costs of most of other repair or maintenance jobs in the machines during the harvesting season. 4. R&M mean total costs were directly related to both cutting width and harvester age.

Thank You