Contracting Emergency Response Services True North Emergency Management Neel-Schaffer, Inc. Nelson Lucius, PE.

Slides:



Advertisements
Similar presentations
AIRS/UWA Disaster Response Team: What to Expect When Disaster Strikes I&R Training & Education Conference June 1, 2009.
Advertisements

Practical Preparations Planning for Safety and Emergencies.
Why Plan Ahead? Limit Susceptibility Limit Risk Contain Material Loss Contain Human Impact Limit Down-Time Ensure Longevity FEMA Fact: 80% of businesses.
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
FPL Hurricane Assessment Operating Committee January 25, 2005.
U.S Fish & Wildlife Service Southeast Region “Steady In The Storm” ERFO Process Jo Ann Clark - Refuge Roads/ERFO Coordinator Joe Girot – Refuge Roads/ERFO.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Introduction to Recovery
 Ron Campbell University of North Carolina Chapel Hill, Emergency Management Coordinator 24 years of experience in emergency management including more.
City of Washington Hurricane Isabel Response September 2003.
MODULE 3. MANAGING EMERGENCY RESPONSE Dick Evans.
K ENTUCKY T RANSPORTATION C ABINET Emergency Preparedness Engagement AASHTO Internal/External Audit Subcommittee Conference-July 2012 Alice S. Wilson –
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
Urban Forest Strike Team Team Leader Reintroduction Urban Natural Resources Institute March 10, 2011 Dudley R. Hartel, Center Manager Eric Kuehler, Technology.
PUBLIC WORKS ENGINEERING DIVISION HURRICANE RESPONSE RESPONSIBILITIES.
Creating Operational Debris Management Plans and Templates
PROCEDURES FOR SELECTING THE CONTRACTOR
Organizational /Congregational Preparation. The Plan.
State Debris Management Plan California the “Disney Land of Disasters”
Engineering & Buildings Procurement Seminar.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Texas Department of Public Safety Division of Emergency Management Debris Management Overview.
Pre-Disaster Contracts, Evaluation, Estimating and Reconstruction.
AmeriCorps in Times of Disaster AmeriCorps Conference July 23,
SDS within Family Care.  ADRC options counseling  Composition of the team  Assessments, Outcomes, and the RAD process.  The choice to self-direct.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Presentation to Qwest Travel Services Meeting and Events Commodity Meetings Where Everything Works.
IS-700.A: National Incident Management System, An Introduction
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
INTRODUCTION TO LAW, PUBLIC SAFETY, CORRECTIONS AND SECURITY.
U.S. General Services Administration Josh Sawislak Chief (Acting) Office of Emergency Response and Recovery 27 March 2008 National Response Framework ESF-7.
Effectively Managing Transit Emergencies. Nature of Emergencies and Disasters Overview What Is an Emergency? What Is a Disaster? Differences What Is Emergency.
Communications in the Face of Crisis Lesley Bruinton Tuscaloosa City Schools.
Arkansas Natural Resource Commission 2015 Accreditation Workshop.
NAVIGATING THE STORM Disaster Debris Management March 2014 Ice Storm Chris Marriott Deputy Director – Field Operations Department.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
COVER YOUR BASES By: Pete Spatara By: Pete Spatara Director of Public Works Director of Public Works City of West Palm Beach City of West Palm Beach.
Emergency Response The First 72 Hours Presented by Frederick J. Krishon, P.E. Senior Vice President Director of Facilities Service LAW Engineering and.
Disaster Planning The Ten Commandments of Success June 2014.
Visual 6.1 Incident Resource Management Unit 5: Incident Resource Management.
Jose Chavez Jr, Quality & Technical Services Engineer Hugo Razo Process Owner.
How an Electric Utility can get ready for FEMA Marci Lopez P.E.
Infrastructure Development & Needs From a Commercial Viewpoint Chris Hendrix General Manager, Texas Retail Energy, LLC Manager of Energy Procurement, Wal-Mart.
Red Simpson, Inc. - who are we? Powerline Contractors – build & maintain high Powerline Contractors – build & maintain high voltage lines, overhead & underground.
1 EMERGENCY DEBRIS REMOVAL PLAN. 2 Debris Removal Areas.
September 2, hrs. SEOC LEVEL 1 24 Hour Operations.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
New Madrid EX branch Briefing October 30, Please move conversations into ESF rooms and busy out all phones. Thanks for your cooperation. Silence.
Health Safety and Preparedness.  Identify the resources required to develop and maintain a safe and prepared workplace  Understand the key roles and.
Debris Removal Fundamentals The Charley, Francis, and Jeanne Experience 2004 City of Orlando, Florida.
Alabama Emergency Management Agency Brock Long, Director.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
Nassau County Disaster Debris Management Plan Debris Planning Team Meeting 1, April 24.
Central Houston, Inc. Houston Downtown Management District 909 Fanin, Suite 1650 Houston, Texas / Operations
KY FEMA DEBRIS DOCUMENTATION Ice Storm extent.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Establishing Regional Operation Standards for Emergency Mass Prophylaxis Dawn Sibor Brookline Health Department.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
PDA’s from Snowstorms to Tornados
1,000 Year Flood Lessons Learned After A State Disaster Norma J
Weathering the Storm The Top 10 things you need to know to make money during a spike demand event. Disaster Response • Water Damage.
CONTRACT ADMINISTRATION
Hurricane Pam Exercise
Oklahoma Department of Emergency Managment
Declarations and Disaster Assistance ID
Presentation transcript:

