José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Progress with coupling FUI and CWE region
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Global Competitiveness in a Liberalised EU Energy Market The Role of ENTSO-E Ifiec Energy Forum Brussels Daniel Dobbeni.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
efficient capacity allocation method
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Lord Mogg Chair, ERGEG Madrid Forum, 14/15 January 2010 Strategy for market integration and the role of the Regional Initiatives.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Electricity Regional Initiative – Convergence and Coherence of the Regional Development Ms Asta Sihvonen-Punkka Chair of the ERGEG Electricity Focus Group.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
ACER’s view on the future role of the Gas Regional Initiative
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
ERGEG Benchmarking report on long term transmission rights
ACER’s view on the future role of the Gas Regional Initiative
Presentation transcript:

José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review

2XIX Florence Forum, 14 December 2010 PART 1: The ERGEG ERI Status review The RIs Status Review The RIs under the new context of the Third Package FGs & NCs: Pathways to take for regional projects Future interaction between RIs and the FG process PART 2: Progress at a glance from the perspective of the draft FGs on CACM Capacity Calculation Long-term Day-Ahead Intraday List of contents

3XIX Florence Forum, 14 December The ERGEG ERI Status Review The RIs Status Review Published on 10 November 2010 Contributions from ERI & GRI TFs Progress achieved in the regions since November 2009 Analysis per region and per topic First time - Case studies & policy advice from regions’ experiences

4XIX Florence Forum, 14 December 2010 The RIs under the new context of the Third Package RIs have an important role to play in: Encouraging progress on the ground Informing the development of the cross-border regulatory framework Encouraging early implementation of draft FGs & NCs where this is practicable RIs organised to facilitate necessary co-ordination of key actors. 1. The ERGEG ERI Status Review

5XIX Florence Forum, 14 December 2010 FGs & NCs: Pathways to take for regional projects After years of voluntary progress, the time to implement is coming with the existing platform. FGs & NCs - the more defined they are the more regional progress will happen. Feedback to ACER. The FGs on CACM are setting the framework to converge within and among regions. Regions have to move towards the target model (capacity calculation, LT, Day-Ahead, Intraday) 1. The ERGEG ERI Status Review

6XIX Florence Forum, 14 December The ERGEG ERI: Progress at a glance from the perspective of the draft FG CACM Capacity calculation A harmonised and more coordinated methodology for capacity calculation based on physical network reality CSE & NE already applies a common transmission network model (ATC) CWE and CEE regions: ongoing projects for flow- based capacity calculation  ERGEG encourages enhanced coordination at European level

7XIX Florence Forum, 14 December 2010 Long-term A common allocation platform with common allocation rules CSE region and northern borders of Switzerland: extension of CASC-CWE platform beginning of Rules harmonisation between the two regions on schedule. CEE region: implementation of CAO with common allocation rules beginning of FUI region: ongoing projects for coordinated regional allocation (platform) SW region: a pending election (interaction with MIBEL)  ERGEG welcomes progress made at cross-regional level 2. The ERGEG ERI: Progress at a glance from the perspective of the draft FG CACM

8XIX Florence Forum, 14 December 2010 Day-ahead One single Price Coupling all over Europe From ITVC to price coupling in CWE-NE Price coupling Italy-Slovenia (CSE) Price coupling MIBEL-CWE (SW) Price coupling Britned-CWE in IFA in 2012 (FUI) Price coupling NE-Estonia:  ERGEG encourages coordination of all the ongoing projects and a strong co-operation between PXs and TSOs to implement a pan-European price coupling 2. The ERGEG ERI: Progress at a glance from the perspective of the draft FG CACM

9XIX Florence Forum, 14 December 2010 Intraday Implicit continuous & auctions if sufficient liquidity Implementation of an open intraday continuous trading between France and Germany Ongoing NWE ID project between GB, CWE and Nordic regions SW: ongoing improvement of intraday model in regional interconnections FUI: ongoing SEM introduction of intraday trading NE-Baltic: continuous implicit allocation to Estonia  ERGEG encourages development of projects at regional level 2. The ERGEG ERI: Progress at a glance from the perspective of the draft FG CACM

10XIX Florence Forum, 14 December 2010 Thank you for your attention!