Final Conference of the INTERREG III C project MunServNet 29-30 October 2007, Berlin NEGOTIATION OF Z. KARACSONYI AND I. CIURSAŞ ON THE PARTICIPATION OF.

Slides:



Advertisements
Similar presentations
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
Advertisements

KfW Development Bank Activities in South East Europe
WATER REGULATORY AUTORITY OF ALBANIA ARJAN JOVANI, VICE – CHAIR OF NATIONAL COMMISSION OF W.R.A FLORENCE, 28 NOVEMBER 2013 OVERVIEW ON ALBANIAN WATER SECTOR.
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
UWWT directive in Croatia – implementation and data availability
1 WATER IN CATALONIA Institut Arnau Cadell Comenius Project
Donors’ Conference on Sustainable Energy for Kosovo
0 0 Water Sector and Regulation in ALBANIA WATER REGULATORY AUTHORITY Avni DERVISHI Chairman of Albanian WRA November 25,2013, Florence.
Public access in water supply and waste water treatment sector Edlira DERSHA Ministry of Environment of Albania Geneva, December 2013.
(LSI Ltd.). Łódź in the centre of Europe Area: km2 Population: 768,000 inhabitants Inhabitants of Łódź at economically productive age: 506,000 Higher.
Waste water treatment - conforming to EU Waste Water Directive study case of Tg. Mures Otto DARABAN General Director SC Compania Aquaserv SA.
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
Indicator pilot project – 2012 Environment and Energy Operational Program.
LIFE+ Environment project: LIFE 09 ENV/GR/ Presentation of the LIFE+ project: Strategic Planning Towards Carbon Neutrality in Tourism Accommodation.
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
Supervision of the quality of water intended for human consumption by State Sanitary Inspection bodies Małgorzata Kedzierska Environmental Hygiene Dept.
MAKING USE OF IPA IN CROATIA – OPERATIONAL PROGRAMMES UNDER COMPONENTS III AND IV 13 November 2007.
„Extension and modernization of water and wastewater infrastructure in Arad County”
WATER AND WASTEWATER Ltd. Rijeka REPUBLIC OF CROATIA Andrej Marochini, B.Sc.C.E.
CONSILIUL JUDETEAN CALARASI
WATER ISSUES IN THE EASTERN EUROPE:
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen September.
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Tenth Cohesion Fund (Regulation 1164/94) Monitoring.
Member of: Austrian Showcase Sarajevo
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
DAMBOVITA COUNTY COUNCIL MODERNIZATION OF S.C. MORENI INDUSTRIAL PARK S.A. Local initiative. Regional development.
Vienna, May 2014 National Agency for Energy Regulation of Moldova (ANRE)
The implemented reforms and progress on developing a strategy for the WSS sector in Armenia The implemented reforms and progress on developing a strategy.
14/10/2015European Agency for Reconstruction1 Water & environment.
Institute of Urban Water Management. Technical & Chemical Laboratory.
EU Financing in Environmental Sector during April 2008.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
A National Prioritized Project Pipeline and Environmental Operational Program Republic of Turkey Ministry of Environment and Forestry.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Final Regional Meeting Milano, December 14th 2007 Project supported by the European Commission Eco - innovation in Regione Lombardia Giuseppe Rotondaro.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
Urban water supply The privatization process in Mozambique
Republic of Croatia Ministry of Environmental Protection, Physical Planning and Construction Experience in Implementation of IPA Projects in Croatia Brussels,
EUROPEAN STANDARDS AND LEGISLATIVE REGULATIONS CONCERNING ENVIRONMENTAL PROTECTION IN COMPARISON TO THE LAW EXISTING IN POLAND.
Cross-border projects 2007: Jelgava - Siauliai Jelgava city administration Liene Rulle project manager.
Presentation of IBW - Estonian Delegation - 29th October 2015 Baudouin le HARDY de BEAULIEU, General Manager.
« Performing Efficient Models of Administration Capacity and Regional Reform in the European Union» European Parliament 15 October 2008 Bruxelles Romanian.
Knowledge Direct Support SMART+ STRATEGIC EXCHANGE SMART+ Methodology for Strategic exchange of GPs for the improvement of SMEs innovation capacity Sevilla,
Overview of Jaspers Assistance in Croatia Jakša Puljiz, Ph.D, Deputy Minister, Ministry of Regional Development and EU Funds.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
11-14 April 2011 A P A V I T A L (Iai – Romania) general overview U.S. Civil Water and Wastewater Industry Program in Romania & Moldova - BUCHAREST.
Seminar “American Expertise and technology for the water and wastewater sector” 11 April 2011 Business Opportunities in the Romanian water and wastewater.
Ward City River & Environs Peri- domestic (street, school, work- place) Home The urban environment  World Bank 2004.
C ONNECTION OF POPULATION TO PUBLIC WATER SUPPLY Jana Jankova Desk officer of Department of State Administration of Water Management and River Basin Ministry.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
Energy and Water Regulatory Commission (EWRC)
Sanctions and allowances – Based on examples of some Hungarian regions
Utility Benchmarking for Improvement
Connection methods in district heating networks
WATER SUPPLY & SEWERAGE AUTHORITY Bethlehem-Biet Jala-Biet Sahour
Water projects under The Cohesion Fund.
COHESION FUND MONITORING COMMITTEE
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
IMPLEMENTATION OF ARTICLE 9
Shoumen Water Cycle Improvements
Sandro Zeničanin Ivana Torbica KP ’’Vodovod’’ a.d Gradiška
A progressive but still unfinished business
Presentation transcript:

Final Conference of the INTERREG III C project MunServNet October 2007, Berlin NEGOTIATION OF Z. KARACSONYI AND I. CIURSAŞ ON THE PARTICIPATION OF THE WATER COMPANY ORADEA (RO) CLIMACT IN THE CLIMACT INTERREG IVC PROJECT Oradea, 23 October 2007

APA Oradea S.A Water Supply Committee 1894First water supply work m 3 /day capacity 1910 Waste water treatment plan City of Oradea No. of inhabitants: County centre Water resource: River Crişul Repede/Sebes-Koros (bank filtered drain) Consumption: l/person/day Water production plus

Data Beneficiaries: domestic consumers connected to the water network domestic consumers connected to the sewerage network

Main activities Loss reduction strategy (rehabilitation of the water supply network) Loss reduction strategy (rehabilitation of the water supply network) Environment and water quality protection strategy Environment and water quality protection strategy –Laboratories and their accreditation –Separation of the waste water and rain sewers –ISO 9001, ISO and OH SAS standards Extending water supply and sewerage network Extending water supply and sewerage network Monitoring the distribution network and metering of consumers of blockhouse level Monitoring the distribution network and metering of consumers of blockhouse level ISPA project ( ): The rehabilitation of the sewerage system and wastewater treatment plan in Oradea ISPA project ( ): The rehabilitation of the sewerage system and wastewater treatment plan in Oradea Estimated cost for period is 140 M EUR Estimated cost for period is 140 M EUR

METROPOLITAN AREA OF ORADEA Oradea + 8 surrounding communes (Water Company Oradea as the „Regional Operator”) Oradea + 8 surrounding communes (Water Company Oradea as the „Regional Operator”) –Biharia, 3900 inhabitants –Bors, 3400 inhabitants –Cetariu, 2300 inhabitants –Osorhei, 6100 inhabitants –Sanmartin, 8000 inhabitants –Nojorid, 4500 inhabitants –Santandrei, 3900 inhabitants –Paleu, 1700 inhabitants Conclusion: Water Company Oradea is totally eligible for being a partner in the CLIMACT project regarding its recent operation as well as its future activity. Human capacity is available, and the University of Debrecen is ready to assist them continuously during the project implementation (project activities, content and financial reports, etc.) Conclusion: Water Company Oradea is totally eligible for being a partner in the CLIMACT project regarding its recent operation as well as its future activity. Human capacity is available, and the University of Debrecen is ready to assist them continuously during the project implementation (project activities, content and financial reports, etc.)

Thank you for your kind attention!