Contracting Emergency Response Services True North Emergency Management Neel-Schaffer, Inc. Nelson Lucius, PE

Emergency Response Services  Disaster Debris Removal  Disaster Debris Monitoring  Bridge Safety Inspections

Types of Disasters  Hurricanes  Terrorism  Tornadoes  Winter Storms  Floods

In House vs. Contracting for Emergency Response Services  Size of Disaster  Demands on DOT Staff  Staffing Levels  Normal Job Functions

Contracting Pre-Event vs. Post-Event  Quick Response  Thorough Evaluation of Proposers  Better Prices  Qualified Vendors

Emergency Response Services  Disaster Debris Removal  Disaster Debris Monitoring  Bridge Safety Inspections

Methods of Contracting for Emergency Response Services  Specific Service Pre-Event RFPs  Post-Event Contracting  Utilization of Existing Master Agreements

Basis of Payment  Cubic Yard of Debris Removal  Tonnage of Debris Monitoring  Hourly Debris Monitoring  Hourly Bridge Safety Inspections  Unit Bridge Safety Inspections

Selection Criteria  Price  Qualifications  Emergency Response Experience  Broad Based Experience  Capacity  Response Time

Advantages of Pre-Event Contracting  Selection of Most Qualified Providers  Quick Response  Pre-Mobilization  Continuity of Normal Job Functions  Maximum Reimbursement  Best Prices

Mobilization – Pre-Landfall  Mobilize Strike Team – PM, Data Manager, etc.  Establish communication w/client & contractor  Key Supervisors on “stand-by”  Logistics – supplies, equipment, lodging, etc.  Planning – review DMP, DMS sites, maps, etc.

Mobilization – Post-Landfall  Initial Damage Assessment  Establish Local Command Post  Mobilize Key Managers and Supervisors  Verify Equipment, Supplies, Mgmt Team On-Site  Meet w/DOT & Contractor to Finalize Project Approach – DMS Sites, Certification Process, Number of Crews, Start Date, etc.

Recordkeeping Equipment certification process Equipment certification process 5-part load ticket/Electronic load ticket system 5-part load ticket/Electronic load ticket system Daily logs/Incident Reports Daily logs/Incident Reports Data reconciliation Data reconciliation Invoice review and recommendation Invoice review and recommendation

Contracting Emergency Response Services True North Emergency Management Neel-Schaffer, Inc. Nelson Lucius, PE